I.
e DOCKET 50-305 i
e KEWAUNEE NUCLEAE POWEB PLANT SUMMAEY OF OPERATING EXPERIENCE June, 1984 OPERATIONS:
A load reduction to 44% was taken on June 2, for condenser waterbox inspection and performance of the monthly Turbine Stop Valve test. The unit was returned to full power on June 4.
i M A IN TEN A NCE:
Replaced a broken phase barrier support in a 480V breaker.
Adjusted and/or installed new seals on Shield Building doors.
Eepacked several valves on the Spent Fuel Pcol cooling system.
Installed new plungers in a Charging Pump.
Adjusted Special Vent system damper controls.
r t
I i
1 I
l 8407160108 840630 i
PDR ADOCK 05000305 R
pop
i.
A,V.E R A G E DAILY UN IT PO WEE LEVEL DOCKET NC-50-305 UNIT-KEWAUNEE COMPLETED BY-G.
H.
FUITER TELEPHONE-414-388-2560 1225 L-BEPOET MONIH JUNE, 1984 l
AVERAGE DAILY DAY POWEE LEVEL (MWE-NET) 1 520 2
238 3
250 4
503 5
520 6
520 7
520 8
524 9
520 10 524 11 520 12 520 13 520 14 524 15 520 16 524 i
17 520 18 524 i
19 520 20-520 21 520 22 520 23 524 24 520 25 520 l
26 520 27 520 l
28 524 l
29 520 30 520 i
i-
d J
L U N IT SHUTDCW 5S
&ND PON ER REDUCTIONS g,
4 DOCKET NO: 50-305 d'
ONIT NAME: Kevaunee DATE: July 2, 1984 COMPLETED Br:
G.
H.
Suiter TELEPHONE: 414-388-J560 x225
~
0 BEPOET MONTH - JUNE, 1984 g
ITYPE hDP AIIONlEF ASONIMETHCDi b
l
- 30. l DATE IER NUMBER lSYS l COMPON!NT l CCMMENTS l
d 6
4 1
4 4
i I
I I
I I
I I
I I
I I
l-6 I 6/ 7/841 F 1 0.0 i B l 5 i
N/A I HF 1 HTEXCH I 6.
A load reductjen to 44% power was required to 4 3
I l
l 1
1 1
I I
I I
permit ice;ection of the Main Condenser l I
I I
i 1
1 I
I I
I watertorea and the repair of a special test I I
I I
I I
I I
I I
I instrument sensing line due to circulating I I
I I
I I
I I
I I
I water leakage into the condenser.
I I
I I
I I
i i
i i
i I
I I
I I
I I
I I
i a
i J'
l i
I I
I I
I I
I I
I I
I I
I I
I I
I i
1 1
I I
I I
I I
I i
1 J
I l
i I
I I
I I
I I
i 1
I I
I i
1 I
I I
i 1
1 I
I I
I I
I I
I I
I I
U i
I I
I I
i i
I i
i i
i I
I I
I i
1 I
I I
I b
1 I
i i
i i
i a
i I
i O
I I
I I
I I
i 1
I I
I I
i i
I I
i i
i I
I I
I I
I I
I I
I I
i 1
O 1
I I
I I
I I
I I
I I
i I
I I
I I
I I
I I
I I
b I
I I
I I
I I
I I
I I
I J
l i
I I
I I
I I
I i
i i
I I
I I
I I
I I
I I
I I
I I
I I
I i
1 1
J I
I I
I I
I I
I I
I I
I I
I I
I i
1 I
I I
I b
I I
i 1
i i
i i
I I
I I
J l
i I
I I
I i
i i
I I
I I
I I
i 1
1 1
1 I
I J
TYPE EE3 SON METHCD SYSTEM & COMPOWENT C'0 DES J
t' Forced A-Equipment Failure (Explain) 1-Manual From NDREG-0161 S: Scheduled B-Maintenance or Test 2-Manual Scran C-Petueling 3-Rutomatic Scran b
D-Pegulatory Pestriction 4-Continuations I-Cperator Training & License ExaFination 5-load Feductions F-Mainistrative 9-Other O
G-Cperational Error (Explain)
H-Cther (Explain) g
=
s)
OPEBATINO DATA EEPQRT k-DOCKET NO-50-305 COMPLETED BY-G.
