Forwards Semiannual fitness-for-duty (FFD) Rept for Period of Jul-Dec 1996 for Unit 1
ML20134J353
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/04/1997
From: Jeffery Wood
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
2437, NUDOCS 9702120094
Download: ML20134J353 (4)


Text

- -. - .. . _ . . , . .-

1-Mgg-

.f ss a s w . nouie 2: 4i>24>23m .w.i x.w e

' oak Hartrar OH 43449 FAX: di9-3218337 Vce Presdort -Nuclear i Davis Besse Docket Number 50-346 '

j\

License Number NPF-3 .i Serial Number 2437 1

February 4,_1997 i Y

LUnited States Nuclear Regulatory Commission ]i Document Control Desk Washington, D.C. 20555-0001

Subject:

Semiannual Fitness-For-Duty Report July - December,1996 f i

Ladies and Gentlemen: l i

Pursuant to 10 CFR 26.71(d)" Record Keeping Requirements", Toledo Edison submits its semiannual Fitness-For-Duty (FFD) report for the period of July - December 1996 for the Davis- ,

e Besse Nuclear Power Station, Unit 1. l l

. I E Attachment I provides Toledo Edison's FFD Program Performance Data. Attachment 2 l provides a summary of management actions taken by Toledo Edison based on positve FFD j testing results, presumptive positives, and a list of FFD event reports submitted by Toledo {

' Edison, i

?-

Should you have any questions or require additional information, please contact ,

Mr. James L. Freels, Manager - Regulatory Affairs, at (419) 321-8466. j d i Sincerely, i

ASC Attachments 1100M l cc: A. G. llansen, NRC Project Manager l A. B. Beach, Regional Administrator, NRC Region Ill l  !

. S. Stasek, DB-1 Senior Resident Inspector I l Utility Radiological Safety Board l

9702120094 970204 F i

.PDR -ADOCK 05000340 R PDRj .

l i

N Docket umber 50-346 License Number NPF-3 Serial Number 2437 r

s Toledo Edison Fitness-For-Duty Report July - December 1996 l

i l

l

Docket Number 50-346

- Ocense Number NPF - 3

. Serial Number 2437 Fitness fsr Duty Program 1 Attachment 1 Performance Dats

. Personnel Subject to 10CFR 26 Toledo Edison December 31.1996 Company 6 Months Ending Davis-Besse (419) 321-8466 l Location Phone J. L Freets. Manager - Regulatory Affairs Contact Name Cutoffs: Screen / Confirmation (na/ml) Anoendix A to 10CFR 26 Marijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Opiates 300/300 Alcohol (%BAC) 0.04 Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with Unescorted Access 805 0 88 Categories Tested Positive Tested Positive Tested Positive Pre-Access 15 0 12 0 Post Accident 0 0 0 0 Observed Behavior 0 0 0 0 Random 254 0 6 0 Follow-up 7 0 0 0 Other 90 0 0 0 Total 366 0 18 0/0 Breakdown of Confirmed Positive Tests for Specific Substances Marijuana Cocaine Opiates Amphe- Phency- Alcohol Refusal tamines clidine to test Licensee Employ >es 0 0 0 0 0 0 0 Long-Term Cor<ractors 0 0 0 0 0 0 0 Short-Term Contractors 0 0 0 0 0 0 1 Total 0 0 0 0 0 0 1 1

l Docket Number 50-346

. License Number NPF-3 .

SerialNumber 2437 l Attachment 2 l

.[

TOLEDO EDISON MANAGEMENT ACTIONS {

RELATING TO FITNESS-FOR-DUTY j i

i Toledo Edison Contractor _

Personnel Personnel j Referred to EAP 0 NA Management Sanctions 0 1 Toledo Edison does not perform onsite initial drug screening tests; therefore there are no unconfirmed positive results on which to base management actions.

TOLEDO EDISON i e

FITNESS-FOR-DUTY

, i' REPORTS  ;

I l There were no Fitness-For-Duty reports submitted during this reporting period (July - December 1996).