.y OPERATING DATA REPORT UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newburgh TELEPHONE (860) 444-5730 OPERATING STATUS

1. Docket Number 50-245
2. Reporting Period

_ October 1996

' Notes:

3. Utility Contact G. Newburgh
  • Corrected on 12/12/96 to 4.

Licensed Thermal Power (MWt):

2011 reflect Forced Outage

5. Nameplate Rating (Gross MWe):

662 beginning 12/13/95 @ 0000

6. Design Electrical Rating (Net MWe):

660 due to 10CFR50.54(f) letter

7. Maximum Dependable Capacity (Gross MWe):

670

  • EDT to EST
8. Maximum Dependable Capacity (Net MWe):

641

9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:

N/A

10. Power Level To Which Restricted, if any (Net MWe):

-~

0 11, Reasons For Restrictions, if Any:

NRC Category lil Facility; NRC Confirmatory Order requiring implementation of an independent corrective action verification program; NRC Order requiring a third-party review c' the employee concerns program at Millstone Station; design basis verification response pursuant to 10CFR50.54(f).

This Month Yr.-To-Date Cumulative

12. Hours in Reporting Period 745.0 "

7320.0_

226536.0

13. Number Of Hours Reactor Was Critical 0.0 0.0 170529.9
14. Reactor Reserve Shutdown Hours 0.0_

0.0 3283.3

15. Hours Generator On-Line 0.0 0.0 166560.7
16. Unit Reserve Shutdown Hours 0.0 0.0 93.7
17. Gross Thermal Energy Generated (MWH) 0.0 0.0 314372827.0
18. Gross Electrical Energy Generated (MWH) 0.0 0.0 105938737.0
19. Net Electrical Energy Generated (MWH)

-1943.0

-22056.0 101047895.0

20. Unit Service Factor 0.0 0.0_

73.5

21. Unit Availability Factor 0.0 0.0_

73.6

22. Unit Capacity Factor (Using MDC Net)

-0.4

-0.5_

68.2

23. Unit Capacity Factor (Using DER Net)

-0.4

-0.5 67.6

24. Unit Forced Outage Rate
  • 100.0
  • 100.0
  • 15.1 25, Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
  • Shutdown for 10CFR50.54F at time of this report 25 If Unit Shutdown At EMDi' Report Period, Estimated Date of Startup:

~To be determined

27. Units in Test Status (Prior to Commercial Operation):

n Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 2

119 961216 R

OCK 05000245 PDR

\\

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-245 UNIT NAME Millstone Unit 1 DATE 11/12/96 COMPLETED BY G. Newburah TELEPHONE (8601-444-5730

[

i REPORT MONTH: October 1996 j

i 2

No.

Date Type' Duration Reason Method of License System Comp,onent Cause & Corrective

.i (Hours)

Shutting Event

' Code' Code Action to

[

Down Reactor' Report #

Prevent Recurrence I

j 95-10J 951213 F

745 D

4' N/A N/A N/A NRC Category lit facility; NRC Confirmatory Order requiring independent j

corrective action verification; NRC Order f

requiring third-party review of Millstone Station empioyee concems j

program; design basis j

verification for response to l

NRC pursuant to l

10CFR50.54(f).

I RFO activities continue.

l

(

t Reason Method

' IEEE Standard 805-1984, I

3

' F: Forced 2

S: Scheduled A - Equipment Failure (Explain) 1 - Manual

" Recommended Practices B - Mainteneance or Test 2 - Manual Scram for System identiScation in C - Refueling 3 - Automatic Scram Nuclear Power Plants and

[

D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0) t F - Administrative 6 - Other (Explain)

IEEE Standard 803A-1983, 5

G - Operational Error (Explain)

" Recommended Practices H - Other (Explain) for Unique identification in

(

Power Plants and Related Facilities - Component

[

Function Identifiers"

[

-. =

-