.y OPERATING DATA REPORT UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newburgh TELEPHONE (860) 444-5730 OPERATING STATUS
- 1. Docket Number 50-245
- 2. Reporting Period
_ October 1996
' Notes:
- 3. Utility Contact G. Newburgh
- Corrected on 12/12/96 to 4.
Licensed Thermal Power (MWt):
2011 reflect Forced Outage
- 5. Nameplate Rating (Gross MWe):
662 beginning 12/13/95 @ 0000
- 6. Design Electrical Rating (Net MWe):
660 due to 10CFR50.54(f) letter
- 7. Maximum Dependable Capacity (Gross MWe):
670
- EDT to EST
- 8. Maximum Dependable Capacity (Net MWe):
641
- 9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:
N/A
- 10. Power Level To Which Restricted, if any (Net MWe):
-~
0 11, Reasons For Restrictions, if Any:
NRC Category lil Facility; NRC Confirmatory Order requiring implementation of an independent corrective action verification program; NRC Order requiring a third-party review c' the employee concerns program at Millstone Station; design basis verification response pursuant to 10CFR50.54(f).
This Month Yr.-To-Date Cumulative
- 12. Hours in Reporting Period 745.0 "
7320.0_
226536.0
- 13. Number Of Hours Reactor Was Critical 0.0 0.0 170529.9
- 14. Reactor Reserve Shutdown Hours 0.0_
0.0 3283.3
- 15. Hours Generator On-Line 0.0 0.0 166560.7
- 16. Unit Reserve Shutdown Hours 0.0 0.0 93.7
- 17. Gross Thermal Energy Generated (MWH) 0.0 0.0 314372827.0
- 18. Gross Electrical Energy Generated (MWH) 0.0 0.0 105938737.0
- 19. Net Electrical Energy Generated (MWH)
-1943.0
-22056.0 101047895.0
- 20. Unit Service Factor 0.0 0.0_
73.5
- 21. Unit Availability Factor 0.0 0.0_
73.6
- 22. Unit Capacity Factor (Using MDC Net)
-0.4
-0.5_
68.2
- 23. Unit Capacity Factor (Using DER Net)
-0.4
-0.5 67.6
- 24. Unit Forced Outage Rate
- 100.0
- 100.0
- 15.1 25, Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- Shutdown for 10CFR50.54F at time of this report 25 If Unit Shutdown At EMDi' Report Period, Estimated Date of Startup:
~To be determined
- 27. Units in Test Status (Prior to Commercial Operation):
n Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 2
119 961216 R
OCK 05000245 PDR
\\
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-245 UNIT NAME Millstone Unit 1 DATE 11/12/96 COMPLETED BY G. Newburah TELEPHONE (8601-444-5730
[
i REPORT MONTH: October 1996 j
i 2
No.
Date Type' Duration Reason Method of License System Comp,onent Cause & Corrective
.i (Hours)
Shutting Event
' Code' Code Action to
[
Down Reactor' Report #
Prevent Recurrence I
j 95-10J 951213 F
745 D
4' N/A N/A N/A NRC Category lit facility; NRC Confirmatory Order requiring independent j
corrective action verification; NRC Order f
requiring third-party review of Millstone Station empioyee concems j
program; design basis j
verification for response to l
NRC pursuant to l
I RFO activities continue.
l
(
t Reason Method
3
' F: Forced 2
S: Scheduled A - Equipment Failure (Explain) 1 - Manual
" Recommended Practices B - Mainteneance or Test 2 - Manual Scram for System identiScation in C - Refueling 3 - Automatic Scram Nuclear Power Plants and
[
D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0) t F - Administrative 6 - Other (Explain)
IEEE Standard 803A-1983, 5
G - Operational Error (Explain)
" Recommended Practices H - Other (Explain) for Unique identification in
(
Power Plants and Related Facilities - Component
[
Function Identifiers"
[
-. =
-