Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20236N3451987-10-31031 October 1987 Monthly Operating Rept for Oct 1987 ML20235V1161987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 ML20238F7541987-08-31031 August 1987 Monthly Operating Rept for Aug 1987 ML20237H6861987-07-31031 July 1987 Monthly Operating Rept for Jul 1987 ML20235J3101987-06-30030 June 1987 Monthly Operating Rept for June 1987 ML20215A3211987-05-31031 May 1987 Monthly Operating Rept for May 1987 ML20213G4341987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20206H4301987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20207R6091987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 ML20211A1761987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20207M8271986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 ML20211M0441986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20213F2231986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20207F6021986-09-30030 September 1986 Monthly Operating Rept for Sept 1986 ML20210C8931986-08-31031 August 1986 Monthly Operating Rept for Aug 1986 ML20212F5161986-07-31031 July 1986 Monthly Operating Rept for Jul 1986 ML20202G9981986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20211E1391986-05-31031 May 1986 Monthly Operating Rept for May 1986 ML20197D1581986-04-30030 April 1986 Monthly Operating Rept for Apr 1986 ML20203A5751986-03-31031 March 1986 Monthly Operating Rept for Mar 1986 ML20154M3421986-02-28028 February 1986 Monthly Operating Rept for Feb 1986 ML20214B7281986-01-31031 January 1986 Monthly Operating Rept for Jan 1986 ML20137C3581985-12-31031 December 1985 Monthly Operating Rept for Dec 1985 ML20138D5051985-11-30030 November 1985 Monthly Operating Rept for Nov 1985 ML20138R8561985-10-31031 October 1985 Monthly Operating Rept for Oct 1985 ML20138B6491985-09-30030 September 1985 Monthly Operating Rept for Sept 1985 ML20135G0591985-08-31031 August 1985 Monthly Operating Rept for Aug 1985 ML20133Q1701985-07-31031 July 1985 Monthly Operating Rept for Jul 1985 ML20132G1211985-06-30030 June 1985 Monthly Operating Rept for June 1985 ML20127A1101985-05-31031 May 1985 Monthly Operating Rept for May 1985 ML20127M0441985-04-30030 April 1985 Monthly Operating Rept for Apr 1985 ML20115H3501985-03-31031 March 1985 Monthly Operating Rept for Mar 1985 ML20099J4281985-02-28028 February 1985 Monthly Operating Rept for Feb 1985 ML20106G2981985-01-31031 January 1985 Monthly Operating Rept for Jan 1985 ML20112G9941984-12-31031 December 1984 Monthly Operating Rept for Dec 1984 ML20100Q2961984-11-30030 November 1984 Monthly Operating Rept for Nov 1984 ML20099B8981984-10-31031 October 1984 Monthly Operating Rept for Oct 1984 ML20097H9321984-08-31031 August 1984 Monthly Operating Rept for Aug 1984 ML20094N4261984-07-31031 July 1984 Monthly Operating Rept for Jul 1984 ML20093D0701984-06-30030 June 1984 Monthly Operating Rept for June 1984 ML20092G6171984-05-31031 May 1984 Monthly Operating Rept for May 1984 ML20084M4201984-04-30030 April 1984 Monthly Operating Rept for Apr 1984 ML20083K3761984-03-31031 March 1984 Monthly Operating Rept for Mar 1984 ML20087C7141984-02-29029 February 1984 Monthly Operating Rept for Feb 1984 ML20080H1031984-01-31031 January 1984 Monthly Operating Rept for Jan 1984 ML20083H9791983-12-31031 December 1983 Monthly Operating Rept for Dec 1983 ML20082R5131983-12-0101 December 1983 Monthly Operating Rept for Nov 1983 ML20081L2911983-11-0101 November 1983 Monthly Operating Rept for Oct 1983 ML20080R0711983-09-30030 September 1983 Monthly Operating Rept for Sept 1983 ML20077P0591983-09-0909 September 1983 Monthly Operating Rept for Aug 1983 1987-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEAR05000305/LER-1998-003, :on 980203,RCS Low Flow Trip Logic Were Identified as Not Been Tested IAW Tss.Caused by Personnel Error.Testing Was Conducted IAW Requirements of Section 4 of TS1998-03-0505 March 1998
