ML20195E187
| ML20195E187 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 10/31/1998 |
| From: | Stark S NORTHEAST NUCLEAR ENERGY CO. |
| To: | |
| Shared Package | |
| ML20195D049 | List: |
| References | |
| NUDOCS 9811180264 | |
| Download: ML20195E187 (3) | |
Text
..
t.
I l
Docket No. 50-336 l
B17535 f
P l
i Millstone Nuclear Power Station, Unit No. 2 L
Facility Operating License No. DPR-65 s
Monthly Operating Report t
l l
'I l.
9811190264 981106 ff PDR ADOCK 05000336,-
November 1998 PDR l
R l
l' l
~
U.S. Nudear Regulatory Commasion B17535%ttachment 1Page i AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:
50-336 UNIT:
Millstone Unit 2 DATE:
11/02/98 -
COMPLETED BY:
S. Stark TELEPHONE:
(860) 447-1791 EXT:
4419 MONTH: October 1998 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
.4 0
20 0
5 0
21 0
6-0 22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 -
0 26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
)
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each
' day in the reporting month. Compute to the nearest whole megawatt.
L I
l
U.S. Nuclear Regulatory Commission B17535%ttachment 1Page 2 e-
~
OPERATING DATA REPORT UNIT NAME: Millstone Unit 2 DATE: 11/02/98 COMPLETED BY:
S. Stark TELEPHONE: (860)447-1791 EXT: 4419 OPERATING STATUS
- 1. Docket Number 50-336
- 2. Reporting Period October 1998 Notes: ltems 22 and 23
- 3. Utility Contact S. Stark cumulative are weighted 4 Licensed Thermal Power (MWt):
2700 averages. Unit operated at
- 5. Nameplate Rating (Gross MWe):
909 2560 MWrH prior to its
- 6. Design Electrical Rating (Net MWe):
870 uprating to its current 7.
Maximum Dependable Capacity (Gross MWe):
901.63 2700 MWTH power level.
8.
Maximum Dependable Capacity (Net MWe):
870.63
- 9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:
N/A
- 10. Power Level To Which Restricted, if any (Net MWe):
0
- 11. Reasons For Restrictions,if Any:
NRC Category lli Facility; NRC Confirmatory Order requiring implementation of an independent corrective action verification program; NRC order requiring a third-party review of the employee concerns program at Millstone 2; design basis verification response pursuant to 10CFR50.54(fl.
This Month Yr.-To-Date Cumulative
- 12. Hours in Reporting Period 745.0 7296.0 200304.0
- 13. Number Of Hours Reactor Was Critical 0.0 0.0 121911.7
- 14. Reactor Reserve Shutdown Hours 0.0 0.0 2205.5
- 15. Hours Generator On-Line 0.0 0.0 116611.9
- 16. Unit Reserve Shutdown Hours 0.0 0.0 468.2
- 17. Gross Thermal Energy Generated (MWH) 0.0 0.0 300862506.4
- 18. Gross Electrical Energy Generated (MWH) 0.0 0.0 98709460.0
- 19. Net Electrical Energy Generated (MWH)
-2199.0
-17682.9 94601407.3
- 20. Unit Service Factor 0.0 0.0 58.2
- 21. Unit Availability Factor 0.0 0.0 58.5
- 22. Unit Capacity Factor (Using MDC Net) 0.0 0.0 55.1
- 23. Unit Capacity Factor (Using DER Net) 0.0 0.0 54.4
- 24. Unit Forced Outage Rate 100.0 100.0 27.4 I
- 25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Shutdown at the time of this report
- 26. If Unit Shutdown At End Of Report Period, Estimated Date of Startup:
To be determined
- 27. Units in Test Status (Prior to Commercial Opertion):
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A