Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000483/202300419 January 2024Integrated Inspection Report 05000483/2023004Boric Acid
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Weld Overlay
Enforcement Discretion
Probabilistic Risk Assessment
Nondestructive Examination
VT-2
Functionality Assessment
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Liquid penetrant
Fire Protection Program
Substantial potential for overexposure
Power change
Overexposure
IR 05000483/202301015 November 2023NRC License Renewal Phase 1 Inspection Report 05000483 2023010License Renewal
IR 05000483/20233019 November 2023NRC Examination Report 05000483-2023301Temporary Modification
ML23293A26524 October 20233rd Quarter 2023 Integrated Inspection ReportFitness for Duty
Ultimate heat sink
Stroke time
Internal Flooding
Past operability
Temporary Modification
Functionality Assessment
Process Control Program
Operability Determination
License Renewal
Fire Protection Program
IR 05000483/202401224 October 2023Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000483/2024012)Cyber Security
IR 05000483/202340113 September 2023NRC Security Baseline Inspection Report 05000483/2023401Fitness for Duty
Significance Determination Process
IR 05000483/202300523 August 2023Updated Inspection Plan for Callaway Nuclear Power Plant, Unit 1 (Report 05000483/2023005) - Mid Cycle Letter 2023Fitness for Duty
Commercial Grade Dedication
Cyber Security
License Renewal
IR 05000483/202300210 July 2023Integrated Inspection Report 05000483/2023002Safe Shutdown
High winds
Ultimate heat sink
Fire Barrier
Internal Flooding
Enforcement Discretion
Temporary Modification
Functionality Assessment
FLEX
Significance Determination Process
Operability Determination
Maintenance Rule Program
Through-Wall Leak
Through Wall Leak
Fire Protection Program
Hourly Fire Watch
IR 05000483/202301115 June 2023Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000483/2023011Ultimate heat sink
GOTHIC
ML23122A3178 May 2023Review of the Spring 2022 Steam Generator Tube Inservice Inspections
IR 05000483/202300112 April 2023Integrated Inspection Report 05000483/2023001Boric Acid
Ultimate heat sink
Enforcement Discretion
Functionality Assessment
Significance Determination Process
Surveillance Frequency Control Program
Operability Determination
Fire Protection Program
IR 05000483/202340229 March 2023NRC Security Baseline Inspection Report 05000483/2023402Fitness for Duty
Contraband
IR 05000483/20220061 March 2023Annual Assessment Letter for Callaway Plant (Report 05000483/2022006)Fitness for Duty
Commercial Grade Dedication
Cyber Security
License Renewal
Exemption Request
COVID-19
ML23019A08019 January 2023Notification of Comprehensive Engineering Team Inspection (05000483/2023011) and Request for InformationCommercial Grade Dedication
Probabilistic Risk Assessment
Large early release frequency
Maintenance Rule Program
IR 05000483/202200412 January 2023Integrated Inspection Report 05000483/2022004Ultimate heat sink
Temporary Modification
Functionality Assessment
Operability Determination
Fire Protection Program
GOTHIC
Siren
IR 05000483/202201315 November 2022Design Basis Assurance Inspection (Programs) Inspection Report 05000483/2022013Mission time
Power-Operated Valves
IR 05000483/202200317 October 2022Integrated Inspection Report 05000483/2022003Ultimate heat sink
Stroke time
Internal Flooding
Enforcement Discretion
Temporary Modification
Functionality Assessment
Condition Adverse to Quality
FLEX
Significance Determination Process
Operability Determination
Fire Protection Program
Power change
IR 05000483/202201012 October 2022Biennial Problem Identification and Resolution Inspection Report 05000483-2022010 - DraftSafe Shutdown
Ultimate heat sink
Mission time
Stroke time
Past operability
Probabilistic Risk Assessment
Incorporated by reference
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Maintenance Rule Program
IR 05000483/202240327 September 2022Security Baseline Inspection Report 05000483/2022403
IR 05000483/202200523 August 2022Updated Inspection Plan for Callaway Plant (Report 05000483/2022005)Fitness for Duty
Commercial Grade Dedication
Cyber Security
License Renewal
Exemption Request
Power-Operated Valves
COVID-19
IR 05000483/202240211 August 2022NRC Security Inspection Report 05000483/2022402 (Cover Letter Only)Affidavit
IR 05000483/20220112 August 2022Triennial Fire Protection Inspection Report 05000483 2022011Safe Shutdown
Ultimate heat sink
Hydrostatic
Probabilistic Risk Assessment
Fire impairment
Aging Management
License Renewal
Fire Protection Program
IR 05000483/202200227 July 2022Integrated Inspection Report 05000483/2022002Safe Shutdown
Boric Acid
High Radiation Area
Ultimate heat sink
Offsite Dose Calculation Manual
Internal Flooding
Enforcement Discretion
Nondestructive Examination
Temporary Modification
VT-2
Functionality Assessment
FLEX
Significance Determination Process
Operability Determination
Liquid penetrant
Fire Protection Program
GOTHIC
ML22157A0576 June 2022Notification of NRC Design Bases Assurance Inspection (Programs) (05000483/2022013) and Request for InformationStroke time
Power-Operated Valves
IR 05000483/20220406 May 202295001 Supplemental Inspection Report 05000483/2022040 and Follow-Up Assessment LetterEnforcement Discretion
Significance Determination Process
Power change
Downpower
IR 05000483/20224015 May 2022Cyber Security Inspection Report 05000483/2022401Cyber Security
