DOCKET 50-305 KEWAUNEE NUCLEAR POWER PLANT SUMM ARY OF OPER ATING EXPERIENCE February, 1985 OP ER ATIONS:
The unit was taken off line at 0004 Hours on February 8,
- 1985, to begin the scheduled Cycle i-X-XI refueling outage.
i MAINTENANCE:
Refueling outage started on Friday, February 8.
Surveillance testing as required by Tech. Specs.,
and corrective and preventative maintenance is in i
progress.
Replaced a
defective steam Generator level transmitter.
I Replaced a defective Source Range detector.
4 Replaced bearings on a Haste Gas compressor.
I l
l B503190710 850228 PDR ADOCK 05000305 R
PDR 4-
V ERAGE DA ILY UN IT PO W ER LEVEL DOCKET NO-50-305 UNIT-KEWAUNEB COMPLETED BY-G.
H.
RUITER TELEPIIONE-414-388-2560 1225 REPORT MONTH PEDRUARY, 1985 AVERAGE DAILY DAY POWER LEVEL (fl W E-N ET) 1 521 2
521 3
521 4
.521 5
521 6
517 7
447 0
0 9
0 10 0
11 0
12 0
13 0
14 0
15 0
16 0
17 0
18 0
19 0-20 0
21 0
22 0
23 0
24 0
25 0
26 0
27 0
2R 0
I i
l I
l I
9
~
J J
ff N IT SHUTD09 WS AN D PO PEP R EDUCTIONS e
J' DOCKET NO: 50-3C5 UNIT NAME: Kevaunce DATE: March 1,
1945 Co*PLETED DY: G. H.
P 'J it er
'J TELEPHONE: 414-388-2560 x225 O
PFPORT MONTH - FE39ff1RY, 1985 g
h DATE l TYPE hDUPATI0FhREASONhMETHODhLER NU9BEP lSYS hCOMPONENTh COM9ENTS h
d
}
50 l
l l
l 8
I i
1 I
I i
1 1
I I
I 1 1 1 2/ 9/953 S i 503.9 I C 3 1 I
N/A 1 ZZ l ZZZZZZ l
1.
Cosacaced Cycle I-II refueling outage.
I J
l I
i 1
I I
I I
I i
1 1
I I
i 1
1 I
I I
I I
1 I
I I
i 1
1 1
I i
1 J
l i
I I
I I
I I
I I
I I
I I
I I
I I
I I
i 1
I I
I I
I I
I i
1 1
I J
I 1
I i
1 I
I I
I i
1 I
I I
I I
I I
I i
1 I
I I
I I
I I
I I
I I
I J
l i
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
1 I
I 1
1 I
I I
I I
I V
I I
I I
I I
I I
I I
I I
I I
I i
i l
i 1
1 1
O I
I I
I I
I I
I I
I I
~"
I I
I I
I I
I I
I I
I I
i 1
I I
I I
I I
i 1
O I
I I
I I
I I
I I
I l
I 1
1 I
I I
I l
i I
I i
1 1
I I
I I
I 1
I i
1 I
I I
I I
I i
I I
i J
l I
I i
1 1
I I
I I
I I
I I
I i
1 1
I I
I I
I I
I I
I I
I I
I I
I J
I I
I I
I I
I I
I I
I I
I I
i 1
1 I
I I
I i
I I
1 1
I I
I I
I I
I J
l I
I I
I 1
1 1
1 l
I I
I I
I I
I I
i 1
1 I
J TYPE RZ ASON METEOD SYSTEM & C09PONEN T CODRS w
J F: Forced A-Ey eipmen t Failure (Explaia) 1-Manual From NOREG-0161 S: scheduled B-Riintenance or Test 2-Eanual Scram C-petualing 3-Rutomatic Scran U
w D-Regulatory Festriction 4-Continuations g
Y-Operator Training & License Eraalaation 5-Load Reductions F-Alainistrative 9-Other O
G-operational Ftror (Espiais)
B-Other (Explais) g
OPERATIWG DATA PEPQR7 O
i DOCKET Co-50-305 COWFLETED DY-G. E.
