OPERATING DATA REPORT UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newburgh TELEPHONE (860) 444-5730 O_P_ERATING STATUS
- 1. Docket Number 50_245 J
- 2. Reporting Period
. ujy 1996 Notes:
- 3. Utility Contact G. Newburgh
' Corrected on 12/12/96 to
- 4. Licensed Thermal Power (MWt):
2')11 reflect Forced Outage
- 5. Nameplate Rating (Gross MWe):
662 beginning 12/13/95 @ 0000
- 6. Design Electrical Rating (Net MWe):
660 due to 10CFR50.54(f) letter
- 7. Maximum Dependable Capacity (Gross MWe):
670
- 8. Maximum Dependable Capacity (Net MWe):
641
- 9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8[Since Last Report.
Give Reasons:
_ N/A 16.~ Power Level TOVShh Restricied,'lf any (NeITdWe)T~
0 e
- 11. Reasons For Restrictions, if Any:
NRC Category ill Facility; design basis verification response pursuant to 10CFR50.54(f).
This Month Yr.-To-Date Cumulative
- 12. Hours in Reporting Period 744.0 5111.0 224327.0
- 13. Number Of Hours Reactor Was Critical 0.0_
0.0_
170529.9
- 14. Reactor Reserve Shutdown Hours 0.0 0.0 3283.3
- 15. Hours Generator On-Line 0.0_
0.0 166560.7
- 16. Unit Reserve Shutdown Hours 0.0 0.0 93.7
- 17. Gross Thermal Energy Generated (MWH) 0.0_
0.0 314372827.0
- 18. Gross Electrical Energy Generated (MWH) 0.0 0.0 105938737.0
- 19. Net Electrical Energy Generated (MWH) 2115.0
-15816.0 101054135.0
- 20. Unit Service Factor 0.0, 0._0, 74.2
- 21. Unit Availability Factor 0.0 0.0 74.3
- 22. Unit Capacity Factor (Using MDC Net)
-0.4
-0.5 68.8
- 23. Unit Capacity Factor (Using DER Net)
-0.4
-0.5 68.3
- 24. Unit Forced Outage Rate
- 100.0
- 100.0
- 14.2
- 25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
' Shutdown for 10CFR50.54F at time of this report 263Dnit Shutdown At EEd Oi Report Period. Estimated 'Date of Startup:
To be determined
~ ~ ~
~
~
- 27. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY N/A N/A_
INIT%L ELECTRICITY N/A N/A l
COMMERCIAL OPERATION N/A N/A l
l L
9612200108 961216 PDR ADDCK 05000245 R
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-245 UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newbumh TELEPHONE (8601-444-5730 REPORT MONTH: July 1996 2
No.
Date Type' Duration Reason Method of License System Component Cause & Corrective (Hours)
Shutting Event Code' Code
- Action to 3
Down Reactor Report #
Prevent Recurrence 95-10G 951213 F
744 D
4 N/A N/A N/A NRC Category lit facility; design basis verification for response to NRC pursuant to 10CFR50.54(f).
RFO activities continue.
' F: Forced Reason Method
2 3
S: Scheduled A - Equipment Failure (Explain) 1 - Manual
" Recommended Practices B - Mainteneance or Test 2 - Manual Scram for System identification in C - Refueling 3 - Automatic Scram Nuclear Power Plants and D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0)
F - Administrative 6 - Other (Explain)
' IEEE Standard 803A-1983, G - Operational Error (Explain)
" Recommended Practices H - Other (Explain) for Unique identification in Power Plants and Related Facilities - Component Function identifiers"
--