ML20132D750
| ML20132D750 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 04/30/1996 |
| From: | Newburgh G NORTHEAST NUCLEAR ENERGY CO. |
| To: | |
| Shared Package | |
| ML20132D663 | List: |
| References | |
| NUDOCS 9612200097 | |
| Download: ML20132D750 (2) | |
Text
_
a..
i
)
~
OPERATING DATA REPORT i
UNIT NAME Millstone Unit 1 y
DATE 12/12/96 COMPLETED BY G. Newburgh i
TELEPHONE (860) 444-5730 2
I OPERATING STATUS i
- 1. Docket Number 50-245
- 2. Reporting Period
' April 1996
' Notes:
- 3. Utility Contact G. Newburgh
' Corrected on 12/12/96 to
{
- 4. Licensed Thermal Power (MWt):
2011 reflect Forced Outage i
- 5. Nameplate Rating (Gross MWe):
662 beginning 12/13/95 @ 0000
(
- 6. Design Electrical Rating (Not MWe):
660 due to 10CFR50.54(f) letter
- 7. Maximum Dependable Capacity (Gross MWe):
C70 i
- 8. Maximum Dependable Capacity (Net MWe):
641
- 9. If Changes Occur in Capacity Ratings (items Number 4 Through 8) Since Last Sort, j
Give Reasons:
i
~
N/A
- 10. Power Level To Which Restricted, if any (Net MWe):
0 4
- 11. Reasons For Restrictions,if Any:
NRC Category 11 Facility; design basis verification response pursuant to 10CFR50.54(f).
This Month Yr.-To-Date Cumulative I
- 13. Hours in Reporting Period 719.0 2903.0 222119.0 l
- 13. Number Of Hours Reactor Was Critical 0.0, 0.0 170529.9
- 14. Reactor Reserve Shutdown Hours 0.0 Of 3283.3 i
- 95. Hours Generator On-Line 00 0.0 166560.7 l
- 16. Unit Reserve Shutdown Hours 0.0 0.0 93.7 i
17 Gross Thermal Energy Generated (MWH) 0.0 0.0 314372827.0
- 18. Gross Electrical Energy Generated (MWH) 0.0 0.0 105938737.0 4
- 19. Net Electrit al Energy Generated (MWH)
-2163.0
-9739.0 101060212.0
- 20. Unit Service Factor 0.0 0.0 75.0
- 81. Unit Availability Factor 0.0 0.0_
75.0
- 22. Unit Capacity Factor (Using MDC Net)
-0.5
-0.5 69.5
- 83. Unit Capacity Factor (Using DER Net)
-0.5
-0.5 68.9
- 24. Unit Forced Outage Rate
- 100.0
- 100.0
- 13.2
- 35. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
' Shutdown for 10CFR50.54F at time nf this report 2Df Onit Shutdown At End Of Report Period, Estimated Date of Startup:
To be detennined
- 37. Units in Test Status (Prior to Commercial Operation):
(
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 9612200097 961216" PDR ADOCK 05000245 R
i j
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-245 UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newbumh TELEPHONE (860)-444-5730 REPORT MONTH: April 1996 2
No.
Date Type' Duration Reason Method of License System Compnent Cause & Corrective (Hours)
Shutting Event Code' Code Action to 3
Down Reactor '
Report #
Prcycnt Recurrence 95-10D 951213 F
719 D
4 N/A N/A N/A NRC Category 11 facility; design basis verification for response to NRC pursuant to 10CFR50.54(f).
RFO activities continue.
' F: Forced Reason Method
3
" Recommended Practices S: Scheduled A - Equipment Failure (Explain) 1 - Manual B - Mainteneance or Test 2 - Manual Scram for System identification in C - Refueling 3-Automatic Scram Nuclear Power Plants and D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0) 5 F - Administrative 6 - Other (Explain)
IEEE Standard 803A-1983 G - Operational Error (Explain)
" Recommended Practices H - Other (Explain) for Unique identification in Power Plants and Related Facilities - Component Function identifiers"
__