F .

l l ECCRET 50-305 l

l KEWAUNE! NffCLEAR POWER PLANT

SUMMARY

CF OPERATING EXPERIENCE February, 1987 (

OPERATIONS: The unit was shut down on February 24, starting the scheduled refueling outage. This outage ended the unit's second longest continuous run at 287 days.

MAINTENANCE: IEC replaced the signal conditioning card for shutdown bank cod G-11 due to unstable position indica tion, topaired a f ailed current repeater in l Steam Exclusion, renet the Pressuciter Spray controller to restore desired spray flow rate and calibrated various instrument histables.

Mechanics replaced plungern in a Charging Pusp due to increased leakage and did various refueling preparation work on the fuel transfer system.

Ficctricians reset the torque switch on a timitorque Mov, installed Pl!F Fusp cabling per Appendix P, and rewiced neveral Limitorque MOV torque bypass nwitches.

l t

I sy l 8703170440 87022e T1.,

j PDR M K osoooaos l

R PDR s\\ l

i AVERAG E DAILY UNIT POWER LEVEL DOCNET NO- 50-305 UNIT- KEWAUNEE COMPLETED BY- G. H. RUITER TELEPHONE- 414-38W-2560 X225 REPORT MONTH PEBRUARY, 1987 AVERAGE DAILY DAY POWER LEVEL (MUE-NET) 1 521 2 517 3 521 4 521 5 521 6 517 7 521 8 521 9 521 10 521 11 517 12 521 13 521 14 521 15 522 16 521 17 521 18 521 19 517 20 521 21 522 22 517 23 521 24 300 25 0 26 0 27 0 20 0

t -

OaIT SB57D0 eeS A e3 F0eEe REDDCTIC B S

  • SOCEPT SC: "C-3C5 SRIT 54RE: Besassee CATE: March 2, 1967 CCMPLETED Bt: C. E. Seiter TELEFRCBE: 414-388-256C x22*

WEPOST 50aTH - FE980RST, 1927

}

a0. h; DETF l TYPE

" IDWetTIC9hBfASCEhsFTacthLER309fES lSYS hCCRPonPa7 h CCRMENTS i I 4 I I I I I I I I I I I1 8 2/24/878 5 1 10 2. 2 I C l 1 I en i 22 I 222222 1 1. Coenenced Cycle III-IIII refueling cetage. Asl l I I I I I I I I I automatic reactor trir occorred free i I I I I I I I I I I I I

I i I I I I I soberitical condition after the sait was tateel I off time; the cause of the trig eas erratic l 8 I I I I I I I I I operation of one scarce range chamael which l I I I I I I I I I I resette4 is a high fles leset trip. I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I -I I I I I I I I I I I I I I I I I I I I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I l I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I l

,I .I I .I I.

. .I .I .I .I .I .I TYPE DEasca R ET DC E SYSTES C CCRPOWEul CCDES F: Forcel A-Equipoest Failure IExplatal 1-seesel Froe 55 BEG-0161

- 5: Schedeled E-salatemance or Test 2-eassa! Scrae C-Beleelleg 3-setonatic Scran ,

D-Regelatory Bestriction 4-Coattamations E-operatcr Training C License Examination 5-tead pedactions F- Ad min istra t l ee 1-Cther C-operational Error IFarlatal s-Ct her tEsplaint

CDE5 4TIOC OOT4 5EPO31 t coCCIT 90- 50-345 .

ComPittID St- C. C. BBITER ,

OPER 47IaC ST &TCS TEIEPacet- 414-344-2564 X225 1 OWIT 51st EEsacEEE *****************ese****eoeseeoeseeeeeeeeeeeee l e e 2 8?PomT14G PEBICD FESSBatY, 1987

  • DOTES e e e 3 LICEsS!a TaEasat Pcuts (*st) 1653
  • The east was sketdoes for the schedeled e
  • reiseling estage on Petreaty 24.
  • O BACFPLATE SATIuG (CBCSS edE) 563
  • 1his shutdows ended the sait's second
  • j e longest coatissous run at 2a7 days.
  • 5 BESICs ELECTSICAL S AT!s; (SET RBI) 535 e e O SAEI539 DEPEBE Af1E C APECITY (CSCSS su!) 529 * *
  • e i

7 stII532 DEPEEDAB1F C APACITT tett smE) 503 **********************************************

O IF CnasCES OCC1E It CAPACITT EATIsCS (ITERS n'19BEW 3 T9905CR 7) SIDCE LAST p! PORT, CITE SEASC55 Scae 9 P00ER LEWEL TO b51CH p!StPICTit, If 447 (BET RBE) Some 13 REO5055 FOR DEStBICTICES, IF AET THIS RCBTE IS-TO-Datt CUROLATIVE 11 W1395 Is EEPottIBG PERICE 672 1416 111385 12 5313ES OF MoGas EE4CTOR bas C5ITICAL 570.3 1314.3 94915.6 13 CEACTOR PESEEf f SHUTEods pocas 0.0 0.0 2333.5 13 W0sts 4!sE34105 C5-LIBE 561.8 1313.e 93304.5 1% agIT PESE3*E SBOTDCha RC:95 0.0 0.0 10.0 15 CROSS 75FRM AL f BffCf GEhfRETES ("WR) 924655 2140335 146954049 17 CROSS ELECTRICAL FEFECT CE9E511 f t (RMW) 304400 714600 48497200 13 WET ELECTRICAL f ufsCT CEtte& tic (9maj 294511 682580 46178466 ,-

19 ceIT SEsvICE F4CTCe 94.e 92.s 83.s 23 DEIT AWAILASILitY FactCE e4.s 92.8 53.0 21 SWIT CAPACITY FACTCS (35150 SIC BET) 47.1 95.9 80.3 22 04IT CEPACITY FACTCR (OSIDG EES SET) 81.9 90.1 77.5 23 cut? ratCED Cutact R&tt 0.0 0.0 3.1 23 SHUTDodss SC2EESIE9 CVES BEIT t RCsTRS (11PE, D ATE, AND CBSATICE CF E ACE)

Scae 25 IF Sftft? Dcus AI f53 CF EEPC51 PfRIOD, ESTI*ATED DATE OF S14915P - April 5, 1987

~'~~

NRC-87-29 WPSC (4t'] 4331234 TELEX 5101012698 WPSC GRO TELECORER[414)433-1297 EASYUNK 62091993 WISCONSIN PUBLtdSERVU5iCORIOflITIO5 600 North Adams

  • PO. Box 19002
  • Green Bay, WI 54307-9002 March 10, 1987 10 CFR 50.36 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Monthly Operating Report The narrative " Summary of Operating Experience" and completed forms covering plant and component availability for the Kewaunee Nuclear Power Plant for February 1987 are enclosed in accordance with Technical Specification 6.9.1(c).

Ver truly yours,

/#

0. C. Hintz Vice President - Nuclear Power DJM/jms Enc.

cc - US NRC - Region !!!

Mr. Robert Nelson, NRC Sr Resident inspector RR #1, Box 999, Kewaunce, WI 54216 INP0 Records Center, Suite 1500, 1100 circle 75 Parkway, Atlanta, GA 30339