OPERATING DATA REPORT UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newburgh TELEPHONE (860) 444-5730 OPERATING STATUS
- 1. Docket Number 50-245
- 2. Reporting Period May 1996 Notes:
- 3. Utility Contact G. Newburgh_
' Corrected on 12/12/96 to
- 4. Licensed Thermal Power (MWt):
2011_
reflect Forced Outage
- 5. Nameplate Rating (Gross MWe):
662 beginning 12/13/95 @ 0000
- 6. Design Electrical Rating (Net MWe):
670 G60 due to 10CFR50.54(f) letter
- 7. Maximum Dependable Capacity (Gross MWe):
- 8. Maximum Dependable Capacity (Net MWe):
641
- 9. If Changes Occur in Capacity Ratings (items Number 4 Through 8) Since Last RVort, Give Reasons:
N/A
- 10. Power Level To Which Restricted, If any (Net MWe):
0
- 11. Reasons For Restrictions,if Any:
NRC Category 11 Facility; design basis verification response pursuant to 10CFR50.54(f).
j
}
f This Month Yr.-To-Date Cumulative
- 13. Hours in Reporting Period 744.0 3647.0 222119.0
- 13. Number Of Hours Reactor Was Critical 0.0 0.0 170529.9
- 14. Reactor Reserve Shutdown Hours 0.0 0.0 3283.3
- 15. Hours Generator On-Line 0.0 0.0 166560.7
- 16. Unit Reserve Shutdown Hours 0.0 0.0_
93.7
- 17. Gross Thermal Energy Generated (MWH) 0.0 0.0 314372827.0
- 18. Gross Electrical Energy Generated (MWH) 0.0 0.0 105938737.0
- 19. Net Electrical Energy Generated (MWH)
-1956.0
-11695.0 101058256.0
- 20. Unit Service Factor 0.0 0.0 74.7
- 21. Unit Availability Factor 0.0 0.0 74.8
- 22. Unit Capacity Factor (Using MDC Net)
-0.4
-3.5 69.3
- 23. Unit Capacity Factor (Using DER Net)
-0.4
-0.5 68.7
- 24. Unit Forced Outage Rate
- 100.0
- 100.0
- 13.5 25, Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
' Shutdown for 10CFR50.54F at time of this report
- 26. If Unit Shutdown At End Of Report Period, Estimated Date of Startup:
To be determined
- 37. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 9612200100 961216"'
PDR ADOCK 05000245 R
pm
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-245 UNIT NAME Millstone Unit 1 DATE 12/12/96 COMPLETED BY G. Newbumb 7
TELEPHONE (8601-444-5730 REPORT MONTH: May 1996 2
No.
Date Type' Duration Reason Method of License Syste Component Cause & Corrective Code,m Code" Action to l
(Hours)
Shutting Event Down Reactor' Report #
Prevent Recurrence l
95-10E 951213 F
744 D
4 N/A N/A N/A NRC Category 11 facility; f
design basis verification for response to NRC pursuant to 10CFR50.54(f).
f RFO activities continue.
i
?
I i
I Reason
' Method
' F: Forced 2
S: Scheduled A - Equipment Failure (Explain) 1 Manual
" Recommended Practices B - Mainteneance or Test 2 - Manual Scram for System identification in
[
C - Refueling 3 - Automatic Scram Nuclear Power Plants and D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities
- l E - Operator Training & License Examination 5 - Power Reduction (Duration = 0) 5 F-Administrative 6 - Other (Explain)
IEEE Standard 803A-1983, t
G - Operational Error (Explain)
- Recommended Practices H - Other (Explain) for Unique identification in i
Power Plants and Related Facilities - Component i
Function Identifiers" j
i I
l m
,-.--..%-..-,e-e.
,r:.e.s.
- -.v-.
.-me.,c.---.....-.-r._
_ _ _.. -..~,
~.e e -,
.