- on 980203,RCS Low Flow Trip Logic Were Identified as Not Been Tested IAW Tss.Caused by Personnel Error.Testing Was Conducted IAW Requirements of Section 4 of TS
ML20140E9181997-06-0707 June 1997 Safety Evaluation Supporting Amend 133 to License DPR-43 05000305/LER-1996-007, :on 961023,identified Design Deficiency in Containment Isolation Function.Caused by Oversight During Plant Design.Implemented Administrative Controls to Preclude Subject Condition Prior to Plant start-up1996-11-22022 November 1996
- on 961023,identified Design Deficiency in Containment Isolation Function.Caused by Oversight During Plant Design.Implemented Administrative Controls to Preclude Subject Condition Prior to Plant start-up
ML20115J3981996-07-22022 July 1996 Interim Part 21 Rept Re 3/4 Schedule 80 Pipe Furnished to Consolidated Power Supply.Investigation Revealed Only One Nuclear Customer Involved in Sale of Matl 05000305/LER-1995-003, :on 950516,failed to Adequately Assess Consequences During Recovery from Switch Misposition Resulted in Turbine/Rt.Reminded Nco of Importance of Self Checking1995-06-14014 June 1995
- on 950516,failed to Adequately Assess Consequences During Recovery from Switch Misposition Resulted in Turbine/Rt.Reminded Nco of Importance of Self Checking
ML1118201651994-06-28028 June 1994 Knpp IPEEE Summary Rept ML1118201571994-06-0303 June 1994 Probabilistic Risk Assessment ML20045C9281993-06-21021 June 1993 Safety Evaluation Accepting Licensee Change to TS Bases Re DG Fuel Oil Transfer & Storage Sys ML20034D8261993-02-0202 February 1993 Reload Safety Evaluation,Cycle 19 ML20126J5961992-12-31031 December 1992 Part 21 Rept Re Potential Loss of RHR Cooling During Nozzle Dam Removal.Nozzle Dams May Create Trapped Air Column Behind Cold Leg Nozzle Dam.Mod to Nozzle Dams Currently Underway. Ltrs to Affected Utils Encl ML1118207361992-12-0101 December 1992 Individual Plant Exam Summary Rept ML20113H4871992-07-30030 July 1992 Part 21 Rept Re Surge Line Flooding Which May Occur When Large Pressurizer Vent Used to Support Reduced Rc Inventory Operations.Notification Received from Westinghouse on 920312.Item Not Reportable Per 10CFR21 ML20086U0311991-11-30030 November 1991 SG Tube Plugging Criteria for Outside Diameter Stress Corrosion Cracking (ODSCC) at Tube Support Plates ML20077K0831991-06-30030 June 1991 Nonproprietary Technical Justification for Eliminating Pressurizer Surge Line Rupture as Structural Design Basis for Kewaunee Nuclear Plant ML1118102861991-05-31031 May 1991 Handbook on Flaw Evaluation Kewaunee,Unit 1 Steam Generators Upper Shell to Cone Weld ML20091E3441991-03-31031 March 1991 Nonproprietary Structural Evaluation of Kewaunee Pressurizer Surge Line,Considering Effects of Thermal Stratification ML20066B2101990-12-31031 December 1990 Generator Mid-Cycle Rept,Dec 1990 ML20062A4641990-09-30030 September 1990 Nonproprietary, Reevaluation of U-Bend Tube Fatique for Kewaunee Plant Steam Generators 05000305/LER-1990-005, :on 900404,intergranular Attack & IGSCC Results in Both Steam Generators a & B Being Categorized as C-3.All Defective Tubes Plugged & Sludge Lancing & Crevice Flushing Conducted1990-05-0404 May 1990
- on 900404,intergranular Attack & IGSCC Results in Both Steam Generators a & B Being Categorized as C-3.All Defective Tubes Plugged & Sludge Lancing & Crevice Flushing Conducted
ML1117803551990-04-30030 April 1990 Generator Tubesheet Crevice Indications Return to Power Rept ML20005G6831990-01-0505 January 1990 Part 21 Rept Re Installation Instructions for Grommet Use Range for Patel Conduit Seal P/N 841206.Conduit Seals in Environ Qualification Applications Inspected for Proper Wire Use Range & Grommets Replaced ML19354D8351989-11-0808 November 1989 Presentation to NRC Re Kewaunee (Wps) SECY-83-472 LOCA Analysis Effort ML20247D3011989-07-12012 July 1989 Part 21 Rept 10CFR21-0047 Re Control Wiring Insulation of Inner Jacket Used on General Motors Diesel Generator Sets Identified as 999 or MP Series.Encl List of Owners of Units Notified 05000305/LER-1989-009, :on 890401,during Repositioning of Ventilation Dampers,Jumper Inadvertently Detached from Terminal Block Contact,Causing Damper Actuation.Caused by Procedural Inadequacies.Weidmuller Blocks Installed1989-05-0101 May 1989
