l :.

OPERATING DATA REPORT UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newburgh TELEPHONE (860) 444-5730 O_P_ERATING STATUS

1. Docket Number 50_245 J
2. Reporting Period

. ujy 1996 Notes:

3. Utility Contact G. Newburgh

' Corrected on 12/12/96 to

4. Licensed Thermal Power (MWt):

2')11 reflect Forced Outage

5. Nameplate Rating (Gross MWe):

662 beginning 12/13/95 @ 0000

6. Design Electrical Rating (Net MWe):

660 due to 10CFR50.54(f) letter

7. Maximum Dependable Capacity (Gross MWe):

670

8. Maximum Dependable Capacity (Net MWe):

641

9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8[Since Last Report.

Give Reasons:

_ N/A 16.~ Power Level TOVShh Restricied,'lf any (NeITdWe)T~

0 e

11. Reasons For Restrictions, if Any:

NRC Category ill Facility; design basis verification response pursuant to 10CFR50.54(f).

This Month Yr.-To-Date Cumulative

12. Hours in Reporting Period 744.0 5111.0 224327.0
13. Number Of Hours Reactor Was Critical 0.0_

0.0_

170529.9

14. Reactor Reserve Shutdown Hours 0.0 0.0 3283.3
15. Hours Generator On-Line 0.0_

0.0 166560.7

16. Unit Reserve Shutdown Hours 0.0 0.0 93.7
17. Gross Thermal Energy Generated (MWH) 0.0_

0.0 314372827.0

18. Gross Electrical Energy Generated (MWH) 0.0 0.0 105938737.0
19. Net Electrical Energy Generated (MWH) 2115.0

-15816.0 101054135.0

20. Unit Service Factor 0.0, 0._0, 74.2
21. Unit Availability Factor 0.0 0.0 74.3
22. Unit Capacity Factor (Using MDC Net)

-0.4

-0.5 68.8

23. Unit Capacity Factor (Using DER Net)

-0.4

-0.5 68.3

24. Unit Forced Outage Rate
  • 100.0
  • 100.0
  • 14.2
25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

' Shutdown for 10CFR50.54F at time of this report 263Dnit Shutdown At EEd Oi Report Period. Estimated 'Date of Startup:

To be determined

~ ~ ~

~

~

27. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY N/A N/A_

INIT%L ELECTRICITY N/A N/A l

COMMERCIAL OPERATION N/A N/A l

l L

9612200108 961216 PDR ADDCK 05000245 R

PDR

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-245 UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newbumh TELEPHONE (8601-444-5730 REPORT MONTH: July 1996 2

No.

Date Type' Duration Reason Method of License System Component Cause & Corrective (Hours)

Shutting Event Code' Code

  • Action to 3

Down Reactor Report #

Prevent Recurrence 95-10G 951213 F

744 D

4 N/A N/A N/A NRC Category lit facility; design basis verification for response to NRC pursuant to 10CFR50.54(f).

RFO activities continue.

' F: Forced Reason Method

2 3

S: Scheduled A - Equipment Failure (Explain) 1 - Manual

" Recommended Practices B - Mainteneance or Test 2 - Manual Scram for System identification in C - Refueling 3 - Automatic Scram Nuclear Power Plants and D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0)

F - Administrative 6 - Other (Explain)

' IEEE Standard 803A-1983, G - Operational Error (Explain)

" Recommended Practices H - Other (Explain) for Unique identification in Power Plants and Related Facilities - Component Function identifiers"

--