Monthly Operating Rept for Oct 1985
ML20138R856
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 10/31/1985
From: Hintz D, Ruiter G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM, WISCONSIN PUBLIC SERVICE CORP.
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
CON-NRC-85-169 NUDOCS 8511190146
Download: ML20138R856 (5)


Text

_ . - .

S.

DOCKET 50-305 KEWAUNEE NUCLEAP POWEP PLANT

SUMMARY

OF OPEPATING EXPERIENCE October, 1985 J

i OPFPATIONS: On October 6, unit load was reduced to 390 MWE gross for the monthly turbine stop and governor valve test. The unit was returned to full power the same day.

9A IN TEN A NC E
Replaced a defective Diesel Generator temperature
indicator.

Febuilt a Co nt a in men t Ventilation radiation monitor sample pump.

Replaced leaking check valves for the Diesel Generator air start system.

j Peplaced a worn Boric Acid transfer pump seal.

J Peplaced a defective thera pcouple in two Boric

Acid heat trace circuits.

1 i

j 8511190146 851031 PDR ADOCK 05000305 R PDR l

I h l . At

. _ _ . - _ .~ _ _ _ _ . ._ _ _ . - - . . . . _ _ _ _ _ _ _

< AVE 9 AG E DA ILY U 4 IT PO V EP LEVEL DOCKET NO- 50-305 UNIT- KEWAUNEE COPPLETED BY- G. H. PUITER '

TELEPI!ONE- 414-188-25F.0 1225 OCTOBE#, 1985 PEPOPT MONTH i

AVERAGE DATLY DAY POWFR LEVEL (M WE-N ET) 4 1 529 t 2 524 1

3 525 4 524 5 524 ,

6 500 I 7 524 8 529 i 9 524 l 10 529 3 11 524 1 12 529 I 13 524 14 529 i 15 524

!' 16 524 1 17 524 18 524 19 524 i 20 524 j 21 524 22 524

) 23 520 1

24 524 25 524  ?

?6 520 27 526 i

29 520  :

29 525 '

j 30 524 11 524 2

l 4

}

~

f1 N IT S 11 UTD0 W N S A 4 D PO wee P EDUCTI ONS DOCKET NO: 50-305 UNIT NAMF; Revaunce DATF: November 1, 1985 COMPLETED DY: G. H. Poiter TELEPHONF: 414-188-2560 x225 PEPORT MONTH - OCTORFP, 19R5 I NO. l- PAT' lTYPF lnflPATT04lPEASONlMFTHODl LEP Mil *RFP lSYS C09PONENT I C0=9ENTS }

l t  :

:  :  :  :  : 1 l' l 1 1 1 I I I I i 1 l 1 1 I I i 1 I I I wo shutdowns or power reductions in october. I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I i 1 1 1 I I I I I I i 1 1 1 I I I I I I l l l l 1 1 I I I I I I I I l l 1 1 I I I I I I i 1 I I I I I I I I I I I 1 1 1 1 I i 1 1 I I I I I I I I I I I I I I I I I I i i i I I I I I I I I I I I I I I I I I I I I I I I 1. I I I I I I I I I I I I I I -1 I I I I I I I I I I I i 1 1 1 I I I I I I I I I I I i i l l i I i 1 1 I I I I I i 1 1 1 1 1 I I 1 1 I I I I l i I I I I I I I I I I I I I I I I I I I I i 1 1 I I I I I I I I I i 1 1 I i 1 I I I I I I I I I I i i i I I i 1 I I I I i 1 l I I I I I I I I i 1 I I I I 1 1 I I I I I I I I 1 1 1 1 I I I 1 1 I I

.I . i. . . .I .I .I . . .I TYPE PE4SO4 M FT FIO D $7 5TER r, COMPON ENT CODES F: Fo rced 4-Fquipment Failure ('aplain) 1-Manoti Prom N D P EG-0161 S: Scheduled B-Maintenance or Test 2-Mannai Scram C- pa f u el in g 1-Automatic Scras D-9egulatory Pastriction 4-Continuations F-operator Tra ining r License Framination 5-Load Reductions F- Aelpin ist ra t i ve 9-Other G-oporational Peror (Prplain)

