L OPERATING DATA REPORT
'1 I
UNIT NAME Millstone Unit 1 DATE 12/12/96 l
COMPLETED BY G. Newburgh TELEPHONE (860) 444 5730 i
OPERATING STATUS l
- 1. Docket Number 50-245 I
- 2. Reporting Period June 1996 Notes:
- 3. Utility Contact G. Newburgh
' Corrected on 12/12/96 to
' 4. Licensed Thermal Power (MWt):
2011 reflect Forced Outage
- 5. Nameplate Rating (Gross MWe):
662 beginning 12/13/95 @ 0000 j
- 6. Design Electrical Rating (Net MWe):
660 due to 10CFR50.54(f) letter j
7, Maximum Dependable Capacity (Gross MWe):
670
- 8. Maximum Dependable Capacity (Net MWe):
641
- 9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:
l l
N/A 16IPower Level To Which Restricted, If any (Not MWe):
0
- 11. Reasons For Restrictions,if Any:
NRC Category lll Facility; design basis verification response j
pursuant to 10CFR50.54(f).
3 This Month Yr.-To-Date Cumulative
}
l
- 12. Hours in Reporting Period 720.0 4367.0 223583.0
- 13. Number Of Hours Reactor Was Critical 0.0 0.0 170529.9
- 14. Reactor Reserve Shutdown Hours 0.0 0.0 3283.3 j
- 15. Hours Generator On-Line 0.0_
0.0 166560.7
}
j l
- 16. Unit Reserve Shutdown Hours 0.0 0.0 93.7 l
- 17. Gross Thermal Energy Generated (MWH) 0.0 0.0 314372827.0
- 18. Gross Electrical Energy Generated (MWH) 0.0 0.0 105938737.0 l
- 19. Net Electrical Energy Generated (MWH)
-2006.0__
-13701.0 101056250.0
- 30. Unit Service Factor 0.0 0.0 74.5
- 31. Unit Availability Factor 0.0 0.0 74.5 i
- 23. Unit Capacity Factor (Using MDC Net)
-0.4
-0.5 69.1 l
- 33. Unit Capacity Factor (Using DER Net)
-0.4
-0.5 68.4
- 24. Unit Forced Outage Rate
- 100.0
- 100.0
- 13.8
.i
- 25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
' Shutdown for 10CFR50.54F at time of this report l
2'6. If Unit Shutdown At 5iid 6f Report Period, $stimated Date of Startup:
To be determined l
- 37. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved J
INITIAL CRITICALITY N/A N/A i
INITIAL ELECTRICITY N/A N/A j
COMMERCIAL OPERATION N/A N/A 4
1 9612200104 961216 PDR ADOCK 05000245 R
PDR 1
e
- .~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-245
,?^
UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newburuh TELEPHONE (8601-444-5730 REPORT MONTH: June 1996 2
No.
Date Type' Duration Reason Method of License System Comp'onent Cause & Corrective (Hours)
Shutting Event Code' Code Action to Down Reactor' Report #
Prevent Recurrence 95-10F 951213 F
720 D
4 N/A N/A N/A NRC Category lit facility; design basis verification for response to NRC pursuant to 10CFR50.54(f).
RFO activities continue.
' F: Forced Reason Method
S: Scheduled A - Equipment Failure (Explain) 1 - Manual
" Recommended Practices B - Mainteneance or Test 2 - Manual Scram for System Identification in C - Refueling 3 - Automatic Scram Nuclear Power Plants and D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0)
F - Administrative 6 - Other (Explain)
- IEEE Standard 803A-1983, G - Operational Error (Explain)
" Recommended Practices H - Other (Explain) for Unique identification in Power Plants and Related Facilities - Component Function identifiers"
_.