MONTHYEARML20236N3451987-10-31031 October 1987 Monthly Operating Rept for Oct 1987 ML20235V1161987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 ML20238F7541987-08-31031 August 1987 Monthly Operating Rept for Aug 1987 ML20237H6861987-07-31031 July 1987 Monthly Operating Rept for Jul 1987 ML20235J3101987-06-30030 June 1987 Monthly Operating Rept for June 1987 ML20215A3211987-05-31031 May 1987 Monthly Operating Rept for May 1987 ML20213G4341987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20206H4301987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20207R6091987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 ML20211A1761987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20207M8271986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 ML20211M0441986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20213F2231986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20207F6021986-09-30030 September 1986 Monthly Operating Rept for Sept 1986 ML20210C8931986-08-31031 August 1986 Monthly Operating Rept for Aug 1986 ML20212F5161986-07-31031 July 1986 Monthly Operating Rept for Jul 1986 ML20202G9981986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20211E1391986-05-31031 May 1986 Monthly Operating Rept for May 1986 ML20197D1581986-04-30030 April 1986 Monthly Operating Rept for Apr 1986 ML20203A5751986-03-31031 March 1986 Monthly Operating Rept for Mar 1986 ML20154M3421986-02-28028 February 1986 Monthly Operating Rept for Feb 1986 ML20214B7281986-01-31031 January 1986 Monthly Operating Rept for Jan 1986 ML20137C3581985-12-31031 December 1985 Monthly Operating Rept for Dec 1985 ML20138D5051985-11-30030 November 1985 Monthly Operating Rept for Nov 1985 ML20138R8561985-10-31031 October 1985 Monthly Operating Rept for Oct 1985 ML20138B6491985-09-30030 September 1985 Monthly Operating Rept for Sept 1985 ML20135G0591985-08-31031 August 1985 Monthly Operating Rept for Aug 1985 ML20133Q1701985-07-31031 July 1985 Monthly Operating Rept for Jul 1985 ML20132G1211985-06-30030 June 1985 Monthly Operating Rept for June 1985 ML20127A1101985-05-31031 May 1985 Monthly Operating Rept for May 1985 ML20127M0441985-04-30030 April 1985 Monthly Operating Rept for Apr 1985 ML20115H3501985-03-31031 March 1985 Monthly Operating Rept for Mar 1985 ML20099J4281985-02-28028 February 1985 Monthly Operating Rept for Feb 1985 ML20106G2981985-01-31031 January 1985 Monthly Operating Rept for Jan 1985 ML20112G9941984-12-31031 December 1984 Monthly Operating Rept for Dec 1984 ML20100Q2961984-11-30030 November 1984 Monthly Operating Rept for Nov 1984 ML20099B8981984-10-31031 October 1984 Monthly Operating Rept for Oct 1984 ML20097H9321984-08-31031 August 1984 Monthly Operating Rept for Aug 1984 ML20094N4261984-07-31031 July 1984 Monthly Operating Rept for Jul 1984 ML20093D0701984-06-30030 June 1984 Monthly Operating Rept for June 1984 ML20092G6171984-05-31031 May 1984 Monthly Operating Rept for May 1984 ML20084M4201984-04-30030 April 1984 Monthly Operating Rept for Apr 1984 ML20083K3761984-03-31031 March 1984 Monthly Operating Rept for Mar 1984 ML20087C7141984-02-29029 February 1984 Monthly Operating Rept for Feb 1984 ML20080H1031984-01-31031 January 1984 Monthly Operating Rept for Jan 1984 ML20083H9791983-12-31031 December 1983 Monthly Operating Rept for Dec 1983 ML20082R5131983-12-0101 December 1983 Monthly Operating Rept for Nov 1983 ML20081L2911983-11-0101 November 1983 Monthly Operating Rept for Oct 1983 ML20080R0711983-09-30030 September 1983 Monthly Operating Rept for Sept 1983 ML20077P0591983-09-0909 September 1983 Monthly Operating Rept for Aug 1983 1987-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20140E9181997-06-0707 June 1997 Safety Evaluation Supporting Amend 133 to License DPR-43 ML20115J3981996-07-22022 July 1996 Interim Part 21 Rept Re 3/4 Schedule 80 