ML20132D763

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for June 1996 for Millstone Power Station,Unit 1
ML20132D763
Person / Time
Site: Millstone 
Issue date: 06/30/1996
From: Newburgh G
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20132D663 List:
References
NUDOCS 9612200104
Download: ML20132D763 (2)


Text

.

j i

^

/

L OPERATING DATA REPORT

'1 I

UNIT NAME Millstone Unit 1 DATE 12/12/96 l

COMPLETED BY G. Newburgh TELEPHONE (860) 444 5730 i

OPERATING STATUS l

1. Docket Number 50-245 I
2. Reporting Period June 1996 Notes:
3. Utility Contact G. Newburgh

' Corrected on 12/12/96 to

' 4. Licensed Thermal Power (MWt):

2011 reflect Forced Outage

5. Nameplate Rating (Gross MWe):

662 beginning 12/13/95 @ 0000 j

6. Design Electrical Rating (Net MWe):

660 due to 10CFR50.54(f) letter j

7, Maximum Dependable Capacity (Gross MWe):

670

8. Maximum Dependable Capacity (Net MWe):

641

9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:

l l

N/A 16IPower Level To Which Restricted, If any (Not MWe):

0

11. Reasons For Restrictions,if Any:

NRC Category lll Facility; design basis verification response j

pursuant to 10CFR50.54(f).

3 This Month Yr.-To-Date Cumulative

}

l

- 12. Hours in Reporting Period 720.0 4367.0 223583.0

13. Number Of Hours Reactor Was Critical 0.0 0.0 170529.9
14. Reactor Reserve Shutdown Hours 0.0 0.0 3283.3 j
15. Hours Generator On-Line 0.0_

0.0 166560.7

}

j l

16. Unit Reserve Shutdown Hours 0.0 0.0 93.7 l
17. Gross Thermal Energy Generated (MWH) 0.0 0.0 314372827.0
18. Gross Electrical Energy Generated (MWH) 0.0 0.0 105938737.0 l
19. Net Electrical Energy Generated (MWH)

-2006.0__

-13701.0 101056250.0

30. Unit Service Factor 0.0 0.0 74.5
31. Unit Availability Factor 0.0 0.0 74.5 i
23. Unit Capacity Factor (Using MDC Net)

-0.4

-0.5 69.1 l

33. Unit Capacity Factor (Using DER Net)

-0.4

-0.5 68.4

24. Unit Forced Outage Rate
  • 100.0
  • 100.0
  • 13.8

.i

25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

' Shutdown for 10CFR50.54F at time of this report l

2'6. If Unit Shutdown At 5iid 6f Report Period, $stimated Date of Startup:

To be determined l

37. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved J

INITIAL CRITICALITY N/A N/A i

INITIAL ELECTRICITY N/A N/A j

COMMERCIAL OPERATION N/A N/A 4

1 9612200104 961216 PDR ADOCK 05000245 R

PDR 1

e

.~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-245

,?^

UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newburuh TELEPHONE (8601-444-5730 REPORT MONTH: June 1996 2

No.

Date Type' Duration Reason Method of License System Comp'onent Cause & Corrective (Hours)

Shutting Event Code' Code Action to Down Reactor' Report #

Prevent Recurrence 95-10F 951213 F

720 D

4 N/A N/A N/A NRC Category lit facility; design basis verification for response to NRC pursuant to 10CFR50.54(f).

RFO activities continue.

' F: Forced Reason Method

S: Scheduled A - Equipment Failure (Explain) 1 - Manual

" Recommended Practices B - Mainteneance or Test 2 - Manual Scram for System Identification in C - Refueling 3 - Automatic Scram Nuclear Power Plants and D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0)

F - Administrative 6 - Other (Explain)

  • IEEE Standard 803A-1983, G - Operational Error (Explain)

" Recommended Practices H - Other (Explain) for Unique identification in Power Plants and Related Facilities - Component Function identifiers"

_.