BUITER OPER ATIT C STATUS TELEPHONE-414-3RS-2560 1225 J
i 1 UNIT NAME K wAUBEC l -
Y 2 PEPO
- TING P EP IS D FESPnAPT, 1985
on February 8, 1995 for the scheduled 4 N A9 E? TATE S ATIg (GeOSS not) 560 Cycle I-II refueling outaje.
O The unit had been on line continuously l
5 DESIGN ELECTRICAL P ATING (WET REE) 535
- for 219.9 days; this is the fourth
- consecutive cycle in which a run l
6 MAII101 CEPENDABLE CAPACITY (390SS 382) 529 longer than 200 days was achieved.
J 7 MAII1DS D'PEEDABLY CAPACITY (EET RsE) 503 s.
.J 9 IT CEari!S OCCUP IX CAPACITY RATINGS (ITE55 NUMBER 3 THROUGH 7) SINCE LAST BEPORT, GIVE REASOMS t
None
'is J
9 POW o? LTTEL To BRICH PESTPICT ED, IF ANY (W ET REE) None
, w J
10 R!1 SONS F03 P ES TR ICTIO 35, IF ANT l '.
J THIS MONTH TR-TO-DATE CUMULATITE 115059S IN PEPOPTING PEPIOD 672 1416 93965 12 EUMBER OF NOUPS R UCTOR WAS CPITICAL 168.1 912.1 79662.6 II 13 R! ACTOR RESERTE SE37DOWN ROURS 0.0 0.0 2330.5 t
w O
14 F05PS G!3?P ATO9 05-LINE 168.1 912.1 78252.8 i*
15 UNIT PESEPTE SUTDOWE R0095 0.0
- 0. 0 10.0 J
i 16 GROS 3 T3EPR AL ENEPOT GENERATED (185) 2710aB 1495327 122562451 lw l
17 G?oSS ELECTRICAL EMERGY GENEP ATED (5W5) 89800 495800 40353100 J
1 **
19 FIT ELECTPICAL EN ERGY GENERATED (588) 85656 4733,77 38415413 J
19 UNIT S!1TICE FACTOR 25.0 64.4 83.4 J
23 UNIT AVAILABILITY FACTOR 25.0 64.4 83.4 21 UNIT CAP ACITY F ACTOR (USINO HDC WET) 25.3 66.5 78.9 J
22 5117 CAPACITY FACTOR (USINT DER NET) 23.8 62.5 76.5 w
W 23 UNIT F01CED OUTAGE RATE 0.0
- 0. 0 3.5 i
24 5537D0855 SCHEDULED OVER WEIT 6 MONTHS (TTPE, DATE, AND DURATIOW or E ACH)
(D Nome 25 IF Sant 00ss AT END OF REPORT PERIOD, MSTINATFD DATE OF STARTUP - April 10, 1985 ll
NRC-85-42 WISCONSIN PUBLIC SERVICE CORPORATION P.O. Box 1200, Green Bay, WI 54305 March 8, 1985
- Director, Office of Inspection and Enforcement Attention Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Gentlemen:
Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Monthly Operating Report The narrative " Summary of Operating Experience" and completed forms covering plant and component availability for the Kewaunee Nuclear Power Plant for Februany 1985 are enclosed in accordance with Technical Specification 6.9.1(c).
I Very truly yours, h/f D. C. Hintz Manager - Nuclear Power JGT/js Enc.
cc - Mr. J. G. Keppler, Reg Adm US NRC - Region III Mr. Robert Nelson, NRC Sr Resident Inspector RR #1, Box 999, Kewaunee, WI 54216 Mr. S. A. Varga, Chief US NRC - Div, of Licensing INP0 Records Center, Suite 1500, 1100 Circle 75 Parkway, Atlanta, GA 30339 f62Y