' /  ??-Ot h e r (F x pla in) d

O P P P AT IN G n A TA 9RPOR T DOCKPT CO- 50-105 COMPLETFD BT- G. H. EUITER -

O P ' P A*T N G STA T 4 S TELEPH04R- 410-1HH-2560 X225 1 n4TT MA9E MFWan19e **********************************************

2 R'?nPPT4G PEPT00 OCTOP'P, 19R5

  • NOTES
  • 3 LICFMS?D TH'*4AL POWER (M UT) 1650
  • Normal power opa; at ion continuei *
  • throuqh this reporting period.
  • 4 NaqsPLATE PATI 10 (GPOSS MWE) 560 *
  • 5 D' SIGN EL'CT9TCAL #ATING (NET MWP) 515 *
  • 6 M AKIPnm DEPT 4DAHLE CAPACITY (G9OSS MWF) 529 *
  • 7 M AX TP n* PPPFM n4 DLE CAPACITY (4ET MWF) 501 **********************************************

'8 T F CH AN1FS OCCU P IN CAPACITY nATINGS (I?PPS NUMRFP 1 THPonGH 7) SINCF LA97 P9POPT, GIVE PEASOMS Mone 9 POW FR L EY Ft. To WPICH #FSTPICTFD, IF ANY (N FT *W F) None 10 P F A SONS FOR nFSTPICTIONS, IF ANY THIS MONTH YP-70-DATE CHMULATIVE 11 H0095 TN P' PO PT I N G PP P T 00 745 7296 99745 12 NUM BER OF HOU9S P FACTOR W AS C RI"ICAL ' 745.0 5824.7 84575.2 13 R E A CTOP 9ESEPVE SHnTDOWN HOUPS 0.0 0.0 7310.9 14 ROUPS GENEPATOR OM-LINF 745.0 5782.0 H1122.7

.15 nNTT PESRPVF S1TDOWN HOUPS 0.0 0.0 10.0 16 C#0SS TMFo* AL MNERGY C.ENFPATFD (9EH) 1222074 9147313 130414417 17 C#0SS PLFCTPICA L FM F#GY GENFP ATFD (M W H) 404400 1112000 42969900 18 N ET 'LFCTFTC AL FNEPGY GEN E* ATED (PWH) 390317 296%984 40908020 19 UNIT SEPV TCP FACTOP 100.0 79.2 83.3 20 UNTT AVAILABILITY FACTOP 100.0 79.2 R3.1 21 ngIT CA*ACTTY FACTOP (USING P DC P PT) 104.2 RO.R 79.2 22 DMIT CAPACITY F ACTOP (USING DPP NFT) 97.9 76.0 76.7 ,

23 UNIT FOPCFn OUT AGF P ATE 0.0 0.3 3.1 24 SunTDOW45 SCHEDULPD OV ER NFIT 6 M04THS (TYPE, DATE, AMD DUF ATION OF R ACH)

Pefuelinq outage of eiqht w e* > duration scheduled to start February 28, 1986.

25 I' SHUT DnWg AT FMD O F #P POPT P'PIOD, FSTT9ATFD DATE OF STAPT4P - N/A

NRC-85-169 l

WISCONSIN PUBLIC SERVICE CORPORATION P.O. Box 19002, Green Bay, WI 54307-9002 November 8, 1985 Director, u Office of Inspection and Enforcement Attention Docunent Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Monthly Operating Report The narrative "Sumary of Operating Experience" and completed forms covering plant and component availability for the Kewaunee Nuclear Power Plant for October 1985 are enclosed in accordance with Technical Specification 6.9.1(c).

Very truly yours, tw D. C. Hintz vl Manager - Nuclear Power WRC/js Enc.

cc - Mr. J. G. Keppler, Reg Adm US NRC - Region III Mr. Robert Nelson, NRC Sr Resident Inspector RR #1, Box 999, Kewaunee, WI 54216 Mr. S. A. Varga, Chief US NRC - Div. of Licensing INP0 Records Center, Suite 1500, 1100 Circle 75 Parkway, Atlanta, GA 30339 5 o