Pipe Furnished to Consolidated Power Supply.Investigation Revealed Only One Nuclear Customer Involved in Sale of Matl ML20126J5961992-12-31031 December 1992 Part 21 Rept Re Potential Loss of RHR Cooling During Nozzle Dam Removal.Nozzle Dams May Create Trapped Air Column Behind Cold Leg Nozzle Dam.Mod to Nozzle Dams Currently Underway. Ltrs to Affected Utils Encl ML20113H4871992-07-30030 July 1992 Part 21 Rept Re Surge Line Flooding Which May Occur When Large Pressurizer Vent Used to Support Reduced Rc Inventory Operations.Notification Received from Westinghouse on 920312.Item Not Reportable Per 10CFR21 ML20086U0311991-11-30030 November 1991 SG Tube Plugging Criteria for Outside Diameter Stress Corrosion Cracking (ODSCC) at Tube Support Plates ML20077K0831991-06-30030 June 1991 Nonproprietary Technical Justification for Eliminating Pressurizer Surge Line Rupture as Structural Design Basis for Kewaunee Nuclear Plant ML1118102861991-05-31031 May 1991 Handbook on Flaw Evaluation Kewaunee,Unit 1 Steam Generators Upper Shell to Cone Weld. ML20091E3441991-03-31031 March 1991 Nonproprietary Structural Evaluation of Kewaunee Pressurizer Surge Line,Considering Effects of Thermal Stratification ML20066B2101990-12-31031 December 1990 Generator Mid-Cycle Rept,Dec 1990 ML20062A4641990-09-30030 September 1990 Nonproprietary, Reevaluation of U-Bend Tube Fatique for Kewaunee Plant Steam Generators ML20042F3261990-05-0404 May 1990 LER 90-005-00:on 900404,intergranular Attack & IGSCC Results in Both Steam Generators a & B Being Categorized as C-3.All Defective Tubes Plugged & Sludge Lancing & Crevice Flushing conducted.W/900504 Ltr ML1117803551990-04-30030 April 1990 Generator Tubesheet Crevice Indications Return to Power Rept. ML20005G6831990-01-0505 January 1990 Part 21 Rept Re Installation Instructions for Grommet Use Range for Patel Conduit Seal P/N 841206.Conduit Seals in Environ Qualification Applications Inspected for Proper Wire Use Range & Grommets Replaced ML19354D8351989-11-0808 November 1989 Presentation to NRC Re Kewaunee (Wps) SECY-83-472 LOCA Analysis Effort. ML20247D3011989-07-12012 July 1989 Part 21 Rept 10CFR21-0047 Re Control Wiring Insulation of Inner Jacket Used on General Motors Diesel Generator Sets Identified as 999 or MP Series.Encl List of Owners of Units Notified ML20235J1941988-11-30030 November 1988 Analysis of Capsule P from Wisconsin Public Svc Corp Kewaunee Nuclear Plant Reactor Vessel Radiation Surveillance Program ML20207N4641988-10-12012 October 1988 Part 21 Rept Re Potential Problem W/Emd 20-645E4,Type 999 Excitation Sys Circuit Breaker & Wiring.Potential for Field Circuit Breaker to Trip Due to Combined Air Temps & Field Current Exists at All Plants W/Model 999 Sys ML20206E9801988-06-30030 June 1988 Rev 2 to Handbook on Flaw Evaluation,Kewaunee Unit 1 Steam Generators Upper Shell to Cone Weld ML20196G5251988-06-15015 June 1988 Technical Review Rept T809, Blocked Thimble Tubes/Stuck Incore Detector ML20154H0391988-04-30030 April 1988 Slide Presentation Matl,Nrc Meeting 880331,Kewaunee Nuclear Power Plant Steam Generator Tube Sleeve Installation ML20196G8881988-03-0303 March 1988 Headquarters Daily Rept for 880303 ML20147B2921987-12-31031 December 1987 Annual Operating Rept for 1987 ML20149J0261987-12-21021 December 1987 Part 21 Rept Re Installation of Relay Part B8002DN in Foxboro 62H Controllers in Facilities.Subj Relay Must Be Replaced by Relay Part N0196ZN.Relay B8002DN Not Used in Any Other Plants ML20236W7341987-11-30030 November 1987 Nonproprietary Kewaunee Steam Generator Sleeving Rept (Mechanical Sleeves) ML20236F3101987-10-31031 October 1987 Nonproprietary WCAP-11620, Addl Technical Bases for Eliminating Large Primary Loop Pipe Rupture as Structural Design Basis for Kewaunee ML20236N3451987-10-31031 October 1987 Monthly Operating Rept for Oct 