Revised Monthly Operating Rept for Sept 1996 for Millstone Power Station,Unit 1
ML20132D787
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/30/1996
From: Newburgh G
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20132D663 List:
References
NUDOCS 9612200116
Download: ML20132D787 (2)


Text

t l

OPERATING DATA REPORT f

i UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newburgh TELEPHONE (860) 444-5730 OPERATING STATUS

1. Docket Number 50-245
3. Reporting Period September 1996
Notes:
3. Utility Contact G. Newburgh
  • Corrected on 12/12/96 to I
4. Licensed Thermal Power (MWt):

20I1 reflect Forced Outage

5. Nameplate Rating (Gross MWe):

662 beginning 12/13/95 @ 0000

6. Design Electrical Rating (Net MWe):

660 due to 10CFR50.54(f) letter

7. Maximum Dependable Capacity (Gross MWe):

670

8. Maximum Dependable Capacity (Net MWe):

641

9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:

N/A 1EPower Level To Which Restricted, if any (Net MWe):

0

19. Reasons For Restrictions,if Any:

_ NRC Category 111 Facility; NRC Confirmatory Order requiring implementation of an independent corrective action verification program; design basis verification response purcuant to 10CFR50.54(f).

This Month Yr.-To-Date Cumulative

12. Hours in Reporting Period 720.0 6575.0 225791.0
13. Number Of Hours Reactor Was Critical 0.0 0.0 170529.9
14. Reactor Reserve Shutdown Hours 0.0 0.0 3283.3
15. Hours Generator On-Line 0.0 0.0 166560.7
16. Unit Reserve Shutdown Hours 0.0 0.0 93.7 17, Gross Thermal Energy Generated (MWH) 0.0 0.0 314372827.0
18. Gross Electrical Energy Generated (MWH) 0.0 0.0 105938737.0
19. Net Electrical Energy Generated (MWH)

-2064.0

-20113.0 101049838.0

30. Unit Service Factor 0.0 0.0 73.8
29. Unit Availability Factor 0.0 0.0 73.8
23. Unit Capacity Factor (Using MDC Net)

-0.4

-0.5_

68.4

23. Unit Capacity Factor (Using DER Net)

-0.4

-0.5 67.8

24. Unit Forced Outage Rate
  • 100.0
  • 100.0
  • 14.8 l
35. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Eacn):
26. If Unit Shutdown At End Of Report Period, Estimated Date of Startup:

To be determined

37. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 9612200116 961216 PDR ADOCK 05000245 R

PDR

.'g s

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-245 UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newburah TELEPHONE (8601-444-5730

?

I REPORT MONTH: September 1996 2

No.

Date Type' Duration Reason Method of License Syste,m Comp,onent Cause & Corrective (Hours)

Shutting Event Code Code Action tq Down Reactor' Report #

Prevent Recurrence 95-10I 951213 F

720 D

4 N/A N/A N/A NRC Category ill facility;

}

NRC Confirmatory Order requiring independent corrective t.ction verification; design basis verification for response to NRC pursuant to r

10CFR50.54(f).

RFO activities continue.

' F: Forced Reason Method

3 S: Scheduled A - Equipment Failure (Explain) 1 - Manual

" Recommended Practices 3

B - Mainteneance or Test 2 - Manual Scram for System identification in C - Refueling 3 - Automatic Scram Nuclear Power Plants and i

D - Regulatory Restridion 4 - Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0)

[

5 F - Administrative 6 - Other (Explain)

IEEE Standard 603A-1983, G - Operational Error (Explain)

" Recommended Practices H - Other (Explain) for Unique identification in

['

Power Plants and Related Facilities - Component i

Function identifiers' e

I

... i

_