, -- . .. . . ~. ,- . ,..- --. . . _ . . _ _ _ . . _ - . . - . . - . _ - .
- , */,
hpc Ferry Rd. (Route 1*>6), Weterford, CT 06385 Nuclear Energy uiti,ioo, Nociear power station Northeast Nuclear Faergy Company i' P.O. km 128 Waterford, CT 06385-0128 (860) 447-1791 Fax (860) 444-4277
'ne Northeast Utihties System JAN - 71999 Docket No. 50-336 B17617 Re: 10CFR50.71(a)
- U.S. Nuclear Regulatory Commission Attention: Dccument Control Desk 1 Washington, DC 20555 l
Millstone Nuclear Power Station, Unit No. 2 Facility Operating License No DPR-65
(, Monthlv Ooerating Reoort t
[- In- accordance with the reporting requirements of Technical Specification Section 6.9.1.7 for Millstone Unit No. 2, enclosed, in Attachment 1, is the monthly operating report for the month of December 1998.
1 There are no regulatory commitments contained within this letter. j Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY l i
1 s l A
,]120o J, /L. Gice
!l '
A 6 981231
._R K oSo Dirpr, Millstone Unit No. 2 j V -
.>i 4-cc: H. J. Miller, Region i Administrator
. D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2
/hl y ,
S. Dembek, NRC Project Manager, Millstone Unit No. 2 063422-5 REY.12-95 l'. _ . . . . - _ _
. ~ . ... . . . .-... - ... . ... . - . _ - . . . . - - ~ - - . . . - . . - . . ..-- - . .
I i
Docket No. 50-336 B17617 i
I t
f i
e I
i i
i I
Attachment 1 l Millstone Nuclear Power Station, Unit No. 2 .
Facility Operating License No. DPR-65 :
Monthly Operating Report l i
l-Januaiy 1999 G
S
r
. O.S. Nuclear Regulatory Commission !
B17617\ Attachment 1\Page 1 -
AVERAGE DAILY UNIT POWER LEVEL i l DOCKET NO: 50-336 i UNIT: Millstone Unit 2 DATE: 01/01/99 :
COMPLETED BY: S. Stark
- TELEPHONE: (860) 447-1791 EXT: 4419 i L MONTH: December 1998 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL !
(MWe-Net) (MWe-Net) j l
1 0 17 O l i
2 0 18 0 ;
3 0 19 0 :
! 4 ~O 20 0 5 0 21 0 ,
6 0 22 O i I
7 0 -23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0
!. 12 0 28 0 i 13 0 29 0 14 0 30 0 15 0 31 O I 1
O ]
1 l
l INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each l.
dry in the reporting month. Compute to the nearest whole megawatt.
l l !
. U.S. Nuclear Regulatory Commission B17617\ Attachment 1\Page 2 OPERATING DATA REPORT UNIT NAME: Millstone Unit 2 DATE: 01/01/99 COMPLETED BY: S. Stark TELEPHONE: (860)447-1791 EXT: 4419 OPERATING STATUS
- 1. Docket Number 50-336
- 2. Reporting Period December 1998 Notes: ltems 22 and 23
- 3. Utility Contact S. Stark cumulative are weighted
- 4. Licensed Thermal Power (MWt): 2700 averages. Unit operated at
- 5. Nameplate Rating (Gross MWe): 909 2560 MWTH prior to its
- 6. Design Electrical Rating (Net MWe): 870 uprating to its current
- 7. Maximum Dependable Capacity (Gross MWe): 901.63 2700 MWTH power level.
- 8. Maximum Dependable Capacity (Net MWe): 870.63
- 9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:
N/A
- 10. Power Level To Which Restricted, if any (Net MWe): 0
- 11. Reasons For Restrictions, if Any: NRC Category 111 Facility: NRC Confirmatory Order requiring implementation of an independent corrective action verificati'an program; NRC order requiring a third-party review of the employee concerns program at Millstone 2; design rasis verification response pursuant to 10CFR50.54(f).