IR 05000483/202200126 April 2022Integrated Inspection Report 05000483/2022001Shutdown Margin
Ultimate heat sink
Internal Flooding
Enforcement Discretion
Fire impairment
Functionality Assessment
Surveillance Frequency Control Program
Operability Determination
Severe Accident Management Guideline
Maintenance Rule Program
Fire Protection Program
GOTHIC
Integrated Public Alert and Warning System
Siren
IR 05000483/202230112 April 2022NRC Examination Report 05000483/2022301
ML22082A20128 March 2022Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000483/2022011) and Request for InformationSafe Shutdown
Fitness for Duty
Commercial Grade Dedication
Hydrostatic
Probabilistic Risk Assessment
Temporary Modification
Emergency Lighting
Aging Management
Job Performance Measure
Fire Protection Program
IR 05000483/202240424 March 2022Final Security Baseline Inspection Report 05000483/2022404 (Letter)Affidavit
IR 05000483/20210062 March 2022Annual Assessment Letter for Callaway Plant (Report 05000483/2021006)Fitness for Duty
Enforcement Discretion
Cyber Security
Exemption Request
Power-Operated Valves
COVID-19
IR 05000483/20210047 January 2022Integrated Inspection Report - 05000483/2021004High Radiation Area
Hydrostatic
Temporary Modification
Functionality Assessment
Locked High Radiation Area
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
IR 05000483/20210038 November 2021Integrated Inspection Report 05000483/2021003Ultimate heat sink
Cyber Security
Functionality Assessment
FLEX
Significance Determination Process
Operability Determination
Maintenance Rule Program
Coronavirus
COVID-19
Fire Protection Program
Power change
GOTHIC
Siren
IR 05000483/202142029 October 2021NRC Security Baseline Inspection Cover Letter 050004832021420Affidavit
IR 05000483/202140226 October 2021Security Baseline Inspection Report 05000483/2021402Coronavirus
COVID-19
IR 05000483/20210051 September 2021Mid-Cycle Inspection Plan Transmittal Letter for Callaway Plant (Report 05000483/2021005)Cyber Security
Exemption Request
Power-Operated Valves
COVID-19
IR 05000483/20210025 August 2021Integrated Inspection Report 05000483/2021002 and Independent Spent Fuel Storage Installation Report 07201045/2021001Safe Shutdown
Boric Acid
Ultimate heat sink
Tornado Missile
Internal Flooding
Enforcement Discretion
Temporary Modification
Functionality Assessment
Significance Determination Process
Tornado Missile Protection
Surveillance Frequency Control Program
Open Phase Condition
Operability Determination
Tornado Missile Risk Evaluator
Pandemic
Coronavirus
COVID-19
Fire Protection Program
IR 05000483/202140126 May 2021Security Baseline Inspection Report 05000483/2021401Affidavit
IR 05000483/202100111 May 2021Integrated Inspection Report 05000483/2021001High Radiation Area
Ultimate heat sink
Offsite Dose Calculation Manual
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Functionality Assessment
Locked High Radiation Area
FLEX
Significance Determination Process
Process Control Program
Operability Determination
Maintenance Rule Program
Coronavirus
COVID-19
Fire Protection Program
IR 05000483/202140315 April 2021Material Control and Accounting Program Inspection Report 05000483-2021403 (Public)Affidavit
IR 05000483/20200049 February 2021CWY2020004-RP-DSB, Callaway Plant - Integrated Inspection Report and Assessment Follow-Up Letter (05000483/2020004)Boric Acid
Non-Destructive Examination
Past operability
Enforcement Discretion
Probabilistic Risk Assessment
Nondestructive Examination
Temporary Modification
Functionality Assessment
Aging Management
Significance Determination Process
Operability Determination
Maintenance Rule Program
Coronavirus
COVID-19
Fire Protection Program
IR 05000483/20200032 November 2020Integrated Inspection Report 05000483/2020003Shutdown Margin
Ultimate heat sink
Enforcement Discretion
Probabilistic Risk Assessment
Functionality Assessment
Significance Determination Process
Operability Determination
Maintenance Rule Program
Coronavirus
COVID-19
Fire Protection Program
Power change
Siren
IR 05000483/202041127 October 2020Security Baseline Inspection Report 05000483/2020411Affidavit
IR 05000483/202030113 October 2020NRC Examination Report 05000483/2020301Job Performance Measure
IR 05000483/20200051 September 2020Updated Inspection Plan for Callaway Plant (Report 05000483/2020005)Cyber Security
Exemption Request
Coronavirus
IR 05000483/202000229 July 2020Integrated Inspection Report 05000483/2020002High Radiation Area
Ultimate heat sink
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
Scaffolding
Operability Assessment
IR 05000483/202001012 June 2020Biennial Problem Identification and Resolution Inspection Report 05000483/2020010Boric Acid
Ultimate heat sink
Condition Adverse to Quality
Operability Determination
Pandemic
Coronavirus
COVID-19
Fire Protection Program
IR 05000483/202041024 April 2020NRC Security Inspection Report 05000483/2020410Affidavit
IR 05000483/202000120 April 2020Integrated Inspection Report 05000483/2020001Internal Flooding
Enforcement Discretion
Functionality Assessment
Operability Determination
Maintenance Rule Program
Coronavirus
COVID-19
Fire Protection Program
IR 05000483/202001115 April 2020Design Basis Assurance Inspection (Teams) Inspection Report 05000483/2020011Commercial Grade Dedication
Internal Flooding
Finite Element Analysis
Significance Determination Process
Large early release frequency
Operability Determination
Maintenance Rule Program
Coronavirus
COVID-19