Revised Monthly Operating Rept for May 1996 for Millstone Power Station,Unit 1
ML20132D756
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/31/1996
From: Newburgh G
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20132D663 List:
References
NUDOCS 9612200100
Download: ML20132D756 (2)


Text

OPERATING DATA REPORT UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newburgh TELEPHONE (860) 444-5730 OPERATING STATUS

1. Docket Number 50-245
2. Reporting Period May 1996 Notes:
3. Utility Contact G. Newburgh_

' Corrected on 12/12/96 to

4. Licensed Thermal Power (MWt):

2011_

reflect Forced Outage

5. Nameplate Rating (Gross MWe):

662 beginning 12/13/95 @ 0000

6. Design Electrical Rating (Net MWe):

670 G60 due to 10CFR50.54(f) letter

7. Maximum Dependable Capacity (Gross MWe):
8. Maximum Dependable Capacity (Net MWe):

641

9. If Changes Occur in Capacity Ratings (items Number 4 Through 8) Since Last RVort, Give Reasons:

N/A

10. Power Level To Which Restricted, If any (Net MWe):

0

11. Reasons For Restrictions,if Any:

NRC Category 11 Facility; design basis verification response pursuant to 10CFR50.54(f).

j

}

f This Month Yr.-To-Date Cumulative

13. Hours in Reporting Period 744.0 3647.0 222119.0
13. Number Of Hours Reactor Was Critical 0.0 0.0 170529.9
14. Reactor Reserve Shutdown Hours 0.0 0.0 3283.3
15. Hours Generator On-Line 0.0 0.0 166560.7
16. Unit Reserve Shutdown Hours 0.0 0.0_

93.7

17. Gross Thermal Energy Generated (MWH) 0.0 0.0 314372827.0
18. Gross Electrical Energy Generated (MWH) 0.0 0.0 105938737.0
19. Net Electrical Energy Generated (MWH)

-1956.0

-11695.0 101058256.0

20. Unit Service Factor 0.0 0.0 74.7
21. Unit Availability Factor 0.0 0.0 74.8
22. Unit Capacity Factor (Using MDC Net)

-0.4

-3.5 69.3

23. Unit Capacity Factor (Using DER Net)

-0.4

-0.5 68.7

24. Unit Forced Outage Rate
  • 100.0
  • 100.0
  • 13.5 25, Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

' Shutdown for 10CFR50.54F at time of this report

26. If Unit Shutdown At End Of Report Period, Estimated Date of Startup:

To be determined

37. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 9612200100 961216"'

PDR ADOCK 05000245 R

pm

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-245 UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newbumb 7

TELEPHONE (8601-444-5730 REPORT MONTH: May 1996 2

No.

Date Type' Duration Reason Method of License Syste Component Cause & Corrective Code,m Code" Action to l

(Hours)

Shutting Event Down Reactor' Report #

Prevent Recurrence l

95-10E 951213 F

744 D

4 N/A N/A N/A NRC Category 11 facility; f

design basis verification for response to NRC pursuant to 10CFR50.54(f).

f RFO activities continue.

i

?

I i

I Reason

' Method

' F: Forced 2

S: Scheduled A - Equipment Failure (Explain) 1 Manual

" Recommended Practices B - Mainteneance or Test 2 - Manual Scram for System identification in

[

C - Refueling 3 - Automatic Scram Nuclear Power Plants and D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities

  • l E - Operator Training & License Examination 5 - Power Reduction (Duration = 0) 5 F-Administrative 6 - Other (Explain)

IEEE Standard 803A-1983, t

G - Operational Error (Explain)

  • Recommended Practices H - Other (Explain) for Unique identification in i

Power Plants and Related Facilities - Component i

Function Identifiers" j

i I

l m

,-.--..%-..-,e-e.

,r:.e.s.

  • -.v-.

.-me.,c.---.....-.-r._

_ _ _.. -..~,

~.e e -,

.