ML20141B955

From kanterella
Jump to navigation Jump to search
Forwards Operational Status Summary for Plant & Second Series of Repts on Progress of Establishing Replacement Location for South Weymouth Naval Air Station Reception Center
ML20141B955
Person / Time
Site: Pilgrim
Issue date: 05/14/1997
From: Desmond N
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20141B960 List:
References
BECO-2.97.051, NUDOCS 9705160080
Download: ML20141B955 (1)


Text

. - -

, Tech. Spic. 6.9.A.2

(]

. 'SA Boeton Edieon Pilgrim Nuclear Power Station Rocky Hill Road Plymouth, Massachusetts 02360-5599 May 14,1997 BECo Ltr. 2.97.051 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Docket No. 50.293 License No. DPR-35 April 1997 Monthly Report in accordance with Pilgrim Nuclear Power Station Technical Specification 6.9.A.2, a copy of the

! Operational Status Summary for Pilgrim Nuclear Power Station is provided in Attachment #1 for your information and planning. Should you have any questions conceming this report, please contact me directly.

In addition, Attachment #2 is the second in a series of reports on the progress of establishing a replacement location for the South Weymouth Naval Air Station (SWNAS) Reception Center. These reports will be . submitted on a monthly basis until the new reception center is functional.

I N. L. Desmond Regulatory Relations Group Manager RLC/dmc/radmisc/297-mrpt Attachments: #1 April 1997 Monthly Report

  1. 2 Progress report on the South Weymouth Naval Air Station Reception Center.

cc: Mr. Hubert Miller l Regional Administrator, Region I f 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 gh d Mr. John Lusher U.S. Nuclear Regulatory Commission 475 Allendale Road

King of Prussia, PA 19406 Senior Resident inspector 1

'' ll llllllll ll!ll i . _ mn 11 il 9705160080 970514 PDR ADOCK 05000293 R PDR