Monthly Operating Rept for Oct 1998 for Mnps,Unit 2
ML20195E187
Person / Time
Site: Millstone 
Issue date: 10/31/1998
From: Stark S
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20195D049 List:
References
NUDOCS 9811180264
Download: ML20195E187 (3)


Text

..

t.

I l

Docket No. 50-336 l

B17535 f

P l

i Millstone Nuclear Power Station, Unit No. 2 L

Facility Operating License No. DPR-65 s

Monthly Operating Report t

l l

'I l.

9811190264 981106 ff PDR ADOCK 05000336,-

November 1998 PDR l

R l

l' l

~

U.S. Nudear Regulatory Commasion B17535%ttachment 1Page i AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:

50-336 UNIT:

Millstone Unit 2 DATE:

11/02/98 -

COMPLETED BY:

S. Stark TELEPHONE:

(860) 447-1791 EXT:

4419 MONTH: October 1998 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 0

2 0

18 0

3 0

19 0

.4 0

20 0

5 0

21 0

6-0 22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 -

0 26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 0

16 0

)

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each

' day in the reporting month. Compute to the nearest whole megawatt.

L I

l

U.S. Nuclear Regulatory Commission B17535%ttachment 1Page 2 e-

~

OPERATING DATA REPORT UNIT NAME: Millstone Unit 2 DATE: 11/02/98 COMPLETED BY:

S. Stark TELEPHONE: (860)447-1791 EXT: 4419 OPERATING STATUS

1. Docket Number 50-336
2. Reporting Period October 1998 Notes: ltems 22 and 23
3. Utility Contact S. Stark cumulative are weighted 4 Licensed Thermal Power (MWt):

2700 averages. Unit operated at

5. Nameplate Rating (Gross MWe):

909 2560 MWrH prior to its

6. Design Electrical Rating (Net MWe):

870 uprating to its current 7.

Maximum Dependable Capacity (Gross MWe):

901.63 2700 MWTH power level.

8.

Maximum Dependable Capacity (Net MWe):

870.63

9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:

N/A

10. Power Level To Which Restricted, if any (Net MWe):

0

11. Reasons For Restrictions,if Any:

NRC Category lli Facility; NRC Confirmatory Order requiring implementation of an independent corrective action verification program; NRC order requiring a third-party review of the employee concerns program at Millstone 2; design basis verification response pursuant to 10CFR50.54(fl.

This Month Yr.-To-Date Cumulative

12. Hours in Reporting Period 745.0 7296.0 200304.0
13. Number Of Hours Reactor Was Critical 0.0 0.0 121911.7
14. Reactor Reserve Shutdown Hours 0.0 0.0 2205.5
15. Hours Generator On-Line 0.0 0.0 116611.9
16. Unit Reserve Shutdown Hours 0.0 0.0 468.2
17. Gross Thermal Energy Generated (MWH) 0.0 0.0 300862506.4
18. Gross Electrical Energy Generated (MWH) 0.0 0.0 98709460.0
19. Net Electrical Energy Generated (MWH)

-2199.0

-17682.9 94601407.3

20. Unit Service Factor 0.0 0.0 58.2
21. Unit Availability Factor 0.0 0.0 58.5
22. Unit Capacity Factor (Using MDC Net) 0.0 0.0 55.1
23. Unit Capacity Factor (Using DER Net) 0.0 0.0 54.4
24. Unit Forced Outage Rate 100.0 100.0 27.4 I
25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Shutdown at the time of this report

26. If Unit Shutdown At End Of Report Period, Estimated Date of Startup:

To be determined

27. Units in Test Status (Prior to Commercial Opertion):

Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A