Monthly Operating Rept for Feb 1999 for Millstone Nuclear Power Station,Unit 1.With
ML20204C955
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/28/1999
From: Harkness E, Newburgh G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
B17694, NUDOCS 9903240042
Download: ML20204C955 (6)


Text

m

  • N ust
  • Pe Ftrry Rd. (Route 156), Wtterford, CT 06385 hi NuclearEnergy niiistone Nociear power siation Northeast Nuclear Energy Company P.O. Box 128
  • . Waterford, CT 06385-0128 (860) 447 1791 Faz (860) 444-4277

'Ibe Northeast Utihties System MAR I i 1999 Docket No. 50-245 B17694 U.S. Nuclear Regulatory Commission Attention: Document Cc 7 trol Desk Washington, DC 20555 Millstone Nuclear Power Station, Unit No.1 Facility Operating License No. DPR-21 Monthly Operatino Report in accordance with the :eport requirements of Technical Spe '"! cation Section 6.9.1 ' for Millstone Unit No.1, enclosed is the Monthly Operating %/ ort for the month of February,1999.

Should you have any questions regarding thk. submittal, please contact Mr. Paul Willoughby at (860) 447-1791, Ext. 3655.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY Y sk E. Harbiess, Director- Unit Operations Attachments (1)

I cc: H. J. Miller, Region i Administrator L. L. Wheeler, NRC Project Manager, Millstone Unit No.1 gC j m*MaM98 R

onm.s art n-n

., i-I

., Docket No. 50-245 B17694 l

Attachnwnt 1 Millstone Nuclear Power Station, Unit No.1 Facility Operating License No. DPR-21 Monthly Operating Report - February 1999 l

i 1 i

i

!- 1 l

March 1999 i

[ l

"', U.S.'Nucl ar R::gulitory. Commission B17694%ttachment 1\Page 1 l REFUELING INFORMATION REQUEST i i

l I

l

1. Name of the facility: Millstone Unit No.1 l
2. Scheduled date for next refueling outage:Permanentiv ceased operation and i certifications submitted to the NRC in accordance with 10CFR50.82.G _
3. Scheduled date for restart following refueling: N/A
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? N/A i 5. Scheduled date(s) for submitting licensing action and supporting information:

l N/A

6. Important' licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or pcformance analysis methods, significant changes in fuel design, new opersting procedures: N/A
7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

In Core: (a) 0 In Spent Fuel Pool: (b) 3068 Unconsolidated

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fue! assemblies:

Present Capacity: Maximum 3229 fuel assembly locations

9. The projected date of the last refueling that can be discharged to the spent fuel pool c.;suming present license capacity: N/A i

l i

(

  • B. D. Kenyon letter to U. S. Nuclear Regulatory. Commission, "Millstono Nucelar Power Station, Unit

! , No.1, Certification of Permanent Cessation of Power Operations and that Fuel has been Permanently Removed from the Reactor," dated July 21,1998.

l

r-

{

, U.h Nuclerr Rrgulatory Commission B17694\ Attachment 1\Page 2

.. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-245 UNIT: Millstone Unit 1 DATE: 3/5/99 COMPLETED BY: G. Newburah TELEPHONE: (860) 444-5730 MONTH: February 1999 DAY AVG. DAILY FOWER LEVEL DAY AVG. DAILY POWER LEVEL (MWe-Net) (MWe-Net) l 1 0 17 0 2 0 '48 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 .

O M 0 26 0 11 0 27 0 12 0 28 0 ,

13 0 29 N/A l l

14 0 30 N/A l

15 0 31 N/A l 16 0 j INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the  !

reporting month. Compute to the nearest whole megawatt. l i

1

. U.T. Nucle:r Regultt':ry Commission B17694\ Attachment 1\Page 3 l UNIT NAME: Millstone Unit 1 DATE: 3/5/99 COMPLETED BY: G. Newburgh TELEPHONE: (860)444-5730 OPERATING STATUS

