Revised Monthly Operating Rept for Jan 1996 for Millstone Power Station,Unit 1
ML20132D721
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/31/1996
From: Newburgh G
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20132D663 List:
References
NUDOCS 9612200083
Download: ML20132D721 (2)


Text

.,,

OPERATING DATA REPORT UNIT NAME Mittstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newburgh _

TELEPHONE (860) 444-5730 OPERATING STATUS

1. Docket Number 50-245
2. Reporting Period January 1996 Notes:
3. Utility Contact G. Newburgh
  • Corrected on 12/12/96 to ,
4. LicensedThermalPower(MWt): 2011- reflect Forced Outage I
5. Nameplate Rating (Gross MWe): 662 beginning 12/13/95 @ 0000
6. Design Electrical Rating (Net MWe): 660 due to 10CFR50.54(f) Letter l
7. Maximum Dependable Capacity (Gross MWe): 670 l
8. Maximum Dependable Capacity (Net MWe): 641
9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons: I N/A i 107 Power Level To Which Restricted, if any (Net MWe): 0
11. Reasons For Restrictions,If Any: NRC Category 11 Facility; design basis verification response pursuant to 10CFR50.54(f).

This Month Yr.-To-Date Cumulative

12. Hours in Reporting Period 744.0 744.0 220680.0
13. Number Of Hours Reactor Was Critical 0.0 0.0 170529.9
14. Reactor Reserve Shutdown Hours 0.0 0.0 3283.3 l
15. Hours Generator On-Line 0.0 0.0 166560.7
16. Unit Reserve Shutdown Hours 0.0 93.7 0.0_
17. Gross Thermal Energy Generated (MWH) 0.0 0.0 3_14372827.0
18. Gross Electrical Energy Generated (MWH) 0.0 0.0 105938737.0
19. Net Electrical Energy Generated (MWH) -268570~ -2682.0 101067269.0
20. Unit Service Factor 0.0 0.0 75.5
21. Unit Availability Factor 65 0.0 75.5
22. Unit Capacity Factor (Using MDC Net) -0.6 -0.6 70.2
23. Unit Capacity Factor (Using DER Net) -0.5 -0.5 69.4
24. Unit Forced Outage Rate *100.0 *100.0 *12.2 l 25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
26. If Unit Shutdown At End Of Report Period. Estimated Date of Startup: *To be determined
27. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY N/A N/A t

INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A i

l 9612200083 961216 l PDR ADOCK 05000245 R PDR

UNIT SHUTDOWNS AND POWER REDUCTIONS ,-

! DOCKET NO. 50-245 ,---

UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newburoh TELEPHONE (860)-444-5730 -

REPORT MONTH: January 1996 2

No. Date Type' Duration Reason Method of License System Comp,onent Cause & Corrective I. (Hours) Shutting Event Code' Code Action to 3

j Down Reactor Report # Prevent Recurrence 95-10A 951213 F 744 D 4 N/A N/A N/A NRC Category 11 facility:

design basis verification for l response to NRC pursr.rit i

to 10CFR50.54(f).

RFO activities continua.

l i

  • F: Forced 2

Reason 3

Method ' IEEE Standard 805-1984, j S: Scheduled A - Equipment Failure (Explain) 1 - Manual " Recommended Practices B - Mainteneance or Test 2 - Manual Scram for System identification in C - Refueling 3 - Automatic Scram Nuclear Power Plants and D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0) 5 F - Administrative 6 - Other (Explain) IEEE Standard 803A-1983, G - Operational Error (Explain) " Recommended Practices H - Other (Explain) for Unique identification in Power Plants and Related i

Facilities - Component Function idenMers"

_ - . _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ .- - - _ _ _ , .._.. - - - - . - . - . - -.