- on 890401,during Repositioning of Ventilation Dampers,Jumper Inadvertently Detached from Terminal Block Contact,Causing Damper Actuation.Caused by Procedural Inadequacies.Weidmuller Blocks Installed
05000305/LER-1989-006, :on 890315,audit Identified Failure to Implement Tech Spec Re Testing of Fan Coil Emergency Discharge Dampers & Backfit Dampers.Caused by Procedural Inadequacy.Procedure Updated1989-04-14014 April 1989
- on 890315,audit Identified Failure to Implement Tech Spec Re Testing of Fan Coil Emergency Discharge Dampers & Backfit Dampers.Caused by Procedural Inadequacy.Procedure Updated
05000305/LER-1989-005, :on 890310,insp of Diesel Generator Start Up Air Sys Finds Deficiencies That Could Render Both Diesel Generators Inoperable Due to Inadequate Design.Cause Unknown.Generic Implications Will Be Examined1989-04-10010 April 1989
- on 890310,insp of Diesel Generator Start Up Air Sys Finds Deficiencies That Could Render Both Diesel Generators Inoperable Due to Inadequate Design.Cause Unknown.Generic Implications Will Be Examined
ML20235J1941988-11-30030 November 1988 Analysis of Capsule P from Wisconsin Public Svc Corp Kewaunee Nuclear Plant Reactor Vessel Radiation Surveillance Program ML20207N4641988-10-12012 October 1988 Part 21 Rept Re Potential Problem W/Emd 20-645E4,Type 999 Excitation Sys Circuit Breaker & Wiring.Potential for Field Circuit Breaker to Trip Due to Combined Air Temps & Field Current Exists at All Plants W/Model 999 Sys ML20206E9801988-06-30030 June 1988 Rev 2 to Handbook on Flaw Evaluation,Kewaunee Unit 1 Steam Generators Upper Shell to Cone Weld ML20196G5251988-06-15015 June 1988 Technical Review Rept T809, Blocked Thimble Tubes/Stuck Incore Detector ML20154H0391988-04-30030 April 1988 Slide Presentation Matl,Nrc Meeting 880331,Kewaunee Nuclear Power Plant Steam Generator Tube Sleeve Installation ML20196G8881988-03-0303 March 1988 Headquarters Daily Rept for 880303 ML20147B2921987-12-31031 December 1987 Annual Operating Rept for 1987 ML20149J0261987-12-21021 December 1987 Part 21 Rept Re Installation of Relay Part B8002DN in Foxboro 62H Controllers in Facilities.Subj Relay Must Be Replaced by Relay Part N0196ZN.Relay B8002DN Not Used in Any Other Plants ML20236W7341987-11-30030 November 1987 Nonproprietary Kewaunee Steam Generator Sleeving Rept (Mechanical Sleeves) ML20236F3101987-10-31031 October 1987 Nonproprietary WCAP-11620, Addl Technical Bases for Eliminating Large Primary Loop Pipe Rupture as Structural Design Basis for Kewaunee ML20236N3451987-10-31031 October 1987 Monthly Operating Rept for Oct 1987 ML20235V1161987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 ML20238F7541987-08-31031 August 1987 Monthly Operating Rept for Aug 1987 ML20237H6861987-07-31031 July 1987 Monthly Operating Rept for Jul 1987 ML20235J3101987-06-30030 June 1987 Monthly Operating Rept for June 1987 NRC-87-3236, Part 21 Rept Re Potential Util Failure to Comply W/Component Containment Isolation Licensing Commitment If Proposed Mods to Component Cooling Water Sys Instituted.Utils Advised to Evaluate Containment Isolation Sys1987-06-18018 June 1987 Part 21 Rept Re Potential Util Failure to Comply W/Component Containment Isolation Licensing Commitment If Proposed Mods to Component Cooling Water Sys Instituted.Utils Advised to Evaluate Containment Isolation Sys ML20215A3211987-05-31031 May 1987 Monthly Operating Rept for May 1987 ML20215L8061987-04-30030 April 1987 Nonproprietary Rev 1 to Technical Bases for Eliminating Large Pipe Rupture as Structural Design Basis for Kewaunee ML20213G4341987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20206H4301987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 05000305/LER-1987-002, :on 870224,reactor Tripped When Source Range Nuclear Flux Detectors 1 & 2 Erroneously Reached Nominal Reactor Trip Setpoint of 1.0E05 Counts/S.Caused by Seepage of Borated Refueling Water Into Instrument1987-03-26026 March 1987
