ML20132D721

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Jan 1996 for Millstone Power Station,Unit 1
ML20132D721
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/31/1996
From: Newburgh G
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20132D663 List:
References
NUDOCS 9612200083
Download: ML20132D721 (2)


Text

.,,

OPERATING DATA REPORT UNIT NAME Mittstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newburgh TELEPHONE (860) 444-5730 OPERATING STATUS

1. Docket Number 50-245
2. Reporting Period January 1996 Notes:
3. Utility Contact G. Newburgh
  • Corrected on 12/12/96 to
4. LicensedThermalPower(MWt):

2011-reflect Forced Outage I

5. Nameplate Rating (Gross MWe):

662 beginning 12/13/95 @ 0000

6. Design Electrical Rating (Net MWe):

660 due to 10CFR50.54(f) Letter

7. Maximum Dependable Capacity (Gross MWe):

670 l

8. Maximum Dependable Capacity (Net MWe):

641

9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:

N/A i

107 Power Level To Which Restricted, if any (Net MWe):

0

11. Reasons For Restrictions,If Any:

NRC Category 11 Facility; design basis verification response pursuant to 10CFR50.54(f).

This Month Yr.-To-Date Cumulative

12. Hours in Reporting Period 744.0 744.0 220680.0
13. Number Of Hours Reactor Was Critical 0.0 0.0 170529.9
14. Reactor Reserve Shutdown Hours 0.0 0.0 3283.3 l
15. Hours Generator On-Line 0.0 0.0 166560.7
16. Unit Reserve Shutdown Hours 0.0_

0.0 93.7

17. Gross Thermal Energy Generated (MWH) 0.0 0.0 3_14372827.0
18. Gross Electrical Energy Generated (MWH) 0.0 0.0 105938737.0
19. Net Electrical Energy Generated (MWH)

-268570~

-2682.0 101067269.0

20. Unit Service Factor 0.0 0.0 75.5
21. Unit Availability Factor 65 0.0 75.5
22. Unit Capacity Factor (Using MDC Net)

-0.6

-0.6 70.2

23. Unit Capacity Factor (Using DER Net)

-0.5

-0.5 69.4

24. Unit Forced Outage Rate
  • 100.0
  • 100.0
  • 12.2 l
25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
26. If Unit Shutdown At End Of Report Period. Estimated Date of Startup:
  • To be determined
27. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A t

COMMERCIAL OPERATION N/A N/A i

l 9612200083 961216 l

PDR ADOCK 05000245 R

PDR

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-245 UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newburoh TELEPHONE (860)-444-5730 REPORT MONTH: January 1996 2

I.

No.

Date Type' Duration Reason Method of License System Comp,onent Cause & Corrective (Hours)

Shutting Event Code' Code Action to 3

Down Reactor Report #

Prevent Recurrence j

95-10A 951213 F

744 D

4 N/A N/A N/A NRC Category 11 facility:

l design basis verification for response to NRC pursr.rit i

to 10CFR50.54(f).

RFO activities continua.

l i

  • F: Forced Reason Method

' IEEE Standard 805-1984, 2

3 j

S: Scheduled A - Equipment Failure (Explain) 1 - Manual

" Recommended Practices B - Mainteneance or Test 2 - Manual Scram for System identification in C - Refueling 3 - Automatic Scram Nuclear Power Plants and D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0) 5 F - Administrative 6 - Other (Explain)

IEEE Standard 803A-1983, G - Operational Error (Explain)

" Recommended Practices H - Other (Explain) for Unique identification in Power Plants and Related Facilities - Component i

Function idenMers"

-.