H.
BUITER OPEB ATIN G STATUS TELEPHONE-414-388-2560 I225
.- -)
1 UNIT NA1R K!WAUNEE s) 2 FEPCPTING PEPIOD JUNL, 1984
- NOTES O
3 L!CINSED THFF M AL POWEB (MUT) 1650
- Notaal power operation continued
- throughout this reporting period.
4 N AMIPL ATE B ATING (GEOSS MWE) 560 O
w 5 DESIGN ELECT 5ICAL B ATING (NET MWE) 535 6 1AIIMUM DEPENDABLE CAPACITY (GEOSS MWE) 529 J
7 M AXIMUM DEPENDABLE CAPACITY (HET MWE) 503 8 IF CHANGES CCCUB IN CAPACITY BATINGS (ITIMS NUMBER 3 TBBOUGH 7) SINCE LAST PEP 0BT, GIVE REASONS None b
,,,)
9 PCdIB LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) None n %a
.s 10 PEASCNS FCE PESTRICTICNS, IF ANY J
THIS MONTH TR-TD-DATE CUMULATIVE g
11 HCUES TN BEPOPTING PERIOD 720 4367 88032 b
12 NUMEEP OF HOUPS BIACIOR WAS CSITICAL 720.0 3157.8 74337.7 UI 13 FEACTOP EESEPTE SHUIDOWN HOUES 0.0 0.0 2330.5 g
14 HOUBS GE N!E ATOB O E-LINE 720.0 3118.7 72931.1
- b-15 UNIT RESEPTE SUIDCWN HCUPS 0.0 0.0-10.0 16 G50SS THE3 MAL ENESGY GENERATED (MWH) 1144593 4880196 113851282
- %a
.)
17 G50SS ELECTFICAL INEEGY GENESATED (MWH) 379800 1609000 37467100 b-18 NET ELECTPICAL ENEFGY GENFBATID (MWH) 361333 1532605 35664641 l
19 UNIT SERVICE PACTC9 100.0 71.4 U2.9 20 UNIT AVAILABILITY FACTOR 100.0 71.4 82.8
}b-21 UNIT CAPACITY FACTOR (USING MDC NET) 99.8 69.8 77.9 J
22 UNIT CAPACITY FAC10R (USING DIE NET) 93.8 65.6 75.7 g
23 UNIT F0FCED OUT AGE B ATI 0.0 0.3 3.8 24 SHUIDOWNS SCHIDULID OVER NEIT 6 MONTHS (TTPE, DATE, AND DURATION OF EACH)
None k'
25 IF SHUT DOW4 AT END OF EEPOPT PEPICD, ESTIMATED DATE Of STARTUP - 5/A
r-NRC-84-113 WISCONSIN PUBLIC S ERVICE CORPORATION P.O. Box 1200, Green Bay, Wisconsin 54305 July 10, 1984
- Director, Office of Inspection and Enforcement Attention Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Gentlemen:
Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Monthly Operating Report The narrative " Summary of Operating Experience" and completed forms covering plant ano component availability for the Kewaunee Nuclear Power Plant for June 1984 are enclosed.
Very truly yours,
{A C. W. Giesler Vice President - Power Production JGT/js Enc.
cc - Mr. J. G. Keppler, Reg Adm US NRC - Region III Mr. Robert Nelson, NRC Sr Resident Inspector RR #1, Box 999, Kewaunee, WI 54216 Mr. S. A. Varga, Chief US NRC - Div. of Licensing INP0 Records Center, Suite 1500, 1100 Circle 75 Parkway, g[