IR 05000483/2023004 | 19 January 2024 | Integrated Inspection Report 05000483/2023004 | Boric Acid High Radiation Area Ultimate heat sink Non-Destructive Examination Weld Overlay Enforcement Discretion Probabilistic Risk Assessment Nondestructive Examination VT-2 Functionality Assessment Condition Adverse to Quality Significance Determination Process Operability Determination Liquid penetrant Fire Protection Program Substantial potential for overexposure Power change Overexposure |
IR 05000483/2023010 | 15 November 2023 | NRC License Renewal Phase 1 Inspection Report 05000483 2023010 | License Renewal |
IR 05000483/2023301 | 9 November 2023 | NRC Examination Report 05000483-2023301 | Temporary Modification |
ML23293A265 | 24 October 2023 | 3rd Quarter 2023 Integrated Inspection Report | Fitness for Duty Ultimate heat sink Stroke time Internal Flooding Past operability Temporary Modification Functionality Assessment Process Control Program Operability Determination License Renewal Fire Protection Program |
IR 05000483/2024012 | 24 October 2023 | Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000483/2024012) | Cyber Security |
IR 05000483/2023401 | 13 September 2023 | NRC Security Baseline Inspection Report 05000483/2023401 | Fitness for Duty Significance Determination Process |
IR 05000483/2023005 | 23 August 2023 | Updated Inspection Plan for Callaway Nuclear Power Plant, Unit 1 (Report 05000483/2023005) - Mid Cycle Letter 2023 | Fitness for Duty Commercial Grade Dedication Cyber Security License Renewal |
IR 05000483/2023002 | 10 July 2023 | Integrated Inspection Report 05000483/2023002 | Safe Shutdown High winds Ultimate heat sink Fire Barrier Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment FLEX Significance Determination Process Operability Determination Maintenance Rule Program Through-Wall Leak Through Wall Leak Fire Protection Program Hourly Fire Watch |
IR 05000483/2023011 | 15 June 2023 | Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000483/2023011 | Ultimate heat sink GOTHIC |
ML23122A317 | 8 May 2023 | Review of the Spring 2022 Steam Generator Tube Inservice Inspections | |
IR 05000483/2023001 | 12 April 2023 | Integrated Inspection Report 05000483/2023001 | Boric Acid Ultimate heat sink Enforcement Discretion Functionality Assessment Significance Determination Process Surveillance Frequency Control Program Operability Determination Fire Protection Program |
IR 05000483/2023402 | 29 March 2023 | NRC Security Baseline Inspection Report 05000483/2023402 | Fitness for Duty Contraband |
IR 05000483/2022006 | 1 March 2023 | Annual Assessment Letter for Callaway Plant (Report 05000483/2022006) | Fitness for Duty Commercial Grade Dedication Cyber Security License Renewal Exemption Request COVID-19 |
ML23019A080 | 19 January 2023 | Notification of Comprehensive Engineering Team Inspection (05000483/2023011) and Request for Information | Commercial Grade Dedication Probabilistic Risk Assessment Large early release frequency Maintenance Rule Program |
IR 05000483/2022004 | 12 January 2023 | Integrated Inspection Report 05000483/2022004 | Ultimate heat sink Temporary Modification Functionality Assessment Operability Determination Fire Protection Program GOTHIC Siren |
IR 05000483/2022013 | 15 November 2022 | Design Basis Assurance Inspection (Programs) Inspection Report 05000483/2022013 | Mission time Power-Operated Valves |
IR 05000483/2022003 | 17 October 2022 | Integrated Inspection Report 05000483/2022003 | Ultimate heat sink Stroke time Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment Condition Adverse to Quality FLEX Significance Determination Process Operability Determination Fire Protection Program Power change |
