 '9      .

A VERAGE DAILY UNIT POW EB LEYEL DOCKET NO- 50-305 UNIT- KENAUNEE COMPLETED BY- G. H. RUITER TEIEPHONE- 414-388-2560 I225 BEPORT MONTH JANUARY, 1987 AVERAGE DAILY DAY POWER LEVEL (MBE-NET) 1 522 2 522 3 522 4 522 5 522 6 522 1 7 522 8 521 9 521 10 522 11 521 12 522 13 521 14 521 15 521 16 521 ' 17 521 18 521 19 526 20 522 21 522 22 522 23 517 24 522 25 525 26 522 27 517 28 522 29 521 30 526 l 31 522 Dk kOOfK7 87013j R 05000305

                                                                                                                -{ }}f
                                                                                                                                                         ~   .

U N IT S HUTD0 W N S A N D PO V EB B EDUCTIO ES DOCKET NC: 50-305

  • OBIT BARE: Kevasase DATE: Eebruary 2, 1987 COMPLETED BI: G. H. Beiter TELEPHONE: 414-388-2560 x225 REPORT MONTH - J ANU AEY, 1987 COMMENTS I NUMBER lSYS hCOMPONENT} I l 50. l DATE kTYPE "lD0 RATION lBEASONlMETHOElLER I  :

l l + 1 -+ l f i I I I i I I I I l No shutdowns or power reductions in January. I l I I I I i i i I I I I I I I I I I i I i 1 1 I I i I I i 1 1 1 1 I I i i l i I I I t i 1 I I I I I I I e i 1 I i l I I I I I I I i I I I I I I i l 1 i 1 1 I 1

 )         1        1       1           1     1         1              1 i              i                                                   l I     I         I              I                                                                             l
 )         i        I        I I               I         I              i i        I        I          I     I                                                                                                      l
 )                                                                      I          i              I
 )         i        I        I          I     l          i                                                                                           l I         I               I         I               i
 }         I        i        1          1 i                                                  1 I       I          I      l         i              I          I                                                                 i
 )          1 i          I              i I       I          i      1         l                                                                                            i 1          1 l       i          i      l         I              i          i              i                                                   I 1           i                                                           I         I              i I           I       I        i          1     1         1 I

I I I I I I i l i I I I I I I I I i I I I I I I I I i 1 I l I I I i i l i i i I 1 l 1 I i I I i l I i l I l I I I I I I I I I I I i i I I i i I i i i l 1 l I I I i i i l i i i i i i I i i i i i 1 I l I I I I I I I i 1 i 1 1 1 l I I I I i 1 I i l 1 I I I i 1 1 I 1 I I I I I l 1 1 I I 1 i 1 1 i i 1

                                                                           .l 1
                                                                                     .              I.
               .                I.         .

METHOD SYSTEM 6 COMPONENT CODES TYPE PEASON 1-Manual From NOREG-0161 F: Forced A-Pquipment Failure (Explain) 2-Manual Scras 5: Scheduled B-Maintenance or 1est 3-Automatic Scram C-Re f uel ing D-Regulatory Restriction 4-Continuations E-Operator Training G License Examination 5-Load Beductions F- Administrative 9-Other G-Operat ional Error (Explaint H-Other IExplaan)

OPE R AT I N C DATA REPOB T  ;* DOCEET W3- 50-305 COMPLETED BY- G. H. RUITER ,' ST &TUS TELEPHONE- 414-388-2560 1225 0PER ATI NG 1 UNIT NANF KEMADNEE 2 BEPORTING PERIOD JANUARY, 1987

  • NOTES
  • e 3 LTCENSED THERM AL POWER (MWT) 1650
  • Normal power operation continued *
  • through this reporting period.

As of the end of this reporting period

  • i 0 N A M E PL A TE RATING (GROSS nW E) 560 *

'

  • the unit has 262 consecutive days 535
  • of continuous operation.

