_.s OPERATING DATA REPORT UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newburgh TELEPHONE (860) 444-5730 OPERATING STATUS

1. Docket Number

_50-24 s

2. Reporting Period

_ February 1996

, Notes:

3. Utility Contact G. Newburgh
  • Corrected on 12/12/96 to 4.

Licensed Thermal Power (MWt):

2011 reflect Forced Outage

5. Nameplate Rating (Gross MWe):

662 beginning 12/13/95 @ 0000

6. Design Electrical Rating (Net MWe):

660 due to 10CFR50.54(f) letter

7. Maximum Dependable Capacity (Gross MWe):

670

8. Maximum Dependable Capacity (Net MWe):

641

9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:

N/A 107 Power Level To Which Restricted. If any (Net MWe):

0

11. Reasons For Restrictions,if Any:

NRC Category 11 Facility; design basis verification response pursuant to 10CFR50.54(f).

This Month Yr.-To-Date Cumulative

12. Hours In Reporting Period 696.0 1440.0 221376.0
13. Number Of Hours Reactor Was Critical 0.0 0.0 170529.9
14. Reactor Reserve Shutdown Hours 0.0 0.0 3283.3 i
15. Hours Generator On-Line 0.0 0.0 166560.7
16. Unit Reserve Shutdown Hours 0.0 0.0 93.7
17. Gross Thermal Energy Generated (MWH) 0.0 0.0 314372827.0
18. Gross Electrical Energy Generated (MWH) 0.0 0.0 105938737.0
19. Net Electrical Energy Generated (MWH)

-2514.0

-5196.0 101064755.0 j

20. Unit Service Factor 0.0 0.0 75.2
21. Unit Availability Factor 0.0 0.0 75.3
22. Unit Capacity Factor (Using MDC Net)

-0.6

-0.6 70.0

23. Unit Capacity Factor (Using DER Net)

-0 5_

-0.5 69.2

24. Unit Forced Outage Rate
  • 100.0
  • 100.0
  • 12.5
25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

' Shutdown for 10CFR50.54F at time of this report 2'6. If Unit SEUtdown At EidOf Report PAiodTEstimated Date of Startup:

  • To be determined

~

27. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 9612200088 961215 PDR ADOCK 05000245 R

PDR

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-245 UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newburah TELEPHONE (8601-444-5730 REPORT MONTH: February 1996 2

No.

Date Type' Duration Reason Method of License Code,m Compnent Cause & Corrective Syste Code Action to (Hours)

Shutting Event 3

Down Reactor Report #

Prevent Recurrence 95-10B 951213 F

696 D

4 N/A N/A N/A NRC Category !! facility; design basis venfication for response to NRC pursuant 1

to 10CFR50.54(f).

RFO activities continue.

' F: Forced Reason Method

3 S: Scheduled A - Equipment Failure (Explain) 1 - Manual

" Recommended Practices B - Mainteneance or Test 2 - Manual Scram for System identification in C - Refueling 3 - Automatic Scram Nuclear Power Plants and D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0) 5 F-Administrative 6 - Other (Explain)

IEEE Standard 803A-1983, G - Operational Error (Explain)

" Recommended Practices H - Other (Explain) for Unique identification in Power Plants and Related Facilities - Component Function Identifiers"

-