Monthly Operating Rept for Jul 1986
ML20212F516
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 07/31/1986
From: Hintz D, Ruiter G
WISCONSIN PUBLIC SERVICE CORP.
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
CON-NRC-86-110 NUDOCS 8608130335
Download: ML20212F516 (5)


Text

- - _ _ __ _ ______________

o .

i I

I DOCKET 50-305 l KEWAUNEE NUCLEAR POWEB PLANT

SUMMARY

OF OPERATING EXPERIENCE July, 1986 OPERATIONS: On July 14, unit load vac reduced to 390 MWE Gross for performance of the monthly Turbine Stop and Control Valve test. The unit was returned to full power the same day.

MAINTENANCE: Installed narrow range suction pressure indicators l on the RHR pumps.

Reset various fan coil temperature switches to maintain desired area temperatures.

Replaced a leaking valve on a Diesel Generator startup air system.

8608130335 860731

[k\\

PDR ADOCK 05000305 R PDR

AV ER AG E DA ILY UN IT POW ER LEY EL DOCKET NO- 50-305 UNIT- KEWAUNEE 1 COMPLETED BY- G. H. RUITER  !

TELEERONE- 414-388-2560 X225 l l

l REPORT MONTH JULY, 1986 I

AVERAGE DAILY DAY POWER LEVEL (MBE-5ET) 1 524 2 520 4 3 520 4 524 5 524 1 6 524 3

7 524 8 528 1 9 524

! 10 524 l

11 524 12 524 13 520 i 14 499 l 15 515 i 16 515 17 515 .

18 515 19 515 20 511 21 507 22 511 23 507 24 515 25 524 26 519 27 520 28 528

, 29 519 i 10 524 31 524

.h t

UN YT SH DTDON NS AOD POW ER R ECUCTI C N S '

DOCRET 50: SC-3C5 DNIT NAME: Etwaunee DATP: Aug1st 1, 1986 COMPLETED EY: G. h. Poiter TELEPHONE: 414-368-2560 x225 I

i REPORT MONTH - JGLY, 1986 l

F NO.: l bit P lTYrf  : lDORATIcalREASONh5ETHODlLERNUMBER lSYS lC04POWENT CCM9ENTS l l I I I I  :

I I l I 'I I I I 4 l

3 I i l l l I I-I I I I l. I I I

No shutdosas or power rydictionst. in July. I ,

I I I f I I I

  • I I I I l rN I I I I I I I I I I I I l i 1 I I I t ' I -

I ~! I I _

1 I I I I i i T f-I I i I i I

! I 1 1 I i I I 6 I I I I 1

I I I I '

I  : I 1 i I i I  ; I ;l I I I I I I I

I I I I 'l i i I I I I I I I t

I I I I '

I I I I I l i I I l .I I I I I I I I I l I I I I l I I I l I I I I I -

~ ~'

I _ I I I I I l I I I I I I I '

I I I i  :

1 I I I I I I l I l I I i 6 I

I I f I I s I I I I I I I i-I I l' l I I 1 I I I I I I I I I I I I I I I I I I I I I I -l i I I I I I I I I I I I I l i

I I i I I i I I I I I I I I I I I e I I I I I I l I I I I ' 1 I I I l I

~

l l I I I I I -

1- I 'tr I I I ~

l l I l.

I I 'l i I I l'

~

1 1 i i l I I 1 -1 l I-

.I .I I 1

_ y .I .I --__ .I .I .I I 1 I

n .

