Revised Monthly Operating Rept for Aug 1996 for Millstone Power Station,Unit 1
ML20132D777
Person / Time
Site: Millstone 
Issue date: 08/31/1996
From: Newburgh G
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20132D663 List:
References
NUDOCS 9612200111
Download: ML20132D777 (2)


Text

.

OPERATING DATA REPORT UNIT NAME M_illstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newburgh TELEPHONE (860) 444 5730 OPERATING STATUS

1. Docket Number 50-245
2. Reporting Period August 1955 INotes:
3. Utility Contact G. Newburgh
  • Corrected on 12/12/96 to
4. Licensed Thermal Power (MWt):

2011.

reflect Forced Outage

5. Nameplate Rating (Gross MWe):

662 beginning 12/13/95 @ 0000

6. Design Electrical Rating (Net MWe):

660_

due to 10CFR50.54(f) letter

7. Maximum Dependable Capacity (Gross MWe):

670

8. Maximum Dependable Capacity (Net MWe):

641

9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:

N/A

10. Power Level To Which Restricted, if any (Net MWe):

0

~

11. Reasons For Restrictions, if Any:

NRC Category lli Facility; NRC Confirmatory Order requiring implementation of an independent corrective action verification program; design basis verification response pursuant to 10CFR50.54(f).

This Month Yr.-To-Date Cumulative

12. Hours in Reporting Period 744.0 5855.0 225071.0
13. Number Of Hours Reactor Was Critical 0.0 0.0_

170529.9

14. Reactor Reserve Shutdown Hours 0.0 0.0 3283.3
15. Hours Generator On-Line 0.0 0.0 166560.7
16. Unit Reserve Shutdown Hours 0.0 0.0 93.7 i
17. Gross Thermal Energy Generated (MWH) 0.0 0.0 314372827.0
18. Gross Electrical Energy Generated (MWH)

_0.0 0.0 105938737.0

19. Net Electrical Energy Generated (MWH)

-2233.0

-18049.0 101036086.0

20. Unit Service Factor 0.0 0.0 74.0
21. Unit Availability Factor 0_.0, 0.0_

74.0

22. Unit Capacity Factor (Using MDC Net)

-0.5

-0.5 68.6

23. Unit Capacity Factor (Using DER Net)

-0.5_

-0.5 68.0

24. Unit Forced Outage Rate
  • 100.0
  • 100.0
  • 14.5
25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

' Shutdown for 10CFR50.54F at time of this report

26. If Unit Shutdown At End Of Report Period, Estimated Date of Startup:

To be determined

27. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l

l 9612200111 961216 PDR ADOCK 05000245 R

pop

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-245 UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newburah TELEPHONE (8601-444-5730 REPORT MONTH: Auaust 1996 2

No.

Date Type' Duration Reason Method of License System Comp *onent Cause & Corrective (Hours)

Shutting Event Code' Code Action to Down Reactor' Report #

Prevent Recurrence 95-10H 951213 F

744 D

4 N/A N/A N/A NRC Category I'l facility; NRC Confirmatory Order requiring independent corrective action verification; design basis verification for response to NRC pursuant to 10CFR50.54(f).

RFO activities continue.

Reason Method

' IEEE Standard 805-1984,

' F: Forced 2

3 S: Scheduled A - Equipment Failure (Explain) 1 - Manual

  • Recommended Practices B - Mainteneance or Test 2 - Manual Scram for System identification in C - Refueling 3 - Automatic Scram Nuclear Power Plants and D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0)

F-Administrative 6 - Other (Explain)

' IEEE Standard 803A-1983 G - Operational Error (Explain)

" Recommended Practices H - Other (Explain) for Unique identification in Power Plants and Related Facilities - Component Function Identifiers"

-