Text
t l
OPERATING DATA REPORT f
i UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newburgh TELEPHONE (860) 444-5730 OPERATING STATUS
- 1. Docket Number 50-245
- 3. Reporting Period September 1996
- Notes:
- 3. Utility Contact G. Newburgh
- Corrected on 12/12/96 to I
- 4. Licensed Thermal Power (MWt):
20I1 reflect Forced Outage
- 5. Nameplate Rating (Gross MWe):
662 beginning 12/13/95 @ 0000
- 6. Design Electrical Rating (Net MWe):
660 due to 10CFR50.54(f) letter
- 7. Maximum Dependable Capacity (Gross MWe):
670
- 8. Maximum Dependable Capacity (Net MWe):
641
- 9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:
N/A 1EPower Level To Which Restricted, if any (Net MWe):
0
- 19. Reasons For Restrictions,if Any:
_ NRC Category 111 Facility; NRC Confirmatory Order requiring implementation of an independent corrective action verification program; design basis verification response purcuant to 10CFR50.54(f).
This Month Yr.-To-Date Cumulative
- 12. Hours in Reporting Period 720.0 6575.0 225791.0
- 13. Number Of Hours Reactor Was Critical 0.0 0.0 170529.9
- 14. Reactor Reserve Shutdown Hours 0.0 0.0 3283.3
- 15. Hours Generator On-Line 0.0 0.0 166560.7
- 16. Unit Reserve Shutdown Hours 0.0 0.0 93.7 17, Gross Thermal Energy Generated (MWH) 0.0 0.0 314372827.0
- 18. Gross Electrical Energy Generated (MWH) 0.0 0.0 105938737.0
- 19. Net Electrical Energy Generated (MWH)
-2064.0
-20113.0 101049838.0
- 30. Unit Service Factor 0.0 0.0 73.8
- 29. Unit Availability Factor 0.0 0.0 73.8
- 23. Unit Capacity Factor (Using MDC Net)
-0.4
-0.5_
68.4
- 23. Unit Capacity Factor (Using DER Net)
-0.4
-0.5 67.8
- 24. Unit Forced Outage Rate
- 100.0
- 100.0
- 14.8 l
- 35. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Eacn):
- Shutdown for 10CFR50.54F at time of this report
- 26. If Unit Shutdown At End Of Report Period, Estimated Date of Startup:
To be determined
- 37. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 9612200116 961216 PDR ADOCK 05000245 R
.'g s
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-245 UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newburah TELEPHONE (8601-444-5730
?
I REPORT MONTH: September 1996 2
No.
Date Type' Duration Reason Method of License Syste,m Comp,onent Cause & Corrective (Hours)
Shutting Event Code Code Action tq Down Reactor' Report #
Prevent Recurrence 95-10I 951213 F
720 D
4 N/A N/A N/A NRC Category ill facility;
}
NRC Confirmatory Order requiring independent corrective t.ction verification; design basis verification for response to NRC pursuant to r
RFO activities continue.
' F: Forced Reason Method
3 S: Scheduled A - Equipment Failure (Explain) 1 - Manual
" Recommended Practices 3
B - Mainteneance or Test 2 - Manual Scram for System identification in C - Refueling 3 - Automatic Scram Nuclear Power Plants and i
D - Regulatory Restridion 4 - Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0)
[
5 F - Administrative 6 - Other (Explain)
IEEE Standard 603A-1983, G - Operational Error (Explain)
" Recommended Practices H - Other (Explain) for Unique identification in
['
Power Plants and Related Facilities - Component i
Function identifiers' e
I
... i
_