1987 ML20235V1161987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 ML20238F7541987-08-31031 August 1987 Monthly Operating Rept for Aug 1987 ML20237H6861987-07-31031 July 1987 Monthly Operating Rept for Jul 1987 ML20235J3101987-06-30030 June 1987 Monthly Operating Rept for June 1987 ML17261A5301987-06-18018 June 1987 Part 21 Rept Re Potential Util Failure to Comply W/Component Containment Isolation Licensing Commitment If Proposed Mods to Component Cooling Water Sys Instituted.Utils Advised to Evaluate Containment Isolation Sys ML20215A3211987-05-31031 May 1987 Monthly Operating Rept for May 1987 ML20215L8061987-04-30030 April 1987 Nonproprietary Rev 1 to Technical Bases for Eliminating Large Pipe Rupture as Structural Design Basis for Kewaunee ML20213G4341987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20206H4301987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20207R6091987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 ML20211P7211987-02-23023 February 1987 Part 21 Rept Re Rockbestos Coaxial Cable Used in Sorrento Electronics Digital & Analog high-range Radiation Monitor. Insulation Resistance at High Temp Not High Enough for Ion Chamber & Associated Electronics to Operate Properly ML20211A1761987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20212B9451986-12-31031 December 1986 Reload Safety Evaluation,Kewaunee Cycle 13 ML20207M8271986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 ML20212F4301986-12-31031 December 1986 Annual Operating Rept,1986 ML20212F6581986-12-31031 December 1986 Technical Review Rept, Degradation of Safety Sys Due to Component Misalignment &/Or Mispositioned Control/Selector Switches ML20212D9091986-12-23023 December 1986 Localized Rod Cluster Control Assembly (Rcca) Wear at PWR Plants, Engineering Evaluation Rept ML20211M0441986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20213F2231986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20207F6021986-09-30030 September 1986 Monthly Operating Rept for Sept 1986 ML20210C8931986-08-31031 August 1986 Monthly Operating Rept for Aug 1986 ML20212F5161986-07-31031 July 1986 Monthly Operating Rept for Jul 1986 ML20202G9981986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20211E1391986-05-31031 May 1986 Monthly Operating Rept for May 1986 1997-06-07
[Table view] |
Text
.
DOCKET 50-305 KEWAUNEE NUCLEAR POWEB PLANT
SUMMARY
OF OPERATING EXPERIENCE December, 1982 GPER A TIO NS: On December 6, load was decreased to 50% to remove FWP 1A from service to inspect a noisy speed
- increaser. The monthly turbine stop valve operability test was also completed. FWP 1A was returned to service on December 8, and generation was increased to 100%.
On Monday, December 27, a leak in an elbow on the drain line from MSR 1B1 to the Heater Drain Tank forced a manual trip of the turbine..The unit was returned to service on December 28.
l
, On Thursday, December 30, a leak in an elbow on l !( M M $iM3fA M @ 2N5$the HSR 1B1 drain to FWH 15B forced a reduction to 50% power to remove the F WH from service. .Later the same day, the unit was returned to 100% power
, and FWH 15B was put back in service.
l M AINT EN A NCE: Replaced
- a defective Holdup Tank level transmitter. .
Replaced a defective Shield Building Vent damper controller.
Overhauled a Service Water Pump motor.
Overhauled a Charging Pump.
8303080166 830110
[. PDR ADOCK 05000305 l R PDR l
g + t% e
AV ER AGE DAIL Y UNIT POW ER LEY EL DOCKET No- 50-305 UNIT- KEWAUNEE COMPLETED BY- G. H. RUITER T EL EP HO NE- 414-388-2560 X225 REPOET MONTH DECEMEER, 1982 AVERAGE DAILY DAY POWER LEVEL (5 W E-N ET) 1 313 2 513 3 513 4 513 5 518 6 370
- 7 235 8 292 9 509 10 513 11 513 12 513 13 518 14 514 15 514 16 514 .
.. 17 513
?YYYEE&Ylkl*Wh55$4SEb!5Nb~$N:<CANI 18 514 19 514 20 509 21 514 22 514
- 23 509 l 24 513 l 25 435 l 26 439 .
