ML20084M420

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1984
ML20084M420
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 04/30/1984
From: Giesler C, Ruiter G
WISCONSIN PUBLIC SERVICE CORP.
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
CON-NRC-84-74 NUDOCS 8405150363
Download: ML20084M420 (5)


Text

.

DOCKET 50-305 KEW AU NEE NUCLEAR POWER PLANT

SUMMARY

OF OPERATING EXPERIENCE April, 1984 I

Cycle IX- X refueling outage OPERATIONS: Continued the throughout the month.

l MAINTENANCE: Surveillance testing, as required by Tech. Specs.,

is in progress.

Replaced a pressurizer level transmitter with an EQ transmitter.

-Peplaced several amplifiers in RCS pressure transmitters at manuf acturer's request.

Peplaced and/or repaired numerous valves in Plant systems as required.

f I

Pepaired an oil leak on a RHR pump actor.

Pepaired several defective breakers. ,

and re-routed cable for .

Installed equipment '

i Appendir R modifications.

Installed numerous Plant modifications.

1-

[

Inspected, and replaced as required, seals on a Reactor Coolant Pump.

I l

8405150363 840430 /

4f.

Y\

i PDR ADOCK 05000305 l

~

AY ER AGE DAILY UNIT POW ER LEV EL DOCKET NO- 50-305 ,

UNIT- KEW AUN EE l

COMPLETED BY- G. H. RUIT ER TELEPHONE- 414-388-2560 X225 BEPORT MONTH APRIL, 1984 l AVERAGE DAILY j DAY POWEB LEVEL l (MW E-N ET) l 1 0 2 0 l 3 0 4 0 5 0 C 0 7 0 3 8 0 9 0 0  ;

10 11 0 12 0 13 0 14 0 15 0 16 0 17 0 18 0 19 0 20 0 21 0 22 0 23 0 24 0 25 0  !

26 0 27 0 i

28 0 29 0 30 0 ,

t i

, -m-r ,-m. .~,.w - -,-- ---r--. , . - . -- -,.y

O '

)

OPER& TING DAT A AEPORT  ;

- /p g , J b DOCKET No- 50-305 COEPLETED BY- C. H. RUITER 'S D '

OPER & TING STATUS TELEPHO N E- 434-388-2560 I225

~

J 1 UNIT NAME KES AU N EE **********************************************

- * . g 2 REPCSTING PEBIOD APBIL, 1984

  • NOTES
  • v 3 LICINSED THERM AL POW ER (NUT) 1650
  • Continued Cycle II-I refueling out'ge.

a

  • g 4 NAMIFLATI RATING (GROSS MWE) 560 * *

. *

  • g 5 DESIGN ELECTRICAL RATING (NET MWE) 535 * *

- 6 MAIIEUM DEPEND AELE CAPACITY (GFOSS MWE) 529 *

  • j 7 MAIIMUM DEPENDABLE CAPACITY (NET MU E) 503 **********************************************

v 8 IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 TBROUGH 7) SINCE LAST BEPORT, GIVE RE ASONS J

Bone J

9 POWER LEVEL TO WHICH RESTRICTED, IF ANT (NET MUE) None 10 REASONS FOR RESTRICTIONS, IF ANY

,)

THIS MONTH TR-TO-DATE CU5DLATIVE 11 HOURS IN REPORTING PERIOD 719 2903 86568 v 12 NU MBER OF HOURS RE ACTOR W AS CRITICAL 0. 0 1823.7 73003.7 g 13 RE ACTOR RESERVE S BUT DOWN HOURS 0.0 0. 0 2330.5 14 HOURS GENER ATOR OW-LINE 0.0 1823.5 71635.8

%, 15 UNIT RESERVE SUTDOWN HOURS 0. 0 0. 0 10.0 ,j 16 GROSS THERM AL ENERGY GENER ATED (MWR) 0 2898189 111869275 u '

J 17 GBOSS ELECTRICAL ENERGY GENERATED ( M BH) 0 952300 36810400

- 18 NET ELECTRICAL ENERGY GENERATED ( MH H) 0 908523 35040559 ,)