This Month Yr.-To-Date Cumulative
- 12. Hours in Reporting Period 744.0 8760.0 201768.0
- 13. Number Of Hours Reactor Was Critical 0.0 0.0 121911.7
- 14. Reactor Reserve Shutdown Hours 0.0 0.0 2205.5
- 15. Hours Generator On-Line 0.0 0.0 116611.9
- 16. Unit Reserve Shutdown Hours 0.0 0.0 468.2
- 17. Gross Thermal Energy Generated (MWH) 0.0 0.0 300862506.4
- 18. Gross Electrical Energy Generated (MWH) 0.0 0.0 98709460.0
- 19. Net Electrical Energy Generated (MWH) -2043.9 -21392.5 94597697.7
- 20. Unit Service Factor 0.0 0.0 57.8
- 21. Unit Availability Factor 0.0 0.0 58.0
- 22. Unit Capacity Factor (Using MDC Net) 0.0 0.0 54.7
- 23. Unit Capacity Factor (Using DER Net) 0.0 0.0 54.0
- 24. Unit Forced Outage Rate 100.0 100.0 28.0
- 25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Shutdown at the time of this report l 26. If Unit Shutdown At End Of heport Period, Estimated Date of Startup: March 1999
- 27. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
swa U.S. Nuclear Regulatory Commission
B17617%ttachment 1\Page 3 UNIT SHUTDOWNS AND POWER REDUCTIONS '
DOCKET NO: 50-336 UNIT NAME: Millstone Unit 2 ,
DATE: 01/01/99 COMPLETED BY: S. Stark TELEPHONE: (860) 447-1791 EXT: 4419 REPORT MONTH: December 1998 No. Date Type' Duration Reason
- Method of License System Component Cause & Corrective (Hours) Shutting Event Code' Code' Action to Down Reactor 3 Report #
Prevent Recurrence 98-01 03/07/96 S/F 744 B/D 4 N/A N/A N/A Scheduled: Continued n id cycle surveillance testing from previous month.
Forced: Continued from previous month. NRC Category til facility; NRC Confirmatory Order requiring independent corrective action verification; NRC order requiring third party review of Millstone Station employee concems program; design basis verification for response to NRC pursuant to 10CFR50.54(fl.
'F: Forced Reason ' Method S: Scheduled 'IEEE Standard 805-1984, A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test " Recommended Practices 2 - Manual Scram for System identification in C - Refueling 3 - Automatic Scram D - Regulatory Restriction Nuclear Power Plants and 4 - Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0)
F - Administrative 6 - Other (Explain)
G - Operational Error (Explain) 'IEEE Standard 803A-1983.
H - Other (Explain) " Recommended Practices for Unique identification in Power Plants and Related Facilities - Component Function Identifiers"
1
, U.S. Notclerr Regulatory Commission i e
B17617\ Attachment 1\ Pag 3 4 REFUEUNG INFORMATION REQUEST
- 1. Name of the facility: Millstone Unit 2
- 2. Scheduled date for next refueling outage: Second Quarter of 2000 l l
- 3. Scheduled date for restart following refueling: First Quarter of 1999 (Note -The I current shutdown is not a refueling outage. This date reoresents the exnected startuo date from the current shutdown.)
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? :
Yes. There are 28 Technical Soecification Change Reauests or license amendments I which are reauired to be sooroved bv the NRC orior to startuo. As of Januarv 5. )
1999.26 reauests have been sent to the NRC.14 have been anoroved. and 12 have I been imolemented. The 2 remainina T.S. changes to be submitted are: 1) Hvdroaen Purae. and 2) EBFS Bvoass Leakaa_ e.
- 5. Scheduled date(s) for submitting licensing action and supporting information:
Januarv 15.1999
- 6. Important licensing considerations associated with refueling, e.g., new or different l
fuel design or supplier, unreviewed design or performance analysis methods, l significant changes in fuel design, new operating procedures: Small Break LOCA analvsis changes and large Break LOCA analvsis changes.
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
In Core: (a) _L in Spent Fuel Pool: (b) 1084 l l
NOTE: These numbers reoresent the total Fuel Assemblies and Consolidated -
Fuel Storage Boxes (3 total containina the fuel rods from 6 fuel assemblies) in these two (2) Item Control Areas. l
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Present storage caoacitv: 1306 storage locations
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool j assuming present license capacity:
l 2002. Soent Fuel Pool Full. Core offload caoacity is reached.
2006. Core Full. Soent Fuel Pool Full.
l l