5 DESIGN ELECTRICAL PATING (NET MWE)

  • 6 hAIIMUM DEPEND ABLE C APACITY (GPOSS MWE) 529
  • 7 MAXIMUM DEPE4D ADLE CAPACITY (NET MWE) 503 **********************************************

8 If CHANGES OCCUR IN CAPACITY RATINGS (ITIMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE BRASONS None 4 9 P03ER LEVEL TO WHICH RES1DICTED, IF ANT (NET MWE) None 10 REASGNS FOR RESTRICTIONS, IF ANY THIS MONTH YR-TO-DATE CUMULATIVE 744 744 110713 11 HOURS IN REPORTING PERIOD 744.0 744.0 94345.3 12 NUMBER OF HOUPS REACTOR WAS CRITICAL 0.0 0.0 2330.5 13 REACTOR RESERVE SHUTDOWN HOURS 744.0 744.0 92814.7 14 HOURS GENERATOR ON-LINE 0.0 0.0 10.0 i 15 UNIT RESERVE SHUTDOWN HOURS 1215680 1215680 146029394 l 16 GROSS THERM AL ENERGY GENEPATED (MWH) 406200 406200 48188800 17 GIOSS ELECTRICAL ENERGY GENERATED (MWH) 388069 388069 45883955 18 NET ELECTRICAL FNERGY GENERATED (MWH) 19 UNIT SERVICE FACTOR 100.0 100.0 83.8 100.0 100.0 83.8 l 20 G IT AVAILABILITT FACTOR 103.7 10 3.7 80.2 21 UNIT CAPACITY FACTOR (USING MDC NET) 97.5 97.5 77.5 , 22 U%IT CAPACITY FACTOR (USING DER NET) 0.0 0.0 3.1 21 UNIT roRCED OUT AGF PATE 24 SHUTDOWN S SCHEDUIED OV ER NEIT 6 MONTHS (1YPE, DATE, AND DURATION Of EACH) Refueling outage of 6-week duration is scheduled to start March 1, 1987.

        -    - - - - - .- -- a     n-  nenne, neston. PSTIM ATFD D ATE O F ST AR TUP - N/ A

DOCKET 50-305 KEW AUNEE NUCLEAR POWER PLANT

SUMMARY

OF OPERATING EXPERIENCE January, 1987 OPERATIONS: Reactor Coolant System boron concentration is less than 150 ppa; therefore, the turbine stop and governor valve test was not performed this month as allowed by Technical Specifications. MAINTENANCE: Plant Mechanics replaced the 'B' Charging Pump block due to cracking and seals in 'A' charging Pump due to leakage. Also, replaced bearings in the 'A' Control Roon A/C unit and 'B' Turbine Building Fan coil Unit due to excessive vibration. I S C did recalibration work on the 1B Boric Acid Tank Level Transmitter, Boric Acid Heat Tracing Circuit #1 and A pressurizer level histables. Also, replaced a temperature indicator for the 1A Aux Feed Pump bearing. Electricians installed thermocouples on the 1B Boric Acid Pump per a temporary change, replaced the Diesel Generator Differential Current Relays and performed several motor operated valve EC grease changes. 1 l l l 1

e. -

' ~ g NRC-87-15 WPSC(414] 433-1234 g f 3 TELEX 5101012698 WPSC GRB TELECOPIER[414] 433-1297 (.j EASYUNK 62891993 W M_M_ Y 600 North Adams

  • P.O. Box 19002 + Green Bay, WI 54307-9002 February 10, 1987 10 CFR 50.36 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Monthly Operating Report The narrative "Sununary of Operating Experience" and completed forms covering plant and component availability for the Kewaunee Nuclear Power Plant for January 1987 are enclosed in accordance with Technical Specification 6.9.1(c). Ver truly yours, M D. C. Hintz Vice President - Nuclear Power DJM/jms Enc. cc - US NRC - Region III Mr. Robert Nelson, NRC Sr Resident Inspector RR #1, Box 999, Kewaunee, WI 54216 INP0 Records Center, Suite 1500, 1100 Circle 75 Parkway, Atlanta, GA 30339 9 s\}}