19 UNIT SERTICE FACTOR 0. 0 62.8 82.8 ,

- s w

20 UNIT AV AILABILITY FACTOR 0.0 62.8 82.8 4

21 UNIT CAPACITY FACTOR (USING HDC NET) 0.0 62.2 77.8 J

22 UNIT C AP ACITY FACTOR (USING DER NET) 0.0 58.5 75.7 23 UNIT FORCED OUTAGE R ATE 0. 0 0. 0 3.8 L 24 SHUTDOWNS SCHEDULED OVER NEIT 6 BONTHS (TYPE, DATE, AND DURATION OF EACH) g None

! 25 IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED D ATE OF STARTUP - May 9, 1984 $

0: >

t.

O 'm 5 NIT SNUTD0W WS &ND F0WER REDUCTIONS DOCKET NO: 50-305 UNIT NAME: Kesaunee p DATE: May 1, 1984 COMPLETED BY: G. N. Poiter TELEPHONE: 414-388-2560 x225 C < R p REPORT MONTH - APPIL, 1984 3

i 'NO. l DATE iTYPE lDUR ATION}REASONiMETHODi LER NUMBER iSYS i COMPONENT l COMMENTS i

:  :  :  :  :  :  :  :  : 1 p 1 I I I I I I I I I I i 1 1 l ZZ l EZZZZ l 2. Consenced Cycle refueling outage l O I 2 1'3/16/841 S I 360.5 i C N/A II- I I I I I I I I i 1 1 (correction t duration en try.) 1 1 l l l l I 1 1 l l O l 2 I~

1 4/ 1/841 S I 719.0 1 C i 1 i N/A 3 ZZ l ZZZZZZ l 2. Continued Cycle II-I refueling outage. I I I I I I I I I I I I I I I I i 1 I I I I I O I I I I I I I I I I i I I I I I I I I I I I q l i I I I I I I I I I ,

1 I I I I I I i 1 I i 1 I I I I I I I I I I e i 1 l i I I I I I i 1 ,

I I I I I I i 1 1 I I I I I I I I I I I I; I e i I I I I I I I I i 1 ,

I I I I I I I I I i 1 1 I I I I I I I I I I e i I I I I I I I i i 1 ,

I I I I I I I I I I I I I I I I I I I I I I e i I I I l i I I I 1 1 ,

I I I I i 1 1 I I I 1 I I I I I I I I I I I r 1 I I I I I I I I I I ,

I I I I I I I I I I I I I I I I I I I I I I g i I I I I I I I I I I n i I I I I I I I I I I I i 1 1 I I I I I I I O  !  !  !  !  !  !  !  !  !  !  !

p TYPE REASON METMOD SYSTEM & COMPONENT CODES ,

F: Forced A-Equipment Failure (Explain) 1-9anual From NUREG-0161

( S: Scheduled B-Maintenance or Test 2-9anual Scran ,

C-Pefueling 3-Automatic Scram D-Regulatory Restriction 4-Continuations c '

E-Operator Training 6 License Eramination 5-Load Reductions 3

- F- Administrative 9-Other G-Operational Error (Explain) o rtordvn_morftotVP _ , _ _ _ . . . . _ . . _ _ m

NRC-84-74 WISCONSIN PUBLIC SERVICE CORPORATION P.O. Box 1200, Green Bay, Wisconsin 54305 May 10,1984 Director, Office of Inspection and Enforcement Attention Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Monthly Operating Report The narrative " Summary of Operating Experience" and completed forms covering plant and component availability for the Kewaunee Nuclear Power Plant for April 1984 are enclosed.

Very truly you ,

f .

C. W. Giesler Vice President - Power Production JGT/js Enc.

cc - Mr. J. G. Keppler, Reg Adm

! US NRC - Region III l Mr. Robert Nelson, NRC Sr Resident Inspector RR #1, Box 999, Kewaunee, WI 54216 Mr. S. A. Varga, Chief US NRC - Div. of Licensing l INPO Records Center, Suite 1500, 1100 Circle 75 Parkway, Atlanta, GA 30339 l

l