IR 05000483/2022010 | 12 October 2022 | Biennial Problem Identification and Resolution Inspection Report 05000483-2022010 - Draft | Safe Shutdown Ultimate heat sink Mission time Stroke time Past operability Probabilistic Risk Assessment Incorporated by reference Condition Adverse to Quality Significance Determination Process Operability Determination Maintenance Rule Program |
IR 05000483/2022403 | 27 September 2022 | Security Baseline Inspection Report 05000483/2022403 | |
IR 05000483/2022005 | 23 August 2022 | Updated Inspection Plan for Callaway Plant (Report 05000483/2022005) | Fitness for Duty Commercial Grade Dedication Cyber Security License Renewal Exemption Request Power-Operated Valves COVID-19 |
IR 05000483/2022402 | 11 August 2022 | NRC Security Inspection Report 05000483/2022402 (Cover Letter Only) | Affidavit |
IR 05000483/2022011 | 2 August 2022 | Triennial Fire Protection Inspection Report 05000483 2022011 | Safe Shutdown Ultimate heat sink Hydrostatic Probabilistic Risk Assessment Fire impairment Aging Management License Renewal Fire Protection Program |
IR 05000483/2022002 | 27 July 2022 | Integrated Inspection Report 05000483/2022002 | Safe Shutdown Boric Acid High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Internal Flooding Enforcement Discretion Nondestructive Examination Temporary Modification VT-2 Functionality Assessment FLEX Significance Determination Process Operability Determination Liquid penetrant Fire Protection Program GOTHIC |
ML22157A057 | 6 June 2022 | Notification of NRC Design Bases Assurance Inspection (Programs) (05000483/2022013) and Request for Information | Stroke time Power-Operated Valves |
IR 05000483/2022040 | 6 May 2022 | 95001 Supplemental Inspection Report 05000483/2022040 and Follow-Up Assessment Letter | Enforcement Discretion Significance Determination Process Power change Downpower |
IR 05000483/2022401 | 5 May 2022 | Cyber Security Inspection Report 05000483/2022401 | Cyber Security |
IR 05000483/2022001 | 26 April 2022 | Integrated Inspection Report 05000483/2022001 | Shutdown Margin Ultimate heat sink Internal Flooding Enforcement Discretion Fire impairment Functionality Assessment Surveillance Frequency Control Program Operability Determination Severe Accident Management Guideline Maintenance Rule Program Fire Protection Program GOTHIC Integrated Public Alert and Warning System Siren |
IR 05000483/2022301 | 12 April 2022 | NRC Examination Report 05000483/2022301 | |
ML22082A201 | 28 March 2022 | Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000483/2022011) and Request for Information | Safe Shutdown Fitness for Duty Commercial Grade Dedication Hydrostatic Probabilistic Risk Assessment Temporary Modification Emergency Lighting Aging Management Job Performance Measure Fire Protection Program |
IR 05000483/2022404 | 24 March 2022 | Final Security Baseline Inspection Report 05000483/2022404 (Letter) | Affidavit |
IR 05000483/2021006 | 2 March 2022 | Annual Assessment Letter for Callaway Plant (Report 05000483/2021006) | Fitness for Duty Enforcement Discretion Cyber Security Exemption Request Power-Operated Valves COVID-19 |
IR 05000483/2021004 | 7 January 2022 | Integrated Inspection Report - 05000483/2021004 | High Radiation Area Hydrostatic Temporary Modification Functionality Assessment Locked High Radiation Area Operability Determination Coronavirus COVID-19 Fire Protection Program |
IR 05000483/2021003 | 8 November 2021 | Integrated Inspection Report 05000483/2021003 | Ultimate heat sink Cyber Security Functionality Assessment FLEX Significance Determination Process Operability Determination Maintenance Rule Program Coronavirus COVID-19 Fire Protection Program Power change GOTHIC Siren |
IR 05000483/2021420 | 29 October 2021 | NRC Security Baseline Inspection Cover Letter 050004832021420 | Affidavit |