l 27 218 l 28 14 29 234 30 397 31 509 I i #
, , _ _ {,-
G . <, , J
, u n as
.a
- D'N I T S H U T D Or N'/ N S AND PO9ER REDUCTION 5 f- '
DOCKET NO: 50-305
~
)
f(
5 UNIT NAME: Ke ua unee L #6 DATE: January 3, 1983 j j COM P LET ED RT: G. H. Puiter o n. TELEPHONE: 414-388-2560 x225 N fb d bi 4 REPORT3 MONTH - DECEMDER, 1982 g, X
5
'l NO. l DATE } TYPE }DURATIONIREASONl METHOD l LER NUMBER lSYS I CORPONENT l COMMENTS l 1 : : : : : : : : : I b I I I I I . I 1 & I I I I 3 1 7 112/ 6/821 S' I 0. 0 i B l 5 i N/A / I CH I MECTU N I 7. A load reduction to 50% power was taken for I I i i i I I I i l i repair of Feedvater Pump la speed increaser 1 b I I I I I l 1 I l I couplings. . I g i I I i 1 1 I ' I I I I I 8 112/27/82 l .F l 33.7 l A I 2 1 N/A! I HJ l PIPEXX l 8. The reactor and turbine were manually tripped I b I I I I I 1 l l 1 i due to a stream leak is a line tetween a i g i I I I I I I I I I moisture separator and the heater drain tank. I I I I I i i i i i 1 l
L I 9 112/30/821 F I 0. 0 l A I 5 1 N/A 1 HJ l PIPEII I 9. A load reduction to 525 power was taken for i g i I I I I I I I i 1 repair of a leak in a 4-inch steam line at i I I I I I I I I I I Feedvater Heater 15B. . I L 1 l I I I I i 1 1 I . I g 1 1 I I I I I I I i 1 1 I I l l l l 1 1 3 I I V 1 1 I I I I I I I I
- I j 1 1 I I I I I I I i 5 I
I I I I I I I I I I I 4 I I i 1 1 1 I I i 1 5 I J l i I I I I I I i l l I I i 1 1 I I I I I i V i l i i 1 1 I I I I I J l i I I I I I I I I i
- 1. I l i I I I I I I I L 1 1 I I I I I I I I l J l i I I I i 1 1 I I I I I I I I I i l I I I V I I I I I I I I I i 1 j l .I I I I I i i i i i I I I I I I I I I I i
~' ! 8 8
J C TYPE S E AS ON HETHOD SYSTEM & COMPONENT CODES g F: Forced A-Equipment Failure (Explain) 1-Manual From NUREG-0161
.l V S: Scheduled E-Maintenance or Test 2-Manual Scras g C-Re f ueling 3- Automat ic Scran D-Regulatory Restriction 4-Continuatisns V E-Operator Training & License Examination S-toad Reductions j F-Administrative 9-Other G-Operational Error (Explain) v li-Ot h e r (Explain) J Q 1.: My,t.{tf(jgg.
{,jj } ,,
ijg5g.$g {
3 :
g .; (g .
.p. ;
- p , ,
OPZR ATIN G D A TIA REPORT
% li; 3 DOCKET No- 50-305 *
[% v' COMPLETED BY- G. H. RUITER L 0PER ATING STATUS kf? TELEPHONE- 414-388-2560 1225 -
.J .
g L 1 UNIT NAMR FEWAUNEE he********************************************** g ye .
2 REPORTING PERIOC DECEMBER, 1982 TA *
- 3 LICENSED THERM AL POW ER (MWT) 1650 .Y
- The unit outage described in the Unit
- i* Shutdown Report ended a run of
- b 4 NAMIPLATE RATING (CROSS MWE) 560 {*
w*
continuous operation at 216 days. , o g
5 DESIGN ELECTRICAL RATING (WET FWE) 535 9*
f* e q 6 MAIIMUM DEPEND AELE CAPACITY (GROSS MWE) 542 s* *
?*
- b 7 MAIIMUM DEPLif DAELE CAPACITY (N ET M E E) 514 (********************************************** 3 8 IF CHANGES OCCUR IN CAP ACITY PATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS V MDC(net) an d MDC (gross) were updated based on the winter capacity test. , j V 9 POWER LEVEL To tiHICH RESTRICTED, IF ANY (NET MWE) None g 10 REASCNS FOR B ESTRICTIONS, IF ANI .
G n J V TH MON 1H YR-TO-DATE COMULATIYE g i
11 HOURS IN REPOETING PERIOD 744 8760 *74905 L 4 g 12 NU MBER OF HOURS REACTOR WAS CRITICAL 733.3 7749.7 63751.6 L 13 REACTOR RESERVE SHUTDOWN BOURS 0. 0 0. 0 2330.5 .
g 14 HOU RS G ENER ATOR ON-LINE 710.3 7669.8 62476.6 15 UNIT RESERVE SUTDOWN HOURS 0. 0 0. 0 10.0 y 16 GROSS THERM AL ENERGY GENERATED (MWH) 1077471 12293067 97100001 J 17 GROSS ELECTRICAL ENERGY GENER ATED (Mus) 350800 4015200 31967600 18 NET ELECTPICAL ENERGY GENERATED (M W R) 334042 3824851 30425108 y 19 UNIT SERVICE FACTOR 95.5 87.6 83.4 g 20 UNIT AVAILABILITY F ACTOR
- 95.5 87.6 83.4 21 UNIT CAPACITY FACTOR (ft,ING MDC WET) 87.4 84.9 7 7.'J V 22 UNIT CAPACITY FACTOR (U:.ING DER NET) 83.9 81.6 75.9 g 23 UNIT F3RCED OUTAGE RATE 4. 5 0. 5 4. 3 24 SHUTDOWNS SCPEDULED OVEI: NEXT 6 MONTHS (TYPE, DATE, AND DUR ATION OF EACH)
Eefueling shutdown of 8-week duration is scheduled to start on March 20, 1983..
-L g 25 IF SHUT DOWN AT END .0F REPORT PERIOD, ESTIM ATED DATE OF STARTUP - N/A f