Monthly Operating Rept for Nov 1996 for Millstone Nuclear Power Station Unit 1
ML20132D694
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/30/1996
From: Newburgh G
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20132D663 List:
References
NUDOCS 9612200071
Download: ML20132D694 (4)


Text

_ _ _ _

l-1 OPERATING DATA REPORT l

4 UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newburgh TELEPHONE (860) 444-5730 OPERATING STATUS

1. Docket Number 50-245
2. Reporting Period November 1996

. Notes:

3. Utility Contact G. Newburgh

~

4. Licensed Thermal Power (MWt):

2011 -

5. Nameplate Rating (Gross MWe):

662

)

6. Design Electrical Rating (Net MWe):

660

7. Maximum Dependable Capacity (Gross MWe):

670

8. Maximum Dependable Capacity (Net MWe):

641

9. If Changes Occur in Capacity Ratings (items Number 4 Through 8) Since Last Report, Give Reasons:

N/A

10. Power Level To Which Restricted, if any (Net MWe):

0

11. Reasons For Restrictions,if A'1y:

NRC Category 111 Facility; NRd~ Confirmatory Order requiring irnplementation of an independent corrective action verification program: NRC Order requiring a third-party review of the employee concerns program at Millstone Station; design basis verification response pursuant to 10CFR50.54(f).

This Month Yr.-To-Date Cumulative

)

12. Hours in Reporting Period 720.0 8040.0 227256.0 j
13. Number Of Hours Reactor Was Critical 0.0 0.0 170529.9
14. Reactor Reserve Shutdown Hours

~

0.0 0.0 3283.3

15. Hours Generator On-Line 0.0 0.0 166560.7
16. Unit Reserve Shutdown Hours 0.,0_

0.0 93.7 j

17. Gross Thermal Energy Generated (MWH) 0.0 0.0 314372827.0
18. Gross Electrical Energy Generated (MWH) 0.0 0.0 105938737.0
19. Net Electrical Energy Generated (MWH)

-2092.0

-24148.0 101045803.0

20. Unit Service Factor 0.0 0.0 73.3 j
31. Unit Availability Factor 0.0 0.0 73.3
22. Unit Capacity Far *or (Using MDC Net)

-0.5

-0.5 68.0

23. Unit Capacity Fa: tor (Using DER Net)

-0.4

-0.5 67.4

24. Unit Forced Outage 7 ate 100.0_

100.0 15.4

25. Shutdowns Scheda.ed Over Next 6 Months (Type, Date, and Duration of Each):

Shutdown at time of this report

86. If Unit Shutdown At EETO Report Period, Estimated Date of Startup:

To be determined

27. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A j

COMMERCIAL OPERATION N/A N/A

)

1 9612200071 961216 PDR ADOCK 0500 2 R

..a.'

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-245 UNIT NAME Millstone Unit 1

~

DATE 12/12/96 COMPLETED BY G. Newburah TELEPHONE (860)-444-5730 REPORT MONTH: November 1996 No.

Date Type' Duration Reason

  • Method of License System Component Cause & Corrective

~

(Hours)

Shutting Event Code

  • Code' Action to Down Reactor' Report #

Prevent Recurrence 95-10K 951213 F

720 D

4 N/A N/A N/A NRC Category 111 facility; NRC Confirmatory Order requiring independent corrective action verification; NRC Order requiring third-party review of Millstone Station employee concems program; design basis verification for response to NRC pursuant to 10CFR50.54(f).

RFO activities continue.

' F: Forced Reason

  • Method

S: Scheduled A - Equipment Failure (Explain) 1 - Manual

  • Recor.1 mended Practices B - Mainteneance or Test 2 - Manual Scram Sr System Identification in C - Refueling 3 - Automatic Scram Nuclear Power Plants and D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0) 5 F-Administrative 6 - Other (Explain)

IEEE Standard 803A-1983, G -Operational Error (Explain)

" Recommended Practices H - Other (Explain) for Unique identification in Power Plants and Related Facilities -Component Function Identifiers"

.)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-245 i

UNIT: Millstone Unit 1 DATE:

12/12/96 COMPLETED BY:

G. Newburah TELEPHONE: (860)444-5730 MONTH: November 1996 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

l 8

0 24 0

j 9

0 25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

j 15 0

31 N/A 16 0

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

REFUELING INFORMATION REQUEST 1.

Name of the facility:

Millstone Unit 1 2.

Scheduled date for next refueling outage: Current refuelina outaae started November 1995. Next refuelina outaae date to be determined.

3.

Scheduled date for restart following refueling: To be determined 4.

Will refueling or resumption of operation therealter require a technical specification change or other license amendment?

Yes. however the entire scope is to be determined.

5.

Scheduled date(s) for submitting licensing action and supporting information:

None at this time 6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

184 GE-11 fuel assemblies 7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

In Core: (a) 0 in Spent Fuel Pool: (b) 3068 Unconsolidated 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

Present Capacity: Maximum 3229 fuel assembly locations 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming present license capacity:

1998/1999. spent fuel pool full. core offload capacity is reached i