~ trPE ErkicB METRCD SYSTEM & COMPONENT CCDIS F: Forced A-Equipment Failure (Explaial 1-Ranual S: Scheduled E-Maintenance or test From EURIG-0161 C-Refueling 2-sanual Scras c-Regulatory Restriction 3-Automatic Scran E-Operator Training 6 License Examination 4-Continuations F-44ministrative 5-Load Reductions 9-Ot he r G-operational Error (Explata) 4-Other itzplain)

OPED ATIN G DATA NEPO2T DOCRET NO- 50-305 ,

0PE9 ATING CGMPLETED BY- G. R. RUITER STATUS TEIRFEONE- 414-388-2560 1225 1 UNIT NAME KENAUNFE 2 REPOPTING PEPIOD JULT, 1986

  • N01ES
  • 3 LICENSED THERMAL PONPR (RNT) 1650
  • Normal power operation continued *
  • throu9h this reporting period.
  • 4 NAMEPLATE R ATING (GROSS BWE) 560 *
  • 5 DESIGN ELECTRICAL RATING (NET HNE) 535
  • 6 MAXIMUM DEPENDABLE CAPACITY (GROSS MNE) 529 *
  • 7 MLIIMUM DEPENDABLE CAPACITY (RET HNE) 503 **********************************************

8 IF CHANGES OCCUR IN CAPACITY PATINGS (ITEMS NUMBER 3 THROUGH 7) SINCF LAST REPORT, CITE BEASONS None 9 PONER LEVEL TO NHICH RES1RICTID, IF ANT (NET HNE) None 10 REASONS FOR RESTRICTIONS. IF ANY THIS MONTH TR-To-DATE CUMULATIVE 11 BOURS IN REPORTING PERIOD 744 5087 106296 12 NUMBER OF HOURS REACTOR NAS CRITICAL 744.0 3911.3 89928.3 13 REACTOR RESERTE SMUTDONN HOURS 0.0 0.0 2330.5 14 BOURS GENERATOR OR-LINE 744.0 3842.2 88397.7 15 UNIT RESFRTE SOTDONN HOURS 0. 0 0.0 10.0 16 GROSS THERMAL ENERGY GENfRATED (RNH) 1218187 6139763 138856595 <

17 GROSS ELECTRICAL ENERGY GENERATED (M NH) 405600 2056100 45794600 18 NET ELECTRICAL INERGY GENERATED (MNH) 386122 1960101 43601313 19 UNIT SERVICE FAC10P 100.0 75.5 83.2 23 UNIT AVAILABILITY FACTOP 100.0 75.5 83.2 21 UNIT CAPACITY FACTOR (USING MDC NET) 103.2 76.6 79.3 22 04IT CAPACITY F A CTOR (USING DER NET) 97.0 72.0 16.7 23 UNIT FORCED OUTAGE RATE 0.0 0.7 3.2 23 S90TDONES SCHED9 LED OVER NEIT 6 MONTHS (TYPE, DATE, AND DUR ATION OF EACN)

None 25 IF SHUT DOWN AT EMD OF REPORT PERIOD, ESTIMATED DATF OF STARTUP - N/ A

I NRC-86-110 WPSC (414) 433-1234 TELEX 5101012698 WPSC GR8 TELECOPIER [414) 433-1297 EASYUNK 62891993 wmCONSW PUGUC SEfiIViCE _ CORPORATION 600 Nortn Adams + RO. Box 19002

  • Green Bay, WI 54307-9002 August 8, 1986 Director, Office of Inspection and Enforcement Attention Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Monthly Operating Report The narrative "Sumary of Operating Experience" and completed forms covering plant and component availability for the Kewaunee Nuclear Power Plant for July 1986 are enclosed in accordance with Technical Specification 6.9.1(c).

Very truly yours, 8

D. C. Hintz Vice President - Nuclear Power WRC/jms Enc.

cc - Mr. J. G. Keppler, Reg Adm US NRC - Region III Mr. Robert Nelson, NRC Sr Resident Inspector RR #1, Box 999, Kewaunee, WI 54216 Mr. George Lear, PWR Project Directorate-1 US NRC, Washington, DC 20555 INP0 Records Center, Suite 1500, 1100 Circle 75 Parkway, Atlanta, GA 30339

>[ \\ l 1