ML20136J005

From kanterella
Jump to navigation Jump to search
Industrial Pretreatment Quarterly Self-Monitoring Results
ML20136J005
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 01/14/1997
From:
CENTERIOR ENERGY
To:
Shared Package
ML20136H988 List:
References
NUDOCS 9703190393
Download: ML20136J005 (1)


Text

..

INDUSTRIAL PRETREATMENT QUARTERLY SELF-MONITORING RESULTS Perry Nuclear Power Plant Permit No.: 1004911 10 Center Rd. Report Date:1/14/97 Perry, Ohio 44081 Laboratory: Electro Analytical Date of Sample: 1/2 to 1/3/97 Time of sample: 08:45 Sample Location: Sewage Pump Station Name of Sampler:Beckler l

Laboratory Address: 7118 Industrial Park Blvd.

Mentor, OH 44060 Date of Analysis 1/3 to 1/10/97 Flows 33,000 gpd PARAMETER SAMPLE EPA ANALYSIS ANALYSIS {

TYPE METHOD DATE RESULT COD Composite 410.4 1/7/97 240 mg/L BOD Composite 405.1 1/8/97 120 mg/L TSS Composite 160.2 1/6/97 940 mg/L Silver Composite 272.1 1/10/97 c.05 mg/L Mercury Composite 245.1 1/10/97 <1.0 ug/L pH Grab 150.1 1/3/97 8.1 s.u.

Oil / Grease Grab 413.1 1/6/97 46 mg/L Gravimetric I certify under penalty of law that I have personally examined and I am familiar with the information in this report and that, based on my inquiry of those persons immediately responsible for obtaining the information ,

contained in this report, I believe that the information is true, accurate, I and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and l imprisonment.

~

Sr. Vice President - Nuclear Signat % ' [ Date Title 9703190393 970313 PDR ADOCK 05000440 R PDR