DCCKET 50-305 KEWAUNEE NUCLEAR POWER PLANT SUMMAPY CF OPERATING EXPERIENCE June, 1986 CPERATIONS: On June 15, unit load was reduced to 387 MWR Gross for performance of the monthly Turbine Stop and Centrol Valve test. The unit was returned to full power the same day.

MAINTENANCE: Peplaced a Radiation Monitor power supply.

Peplaced an Engineered Safeguards relay.

Corrected Letdown Heat Exchanger temperature control problem.

Cospleted several Appendix F upgrades.

Load tested the Spent Fuel Rack Lifting Pig in anticipaticn of upcosing rack receipt and installaticn.

t

-)

06071 PDR hh p

.A V ,E R AG E DA IL Y U 4 IT POW ER LEVEL DOCFET NC- 50-305 UNIT- KEWAGNEE COMPLETEC BY- G. H. RUITER TELEPHCNE- 414-388-2560 X225 REPORT MONTH JUNE, 1986 AVER AGE E AILY DAY PCWER LEVEL (M N E- N E T )

f 1 524 2 528 3 524 4 528 5 524 6 528 7 524 8 528 9 524 10 524 11 528 12 524

' 13 524 14 524 15 499 16 524 17 528 6

18 524 19 524 20 528 21 524 22 524

23 524 1

24 524 25 524 26 524

! 27 529 28 524

) 29 524 30 524

.i 1

I 1

3; R

, '?-

f. S 5 NIT \

S R D T D O 9,5 S AND F0W ER RIODCTIONS

'?

. w t.

COCKET NO: 5C-3C*

  • ONIT NAME: Revaunee

\' DATE: July 1, 1926 m

,' COMPLETED BT G. H. Ruiter TELEPHONE: 414-388-2560 m225 BEPORT MONTH - JUNE, 1986 m

} N0. ll D&TE ITYPE}DDRATICN}REASCIBMITHODlLERNDMBER }SYS l COMPOBE51 l CCMMENTS l l l l l l l l

l l I I I I I I I I I I 1

i I I I I I I m 1 I I I No shutdowns or power reductions in June.

I I I I I I

  • I '

I I I 1

I I I I I I I I I I I I I i I I I I I m I I I I I I I I I I I I I i i I I I I I I I i

I I I I I i I I I s, 1 I I I I I I I I I I I I I I I I I I I I I I I I

I I i I I I I I I I I I m

I I I I I I I I I I I I I I I I I I I I I I i I I I I I I m I I I I m I I I I I I I I I I I I i I I I I I I I i

I I I I I I I I I I 3 I I I I I I I I I I I

I I I I I I I I I I I I I

i I I I I I I I I I I m I I I I I I I I I I I l I I I I I I I I I I

l i I I I I I I I I

  • I ~

I I i 1 1 1 I I I I I

i 1 1 1 I I I I I I i I i 1 1 I I I I I I ,

I I I I I I I I I I I I

I I I I I I I I I I I I I I I I I I I -

I I i 1 I i 1 1 I I I I I 1

l

!  !  !  !  !  !  !  !  !  ! I -

J TYPE BEASOE

  • METHCD

, SYSTEM & COMP 05I51 CCDES s F: Forced A-Equipment Failure (Explain) 1-Manual S: Scheduled From NUBEG-0161 E-Maintenance or 1est 2-Manual Scras C-Refueling 3-Automatic Scran 3 D-Regulatory Restrictica 4-Continuations E-Operator Training 5 License Exaalaation 5-toad Beductions P-Administrative 9-Other 3 G-operational Error (Explaia)

M-Other (fxplata) -

OPEEATIEG DATA BEPQRT ,

U , . DOCERT so- 50-305 '

d-3 0PER ATIEG d- (. CORPLI1ED Bt- G. B. BUI1ER g l.5 STATU S '

TELEPHONE- 414-388-2560 I225 S N,

.;;; i U IT .AaE E 1a:EE .****.*********.......*.....*.*****...*..*.*.* ,

~

4 2 BEFORTIBG PERIOD JUEE, 1986

  • NOTES
  • 3 LICEsSED THERN AL POWEt (ENT) 1650
  • Normal power operation continued
  • b, ,
  • through this reporting period. *

!g - 4 EastPLATE B ATInc (GBCSS aut) 560 *

  • S N 5 DESIGE ELECTRICAL RATIEG (NET MBE) 535 *
  • g . .

E 6 MAIIEUR DEPEEDABLE CAPACITY (G8 CSS RWE) 529 * * '

7 s&EIsOM DEPENDA312 CAPACITY (BET 55E) 503 **********************************************

8 IF CHANGES OCCOR IN CAPACITY BATINGS *(ITERS.EUMBER 3 T890DGB 7) SINC E L AST BEPORT, GIVE BRASORS

,t none 9 POWER LEVEL TO 55 ICE BES1RICTIt, IF ABF (NET MUE) None ,

~

10 REASCAS FOR RES1RICTIONS, IF AIT m

THIS month YB-TO-DATE COMOLATIVE 11 80035 IB BEPORTING PERICC 720 4343 105552 12 EUMBER OF B00RS RE ACTOR BAS CBITICAL 720.0 3167.3 89184.3 13 BEACTOR RESERTE SMUTDOBB 800ss 0.0 0.0 2330.5 3 14 BOURS GEBERATOR 05-LIBE 720.0 3098.2 87653.7 15 UNIT RESERVE SOTDOBE 80095 0.0 0.0 10.Q 1's GROSS THE85 AL EBERGT GEEIRATED (REB) 1176926 49215i6 137638408 .

17 GROSS ELECTRICAL ENERGT GENEEATED (M B B) 396200 1650500 45389000

^

18 NET ELECTRICAL ENERGY GEBERATED (Mus) 377561 1573979 43215191 1D UNIT SERVICE FACTOR 100.0 71.3 83.1 3

20 UNIT AYSILABILY1! FACTOR 100.0 71.3 83.0 21 UNIT CAPACITY FACTOR (USING HEC BET),

104.3 72.1 79.2 22 05I7 CAPACITT FACTOR (USING DER BET) 98.0 67.7 76.5 3

23 UEIT FORCED OUTAGE BATE 0.0 0.9 3. 2 23 580TDO555 SCHEDOLED CTER BEIT 6 BONTHS (1TPI, DATE, AND DORATIO3 of EACH) '

Scae 25 IF SBUT DGWB AT END OF REPORT PERIOD, ESTIM ATED DATE OF STARTUP - 5/ A O

NRC-86-97 WPSC (414] 433-1234 TELEX 51010 S2698 WPSC GRB TELECOPIER(4141433-1297 EASYUNK 62891993 WISCONSW PUGUC SEmnCE CORPORATION 600 Nceth Adams + P.O. Box 19002

  • Green Bay, WI 54307-9002 July 10, 1986 Director, Office of Inspection and Enforcement Attention Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Monthly Operating Report The narrative "Sumary of Operating Experience" and completed forms covering plant and component availability for the Kewaunee Nuclear Power Plant for June 1986 are enclosed in accordance with Technical Specification 6.9.1(c).

Very truly yours, 44~/s

0. C. Hintz Manager - Nuclear Power WRC/jms Enc.

cc - Mr. J. G. Keppler, Reg Adm US NRC - Region III Mr. Robert Nelson, NRC Sr Resident Inspector RR #1, Box 999, Kewaunee, WI 54216 Mr. George Lear, PWR Project Directorate-1 US NRC, Washington, DC 20555 INP0 Records Center, Suite 1500, 1100 Circle 75 Parkway, i Atlanta, GA 30339 '