OPERATING DATA REPORT UNIT NAME M_illstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newburgh TELEPHONE (860) 444 5730 OPERATING STATUS
- 1. Docket Number 50-245
- 2. Reporting Period August 1955 INotes:
- 3. Utility Contact G. Newburgh
- Corrected on 12/12/96 to
- 4. Licensed Thermal Power (MWt):
2011.
reflect Forced Outage
- 5. Nameplate Rating (Gross MWe):
662 beginning 12/13/95 @ 0000
- 6. Design Electrical Rating (Net MWe):
660_
due to 10CFR50.54(f) letter
- 7. Maximum Dependable Capacity (Gross MWe):
670
- 8. Maximum Dependable Capacity (Net MWe):
641
- 9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:
N/A
- 10. Power Level To Which Restricted, if any (Net MWe):
0
~
- 11. Reasons For Restrictions, if Any:
NRC Category lli Facility; NRC Confirmatory Order requiring implementation of an independent corrective action verification program; design basis verification response pursuant to 10CFR50.54(f).
This Month Yr.-To-Date Cumulative
- 12. Hours in Reporting Period 744.0 5855.0 225071.0
- 13. Number Of Hours Reactor Was Critical 0.0 0.0_
170529.9
- 14. Reactor Reserve Shutdown Hours 0.0 0.0 3283.3
- 15. Hours Generator On-Line 0.0 0.0 166560.7
- 16. Unit Reserve Shutdown Hours 0.0 0.0 93.7 i
- 17. Gross Thermal Energy Generated (MWH) 0.0 0.0 314372827.0
- 18. Gross Electrical Energy Generated (MWH)
_0.0 0.0 105938737.0
- 19. Net Electrical Energy Generated (MWH)
-2233.0
-18049.0 101036086.0
- 20. Unit Service Factor 0.0 0.0 74.0
- 21. Unit Availability Factor 0_.0, 0.0_
74.0
- 22. Unit Capacity Factor (Using MDC Net)
-0.5
-0.5 68.6
- 23. Unit Capacity Factor (Using DER Net)
-0.5_
-0.5 68.0
- 24. Unit Forced Outage Rate
- 100.0
- 100.0
- 14.5
- 25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
' Shutdown for 10CFR50.54F at time of this report
- 26. If Unit Shutdown At End Of Report Period, Estimated Date of Startup:
To be determined
- 27. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l
l 9612200111 961216 PDR ADOCK 05000245 R
pop
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-245 UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newburah TELEPHONE (8601-444-5730 REPORT MONTH: Auaust 1996 2
No.
Date Type' Duration Reason Method of License System Comp *onent Cause & Corrective (Hours)
Shutting Event Code' Code Action to Down Reactor' Report #
Prevent Recurrence 95-10H 951213 F
744 D
4 N/A N/A N/A NRC Category I'l facility; NRC Confirmatory Order requiring independent corrective action verification; design basis verification for response to NRC pursuant to 10CFR50.54(f).
RFO activities continue.
Reason Method
' F: Forced 2
3 S: Scheduled A - Equipment Failure (Explain) 1 - Manual
- Recommended Practices B - Mainteneance or Test 2 - Manual Scram for System identification in C - Refueling 3 - Automatic Scram Nuclear Power Plants and D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0)
F-Administrative 6 - Other (Explain)
' IEEE Standard 803A-1983 G - Operational Error (Explain)
" Recommended Practices H - Other (Explain) for Unique identification in Power Plants and Related Facilities - Component Function Identifiers"
-