- on 870224,reactor Tripped When Source Range Nuclear Flux Detectors 1 & 2 Erroneously Reached Nominal Reactor Trip Setpoint of 1.0E05 Counts/S.Caused by Seepage of Borated Refueling Water Into Instrument
05000305/LER-1987-001, :on 870223 & 24,series of High Radiation Alarms Received in Control Room.Caused by Primary to Secondary Leak in Steam Generator 1A.Results of Eddy Current Testing Will Be Submitted1987-03-25025 March 1987
- on 870223 & 24,series of High Radiation Alarms Received in Control Room.Caused by Primary to Secondary Leak in Steam Generator 1A.Results of Eddy Current Testing Will Be Submitted
05000305/LER-1985-015, :on 850617,Fluor Engineers,Inc Notified Util of Inadequate Documentation to Support Seismic Qualification of Diesel Generator Differential Relays.Relays Replaced W/Ge Seismically Qualified Relays on 870120 & 211987-03-0606 March 1987
- on 850617,Fluor Engineers,Inc Notified Util of Inadequate Documentation to Support Seismic Qualification of Diesel Generator Differential Relays.Relays Replaced W/Ge Seismically Qualified Relays on 870120 & 21
ML20207R6091987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 1998-03-05
[Table view] |
Text
-
4 DOCKET 50-305 KEWAUNEE NUCLEAR POWER PLANT 4
SDMBARY OF OPERATING EXPERIENCE August, 1986 OPERATIONS:
on August 17, unit load was reduced to 390 MWE Gross for performance of the monthly Turbine Stop and Control Talve test. The unit was returned to full power the same day.
On August 21, unit load was reduced to 225 Hue Gross for inspection of the Condenser waterboxes.
On August 23, unit load was reduced to 225 MWe Gross for cleaning of the condenser waterboxes, j
the unit was returned to full power on August 24.
1 i
BAINTENANCE:
Added approximately two gallons of oil to a
Beactor Coolant Pump.
Replaced the mechanical seal on a RHB Pump.
Replaced Clark relays for DCR 980.
Performed EQ grease changes on two limitorque valve operators.
Repaired the speed controller for a Charging Pump.
Bepaired motor leads on a SI val.ve.
s m'q88u MBhr k
R
/\\
Y
AYERAG E DA ILY UNIT PONER LEYEL DOCKET NO-50-305 UNIT-KEWAUNEE COMPLETED BY-G. H. RUITER TELEPHONE-414-388-2560 x225 REPORT MONTH AUGUST, 1986 AYERAGE DAILY DAY POWER LEVEL (MBE-NET) 1 519 2
515 3
515 4
511 5
519 6
520 7
515 8
520 9
515 10 520 11 511 12 507 13 507 14 507 15 515 16 515 17 491 18 515 19 507 20 499 21 433 22 453 23 220 24 331 25 519 26 520 27 524 28 520 29 520 30 515 31 520
UWIT SN9TD0W5S A59 PO9ER REDUCTIO 55 DOCKET 50: 50-305 UNIT BARE: Reesseee DATE: September 1, 1986 COMPLETED BY: C. R. Reiter TELEPHONE: 414-388-2560 x225 REPORT RONTH - A9 GUST, 1986 j
WO. l DATE lTIFElDORATICWlRE8505lRETWODl1ERBORSER lSYSlCORPOWERTl CORREBTS l
l l
l l
l l
l l
l l
l I
I I
I I
I I
I I
I I
l 7 8 8/21/861 F l 0.0 I B l 5 l
W/A I MC I RTEECH I 7.
Unit load was redeced to 225 MWE Cross to i l
i l
I I
I I
I l
1 Permit inspection of the esta condesser for I I
I I
I e
i i
l I
I tiological fooling which was sospected due to I I
I I
I I
I I
I I
I reduced condesser performance.
I I
I I
I I
I I
I I
i i
I e I s/23/961 F l
- 0. 0 1 8 3 5 i
N/A I MC 1 ETEECM i 8.
Seit load was reduced to 225 ReE gross to i I
i 1
1 I
i i
l i
I Permit cleaning of the Raia Coedesser tubes to i I
I i
1 I
I I
I I
I resove biological toeling. Appromina tely 32 I I
I I
I I
I I
I I
I RWE gross emit cetpet was recovered following i I
I I
I I
I I
I I
I this operation.