IR 05000483/2021402 | 26 October 2021 | Security Baseline Inspection Report 05000483/2021402 | Coronavirus COVID-19 |
IR 05000483/2021005 | 1 September 2021 | Mid-Cycle Inspection Plan Transmittal Letter for Callaway Plant (Report 05000483/2021005) | Cyber Security Exemption Request Power-Operated Valves COVID-19 |
IR 05000483/2021002 | 5 August 2021 | Integrated Inspection Report 05000483/2021002 and Independent Spent Fuel Storage Installation Report 07201045/2021001 | Safe Shutdown Boric Acid Ultimate heat sink Tornado Missile Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment Significance Determination Process Tornado Missile Protection Surveillance Frequency Control Program Open Phase Condition Operability Determination Tornado Missile Risk Evaluator Pandemic Coronavirus COVID-19 Fire Protection Program |
IR 05000483/2021401 | 26 May 2021 | Security Baseline Inspection Report 05000483/2021401 | Affidavit |
IR 05000483/2021001 | 11 May 2021 | Integrated Inspection Report 05000483/2021001 | High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Functionality Assessment Locked High Radiation Area FLEX Significance Determination Process Process Control Program Operability Determination Maintenance Rule Program Coronavirus COVID-19 Fire Protection Program |
IR 05000483/2021403 | 15 April 2021 | Material Control and Accounting Program Inspection Report 05000483-2021403 (Public) | Affidavit |
IR 05000483/2020004 | 9 February 2021 | CWY2020004-RP-DSB, Callaway Plant - Integrated Inspection Report and Assessment Follow-Up Letter (05000483/2020004) | Boric Acid Non-Destructive Examination Past operability Enforcement Discretion Probabilistic Risk Assessment Nondestructive Examination Temporary Modification Functionality Assessment Aging Management Significance Determination Process Operability Determination Maintenance Rule Program Coronavirus COVID-19 Fire Protection Program |
IR 05000483/2020003 | 2 November 2020 | Integrated Inspection Report 05000483/2020003 | Shutdown Margin Ultimate heat sink Enforcement Discretion Probabilistic Risk Assessment Functionality Assessment Significance Determination Process Operability Determination Maintenance Rule Program Coronavirus COVID-19 Fire Protection Program Power change Siren |
IR 05000483/2020411 | 27 October 2020 | Security Baseline Inspection Report 05000483/2020411 | Affidavit |
IR 05000483/2020301 | 13 October 2020 | NRC Examination Report 05000483/2020301 | Job Performance Measure |
IR 05000483/2020005 | 1 September 2020 | Updated Inspection Plan for Callaway Plant (Report 05000483/2020005) | Cyber Security Exemption Request Coronavirus |
IR 05000483/2020002 | 29 July 2020 | Integrated Inspection Report 05000483/2020002 | High Radiation Area Ultimate heat sink Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment Operability Determination Coronavirus COVID-19 Fire Protection Program Scaffolding Operability Assessment |
IR 05000483/2020010 | 12 June 2020 | Biennial Problem Identification and Resolution Inspection Report 05000483/2020010 | Boric Acid Ultimate heat sink Condition Adverse to Quality Operability Determination Pandemic Coronavirus COVID-19 Fire Protection Program |
IR 05000483/2020410 | 24 April 2020 | NRC Security Inspection Report 05000483/2020410 | Affidavit |
IR 05000483/2020001 | 20 April 2020 | Integrated Inspection Report 05000483/2020001 | Internal Flooding Enforcement Discretion Functionality Assessment Operability Determination Maintenance Rule Program Coronavirus COVID-19 Fire Protection Program |
IR 05000483/2020011 | 15 April 2020 | Design Basis Assurance Inspection (Teams) Inspection Report 05000483/2020011 | Commercial Grade Dedication Internal Flooding Finite Element Analysis Significance Determination Process Large early release frequency Operability Determination Maintenance Rule Program Coronavirus COVID-19 |