Text

_

a..

i

)

~

OPERATING DATA REPORT i

UNIT NAME Millstone Unit 1 y

DATE 12/12/96 COMPLETED BY G. Newburgh i

TELEPHONE (860) 444-5730 2

I OPERATING STATUS i

1. Docket Number 50-245
2. Reporting Period

' April 1996

' Notes:

3. Utility Contact G. Newburgh

' Corrected on 12/12/96 to

{

4. Licensed Thermal Power (MWt):

2011 reflect Forced Outage i

5. Nameplate Rating (Gross MWe):

662 beginning 12/13/95 @ 0000

(

6. Design Electrical Rating (Not MWe):

660 due to 10CFR50.54(f) letter

7. Maximum Dependable Capacity (Gross MWe):

C70 i

8. Maximum Dependable Capacity (Net MWe):

641

9. If Changes Occur in Capacity Ratings (items Number 4 Through 8) Since Last Sort, j

Give Reasons:

i

~

N/A

10. Power Level To Which Restricted, if any (Net MWe):

0 4

11. Reasons For Restrictions,if Any:

NRC Category 11 Facility; design basis verification response pursuant to 10CFR50.54(f).

This Month Yr.-To-Date Cumulative I

13. Hours in Reporting Period 719.0 2903.0 222119.0 l
13. Number Of Hours Reactor Was Critical 0.0, 0.0 170529.9
14. Reactor Reserve Shutdown Hours 0.0 Of 3283.3 i
95. Hours Generator On-Line 00 0.0 166560.7 l
16. Unit Reserve Shutdown Hours 0.0 0.0 93.7 i

17 Gross Thermal Energy Generated (MWH) 0.0 0.0 314372827.0

18. Gross Electrical Energy Generated (MWH) 0.0 0.0 105938737.0 4
19. Net Electrit al Energy Generated (MWH)

-2163.0

-9739.0 101060212.0

20. Unit Service Factor 0.0 0.0 75.0
81. Unit Availability Factor 0.0 0.0_

75.0

22. Unit Capacity Factor (Using MDC Net)

-0.5

-0.5 69.5

83. Unit Capacity Factor (Using DER Net)

-0.5

-0.5 68.9

24. Unit Forced Outage Rate
  • 100.0
  • 100.0
  • 13.2
35. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

' Shutdown for 10CFR50.54F at time nf this report 2Df Onit Shutdown At End Of Report Period, Estimated Date of Startup:

To be detennined

37. Units in Test Status (Prior to Commercial Operation):

(

Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 9612200097 961216" PDR ADOCK 05000245 R

PDR

i j

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-245 UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newbumh TELEPHONE (860)-444-5730 REPORT MONTH: April 1996 2

No.

Date Type' Duration Reason Method of License System Compnent Cause & Corrective (Hours)

Shutting Event Code' Code Action to 3

Down Reactor '

Report #

Prcycnt Recurrence 95-10D 951213 F

719 D

4 N/A N/A N/A NRC Category 11 facility; design basis verification for response to NRC pursuant to 10CFR50.54(f).

RFO activities continue.

' F: Forced Reason Method

3

" Recommended Practices S: Scheduled A - Equipment Failure (Explain) 1 - Manual B - Mainteneance or Test 2 - Manual Scram for System identification in C - Refueling 3-Automatic Scram Nuclear Power Plants and D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0) 5 F - Administrative 6 - Other (Explain)

IEEE Standard 803A-1983 G - Operational Error (Explain)

" Recommended Practices H - Other (Explain) for Unique identification in Power Plants and Related Facilities - Component Function identifiers"

__