1. Docket Number 50-245
2. Reporting Period February 1999 Notes:
3. Utility Contact G. Newburgh
4. Licensed Thermal Power (MWt): 2011
5. Nameplate Rating (Gross MWe): 662
6. Design Electrical Rating (Net MWe): 660
7. Maximum Dependable Capacity (Gross MWe): 670
8. Maximum Dependable Capacity (Net MWe): 641
9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, l Give Reasons: N/A l
10. Power Level To Which Restricted, if any (Net MWe): 0
11. Reasons For Restrictions, if Any: Permanently ceased operations and certifications submitted to the NRC in accordance with 10CFR50.82 This Month Yr.-To-Date Cumulative l
12. Hours in Reporting Period 672.0 1416.0 246936.0
13. Number Of Hours Reactor Was Critical 0.0 0.0 170529.9
14. Reactor Reserve Shutdown Hours 0.0 0.0 3283.3
15. Hours Generator On-Line 0.0 0.0 166560.7
16. Unit Reserve Shutdown Hours 0.0 0.0 93.7
17. Gross Thermal Energy Generated (MWH) 0.0 0.0 314372827.0
18. Gross Electrical Energy Generated (MWH) 0.0 0.0 105938737.0
19. Net Electrical Energy Generated (MWH) -1826.0 -3856.0 100990112.0
20. Unit Service Factor 0.0 0.0 67.5
21. Unit Availability Factor 0.0 0.0 67.5
22. Unit Capacity Factor (Using MDC Net) -0.4 -0.4 62.6
23. Unit Capacity Factor (Using DER Net) -0.4 -0.4 62.0
24. Unit Forced Outage Rate 100.0 100.0 23.4
25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Shutdown at time of this report

26. If Unit Shutdowa At End Of Report Period, Estimated Date of Startup: Unit has permanently ceased l operations.
27. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved l lNITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A t

_ * .t

_ 5 1 h 0 4 it a r 7 3 ,

,.2

- n u )

,s idn 3 snd 0 U b 5- e e )i i i(

4 e 8 c no a n 8 9 eie 5 e w 4 v c (

)) 1 ticnt

. n e 4 it n 1 1 9it 1- cU s cie olatne c e ((

Oo N Ns t

4

)

0 e

r r

r u

))

aa

(( 5 0Pf aat n r icit a AaaRn 3 r 0Pid t

c o

G6 d ni Pri"s r

_ l ot ceo 22 8 8 dt np fi e

- l Ti 88 E M Y( 8 K

CnR

&ito 00 drdd e e el it drde en am a so C EBE ec nt 55 RR da niwic oa dn e nI d t nC O AEO MDN sAe v FF n amemPF e amul ea-

_ D NT E H u

a e r

CC 00 t

Smtsa rd e SmiqP it t

ri se TL P C P 1 1 EcSl oyet acl on el N P EL I

Ee r ue EcUwi Ee r oac UME ERoNR I " f doPF f OT

  • C t n

e n

o'e p

md h) oo t 0 n

CC o=

Mn stio ua ior v u S m eD N te 'e A r(

mPno

/

O sd yo N I

T SC mrami) t n C 9 coci U 9 9 aSf r

c r

ua d lp D 1 cdex E

R y

r e # l aa SieRE l

t au nr(

R a

u s n t t

r uumier e E br eepno doaannotnwh t uoot .

W e cve hMMACPO _

F iLER t e- - - - - -

O  :

M1 23456 P H D T '

N N 'r A O o S M t c

N T f a n R o e o W d n gR it O O oin a P t 4 n D

T E ht t

eh o uw i m

U R MSD a H x S E T )

n e

s )

I

  • i n n N n la e ia U o s

p c lp xt ni L x a F Es o e ( e E R eT r r c&

it ig r

(

r t

n o r

iuo l si eni eEir )n n ae Ravl o Fc n ri t a n a alp is s io )s t

n e aegor yT r

r n x t o t r 2 im au r o u

7 6 melniatosiE pt nt el uri anri at (r e

m4 D(H n o qiuif nu a e e gemeph oe Cg sEMRROA pd OO t

a a y e - - - - - - - -

rP o\

'ep RABCDEFGH t 1 y S 2 lat T u

gen 3 em Rh c t e

1 2

1 a 5 d r

a a D 9 e et t

lu

- A doee lc\

u4 L

L c rh N9 0 oc

_ 6 1 FS S.. 17 o 5 FS UB N 9 '