Revised Monthly Operating Rept for Aug 1998 for Mnps,Unit 2
ML20195E206
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/31/1998
From: Stark S
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20195D049 List:
References
NUDOCS 9811180268
Download: ML20195E206 (2)


Text

'.

U.S. Nucieer Regulatory Commession .

817535%ttachment 1Page 3 UNIT SHUTDOWNS AND POWER REDUCTIONS' DOCKET NO: 50-336 UNIT NAME: Millstone Cnit 2 DATE: 11/02/98 COMPLETED BY: S. Stark ~

TELEPHONE: (860)447-1791 EXT: 4419 REPORT MONTH: Auoust 1998 No. Date Type' Duration Reason

  • Method of License System Component C.ause & Corrective (Hours) Shutting Event Code' Code' Action to Down Reactor
  • Report # Prevent Recurrence 98-01 03/07/96 S/F 745 B/D 4 N/A N/A N/A Scheduled: Contmued mid cycle surveellance testing from previous month.

. Forced: Continued from previous month. NRC Category lit facility; NRC Confirmatory Order requmng mdependent corrective action verification; NRC order requmng third party review of Millstone Station employee concems program; design basis verification for response to NRC pursuant to 10CFR50.54(f).

'F: Forced ' Reason ' Method 'IEEE Standard 805-1984, S: Scheduled A - Equipment Failure (Explain) 1 - Manual " Recommended Practices B - Maintenance or Test 2 - Manual Scram for System identification in C - Refueling 3 - Automatic Scram Nuclear Power Plants and D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities

  • E - Operator Training & License Examination 5 - Power Reduction (Duration = 0)

F - Administrative 6 - Other (Explain) 'IEEE Standard 803A-1983, j G - Operational Error (Explain) " Recommended Practices H - Other (Explain) for Unique identification in Power Plants and Related 9811180268 981106 2- Facilities - Component PDR R

ADOCK 05000336; PDR L

/ Function identifiers"

{'

l .

l U.S. Nuclear Regulatory Commission I

B17535%ttachment 1\Page 4

" I REFUELING INFORMATION REQUEST

1. Name of the facility: Millstone Unit 2
2. Scheduled date for next refueling outage: Second Quarter of 2000
3. Scheduled date for restart following refueling: First Quarter of 1999 (Note -

The current shutdown is not a refuelina outaae. This date reoresents the exoected startuo date from the current shutdown.)

4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes. There are 27 Technical Soecification Chance Reauests or license amendments which are reauired to be aooroved bv the NRC orior to startuo. As of October 30,1998,23 reauests have been sent to the NRC.12 have been aooroved, and 12 have been imolemented. The 4 remainina chanaes to be submitted are: 1)

Boron Precinitation Hot Lea iniection USQ. 2) Cable Trav Seoaration - USO. 3) SGTR -

Rad Consecuences - USQ. and 4) Loss of Normal Feed - USO.

5. Scheduled date(s) for submitting licensing action and supporting information:

December 30,1998

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures: Small Break LOCA analysis chances and Larae Break LOCA analysis chances.
7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

In Core: (a) _Q. In Spent Fuel Pool: (b) 1085 NOTE: These numbers reoresent the total Fuel Assemblies and Consolidated Fuel Storace Boxes (3 total containina the fuel rods from 6 fuel assemblies) in these two (2) Item Control Areas.

8. The present licensed spent fuel pool storage capacity and the size of any increase in I licensed storage capacity that has been requested or is planned, in number of fuel l assemblies: l Present storaae capacity: 1306 storaae locations l
9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming present license capacity:

2002. Soent Fuel Pool Full. Core offload caoacity is reached. l 2006 Core Full. Soent Fuel Pool Full.