Text
_.s OPERATING DATA REPORT UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newburgh TELEPHONE (860) 444-5730 OPERATING STATUS
- 1. Docket Number
_50-24 s
- 2. Reporting Period
_ February 1996
, Notes:
- 3. Utility Contact G. Newburgh
- Corrected on 12/12/96 to 4.
Licensed Thermal Power (MWt):
2011 reflect Forced Outage
- 5. Nameplate Rating (Gross MWe):
662 beginning 12/13/95 @ 0000
- 6. Design Electrical Rating (Net MWe):
660 due to 10CFR50.54(f) letter
- 7. Maximum Dependable Capacity (Gross MWe):
670
- 8. Maximum Dependable Capacity (Net MWe):
641
- 9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:
N/A 107 Power Level To Which Restricted. If any (Net MWe):
0
- 11. Reasons For Restrictions,if Any:
NRC Category 11 Facility; design basis verification response pursuant to 10CFR50.54(f).
This Month Yr.-To-Date Cumulative
- 12. Hours In Reporting Period 696.0 1440.0 221376.0
- 13. Number Of Hours Reactor Was Critical 0.0 0.0 170529.9
- 14. Reactor Reserve Shutdown Hours 0.0 0.0 3283.3 i
- 15. Hours Generator On-Line 0.0 0.0 166560.7
- 16. Unit Reserve Shutdown Hours 0.0 0.0 93.7
- 17. Gross Thermal Energy Generated (MWH) 0.0 0.0 314372827.0
- 18. Gross Electrical Energy Generated (MWH) 0.0 0.0 105938737.0
- 19. Net Electrical Energy Generated (MWH)
-2514.0
-5196.0 101064755.0 j
- 20. Unit Service Factor 0.0 0.0 75.2
- 21. Unit Availability Factor 0.0 0.0 75.3
- 22. Unit Capacity Factor (Using MDC Net)
-0.6
-0.6 70.0
- 23. Unit Capacity Factor (Using DER Net)
-0 5_
-0.5 69.2
- 24. Unit Forced Outage Rate
- 100.0
- 100.0
- 12.5
- 25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
' Shutdown for 10CFR50.54F at time of this report 2'6. If Unit SEUtdown At EidOf Report PAiodTEstimated Date of Startup:
- To be determined
~
- 27. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 9612200088 961215 PDR ADOCK 05000245 R
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-245 UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newburah TELEPHONE (8601-444-5730 REPORT MONTH: February 1996 2
No.
Date Type' Duration Reason Method of License Code,m Compnent Cause & Corrective Syste Code Action to (Hours)
Shutting Event 3
Down Reactor Report #
Prevent Recurrence 95-10B 951213 F
696 D
4 N/A N/A N/A NRC Category !! facility; design basis venfication for response to NRC pursuant 1
to 10CFR50.54(f).
RFO activities continue.
' F: Forced Reason Method
3 S: Scheduled A - Equipment Failure (Explain) 1 - Manual
" Recommended Practices B - Mainteneance or Test 2 - Manual Scram for System identification in C - Refueling 3 - Automatic Scram Nuclear Power Plants and D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0) 5 F-Administrative 6 - Other (Explain)
IEEE Standard 803A-1983, G - Operational Error (Explain)
" Recommended Practices H - Other (Explain) for Unique identification in Power Plants and Related Facilities - Component Function Identifiers"
-