1 I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I ** '.
1 I
I I
I I
I I
I I
I '-
I 9,
I I
I I
I I
I I
I i
1 I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
1 I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I i
1 8
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
.I
.I l.
.i I
I
.I I
.I I.
.I TTP3 REASON RET 800 SYSTEM S CORPOWEET CODES F: Forced A-Egelpeest Failure (Explais) 1-Ressel Free WOSIG-0161 C: Schedeled a-Maintenance or Test 2-sessel Scree C-Refueling 3-Retonatic Scree D-Regelatory Westrictice 4-Contissettoes E-Operator Traising 6 License Examleation 5-Load Bedections F-Adelaistrative 9-Ot he r C-Operational Error (Explain)
M-Other itsplein)
OPRRATICC DATA R E P @ R T.
DOCRET BO-50-305 CORPLETED Bf-C. R. ROITER 0PRRATIWG ST&TUS TELEPROBE-414-388-2560 E225 1 UNIT WARE ret 4UNER 2 PEPORTING PERIOD AU CUST, 1986
- WOT85 3 LICENSED TsRantL poser (est) 1650 Woraal power operation continued three9h this reportlag period.
4 NARFFLATE RATING (GROSS MWE) 560 A Ioad redoction was taken for cleaning of condenser tubes.
5 DESIGN ELECTRICAL RATING (pt? RWE) 535 6 M ARIRUR DEPENDABLE CAPACITY (GROSS RWE) 529 7 R AIIMUM DEPEND 48LE CAPACITY (SRT BWR) 503 8 IF CBARGES OCCUR IW CAPACITY DATINGS (ITEMS BUMBER 3 THROOCH 7) SIBCE LAST REPORT, SITE REASONS Bone 9 POWER LETEL TO WRICR RESTRICTED, IF ANY (RET REE) Wome 10 REASDBS FOR RESTRICTIONS IF ABY THIS MONTR TR-To-DATE
_ CSR8tATITE 11 ROWRS IN BEPORTIBC PEFIOD 744 5831 f *'
107040 12 W98333 0F RODES REACTOR WAS CRITICAL 744.0 4655.3 7,; 90672.3 13 REACTOR RESERTE $9tTD095 NOORS
- 0. 0 0.6 s.
= c.f; 2330.5 14 ROWRS SEBERATOR OW-LINE 744.0 4586.2. ".
89141.7 15 54IT RESERVE SBTDOWN WOURS 0.0 0.0 10.0 16 GROSS THERMAL ESERGY GENERATED (M9H) 1179835 7319598 140036430 17 CROSS ELBCTRICAL EBERGY GENERATED (RSR) 387000 2443100 46181600 TO CET ELRCTRICAL EptRCT GEWERATPD (Res) 367650 2327751 43968963 13 UNIT SRETICE FACTOR 100.0 78.7 83.3 20 UNIT AYRILABILITY FACTOR 100.0 78.7 83.3 21 UNIT CAPACITY FACTOR (USI5G RDC NET) 98.2 79.4 79.5 22 EWI? CAP & CITY FACT 09 (OSIRG DER NET) 92.4 74.6 76.8 23 UNIT PORcRD OUTAGE R ATE
- 0. 0 0.6 3.2 24 SRWTDOWWS SCHEDELED OTER WERT 6 RONTRS (TYPE, DATE,' ARD D9917105 0F EACR)
Bone 2% TF SBUT 9055 AT EWD OF REPORT PERIOD, ESTINATED DATE OF STARTWP - 5/ A
NRC-86-124 WPSc4614] 433-12'14 TELEX 510'i012698 WPSC GR8 TELECOPIER [414]433-12b7 EASYUNK 62891993 wisCONSNW PUBUC SEmnCE_ CORPORATION 600 North Adams + RO. Box 19002. Green Bay, WI 54307-9002 September 10, 1986
- Director, Office of Inspection and Enforcement Attention Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Gentlemen:
Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Montnly Operating Report The narrative " Summary of Operating Experience" and completed forms covering plant and component availability for the Kewaunce Nuclear Power Plant for August 1986 are enclosed in accordance with Technical Specification 6.9.1(c).
Very truly yours,
.d D. C. Hintz Vice President - Nuclear Power WRC/jms Enc.
cc - Mr. J. G. Keppler, Reg Adm US NRC - Region III Mr. Robert Nelson, NRC Sr Resident Inspector RR #1, Box 999, Kewaunee, WI 54216 Mr. George Lear, PWR Project Directorate-1 US NRC, Washington, DC 20555 INP0 Records Center, Suite 1500, 1100 Circle 75 Parkway.