Withdraws 990121 Request for License Change Re Emergency Core Cooling Sys Net Positive Suction Head,Due to Incorrect Datum Preparation
ML20212H144
Person / Time
Site: Pilgrim
Issue date: 09/23/1999
From: Alexander J
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ENGC-2.99.100, NUDOCS 9909300222
Download: ML20212H144 (2)


Text

f

  • ~

( )

k.d v

Entergy Nuclear Genersi'on Company Pilgnm Nuclear Power Station j 600 Rocky Hdi Road

.>lymouth, MA 02360 September 23,1999 ENGC Ltr. 2.99.100 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Docket No. 50-293 License No. DPR-35 REQUEST TO WITHDRAW LICENSE CHANGE CONCERNING ECCS NPSH Purpose This letter withdraws Pilgrim Nuclear Power Station's January 21,1999, request for a license change conceming emergency core cooling system net positive suction head.

Backaround By letter dated January 21,1999, Boston Edison Company (Pilgrim Nuclear Power Station) requested NRC review and approval for the use of new values for post-accident containment pressure in Pilgrim's net positive suction head (NPSH) analyses performed for the emergency core cooling system (ECCS) pumps. The new values accommodate the postulated pump suction strainer head loss due to loss-of-coolant accident (LOCA) generated debris.

Reason for Withdrawal This letter withdraws the January 21,1999, request because Pilgrim subsequently discovered that a datum used in its preparation was incorrect.  !

)

Pilgrim is currently preparing a revised request reflecting the correct datum, which will be submitted for NRC review and approval. Pilgrim will operate under the aegis of Amendment 173 until receipt of the revised request's NRC approval. The NRC issued License Amendment ,

173 and its associated Safety Evaluation Report (SER) on July 3,1997. i Please contact P.M. Kahler at (508) 830-7939 if you should require further information on this  ;

~

issue.

{O exand r, Director PMK/ 3 () N g 3f Nuclear Assessment O\

9909300222 990923 PDR ADOCK 05000293 p PDR J

r: , ,

ENGC Ltr. 2.99.100 Vegs 2 cc: Mr. Alan B. Wang, Project Manager Mr. Robert Hallisey, l Project Directorate 1-3 Radiation Control Piogram Office of Nuclear Reactor Regulation Center for Communicable Diseases Mail Stop: OWFN 14B20 Mass. Dept. of Public Health

1 White Flint North 174 Portland Street l 11555 Rockville Pike Boston, MA 02114 Rockville, MD 20852 U.S. Nuclear 6:egulatory Commission Mr. Steve McGrail, Director Region l Mass. Energy Management Agency )

475 Allendale Road 400 Worcester Road l King of Prussia, PA 19406 P.O. Box 1496

{

Framingham, MA 01701-0313 1

, Senior Resident inspector Pilgrim Nuclear Power Station j i

s l

. l l

1 299100 i

l