Docket No. 50-245 B16088 s
1 f
Millstone Unit No.1 4
i Facility Operating License No. DPR-21 Revised Monthly Operating Reports i
4 Y
i a
1 a
1 I'
I i
J k
i' December 1996 s
a 9612200075 961216 PDR ADOCK 05000245 R
OPERATING DATA REPORT UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY GINewburgh l
TELEPHONE (860) 444 5730 OPERATING STATUS I
- 1. Docket Number 50-245
- 2. Reporting Period December 1995 Notes:
- 3. Utility Contact G. Newburgh
' Corrected on 12/12/96 to
- 4. Licensed Thermal Power (MWt):
2011 reflect Forced Outage
- 5. Nameplate Rating (Gross MWe):
662 beginning 12/13/95 @ 0000
- 6. Design Electrical Rating (Net MWe):
660 due to 10CFR50.54(f) Letter l
- 7. Maximum Dependable Capacity (Gross MWe):
670
- 8. Maximum Dependable Capacity (Net MWe):
641
- 9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:
N/A
- 10. Power Level To Which Restricted, If any (Net MWe):
0
- 11. Reasons For Restrictions, if Any:
Design basis verification response pursuant to 10CF'R50.54(f).
This Month
/r.-To-Date Cumulative
- 12. Hours in Reporting Period 744.0 8759.0 219936.0
- 13. Number Of Hours Reactor Was Critical 0.0 7004.3 170529.9
- 14. Reactor Reserve Shutdown Hours 0.0 0.0 3283.3
- 15. Hours Generator On-Line 0.0 6932.4 166560.7
- 16. Unit Reserve Shutdown Hours 0.0 0.0 93.7
- 17. Gross Thermal Energy Generated (MWH) 0.0 13562306.0 314372827.0
- 18. Gross Electrical Energy Generated (MWH) 0.0 4560482.0 105938737.0
- 19. Net Electrical Energy Generated (MWH)
-2645.0 4357344.0 101069951.0
- 20. Unit Service Factor 0.0 79.1 75.7
- 21. Unit Availability Factor 0.0 79.1 75.8 l
- 22. Unit Capacity Factor (Using MDC Net)
-0.6 77.6 70.4 2
l
- 23. Unit Capacity Factor (Using DER Net)
- 100.0
- 100.0
- 11.8
-0.5 75.4 69.6 j
- 24. Unit Forced Outage Rate
- 25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
]
' Shutdown for 10CFR50.54F at time of this report 25Eif UEii5iiuisoissht' End Of Rip ~o~rtWriod[s~stimated~DaieIdStartup:
- To be determined
~
- 27. Units In Test Status (Prior to Commercial Operation);
j Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A l
COMMERCIAL OPERATION N/A N/A l
l l
1 i
i
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-245 UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newburah TELEPHONE (8601-444-5730 REPORT MONTH: December 1995 No.
Date Type' Duration Reason Method of License System Component Cause & Corrective 2
5 (Hours)
Shutting Event Code' Code Action to 3
Down Reactor Report #
Prevent Recurrence 95-09A 951104 S
288 C
4 N/A N/A N/A RFO15.
95-10 951213 F
456 D
6 N/A N/A N/A Design basis verification for (Continuation response to NRC pursuant from scheduled to 10CFR50.54(f).
refueling outage 95-09A.)
RFO activities continue.
Reason Method
' F: Forced 2
S: Scheduled A - Equipment Failure (Explain) 1 - Manual
" Recommended Practices B - Mainteneance or Test 2 - Manual Scram for System Identification in C - Refueling 3 - Automatic Scram Nuclear Power Plants and D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0) 5 F-Administrative 6 - Other (Explain)
IEEE Standard 803A-1983, G - Operational Error (Explain)
" Recommended Practices H - Other (Explain) for Unique identification in Power Plants and Related Facilities - Component Function identifiers"
/
-