DOCKET 50-305

.. x KEWAUNEE NUCLEAR POWER PLANT

SUMMARY

OF OPERATING EXPERIENCE May, 1981 OPERATIONS: On May 1, the' fuel shuffle was started.

On_May 9, the fuel shuffle was completed. ,

The annual' Diesel Generator blackout test was performed on May 10.

The Reactor Coolant System was filled and vented on May 25 but had to be drained again when Reactor Coolant Pump 1A seal leakoff flow could not be established.

on May 30, the Reactor Coolant System was again filled and vented; a pressurizer bubble was then established and the plant was taken to hot shutdown conditions.

The Reactor Coolant System integrity test was satisfactorily completed on May 31.

MAINTENANCE: The refueling outage was in progress during the entire month.

Surveillance and ISI testing as required by Tech. Specs. is in progress, r-Replaced a conoscal on a reacter head instrument port.

i Replaced an incore detector on the core mapping system.

Replaced a defective solenoid valve in n' sample line for a radiation monitor air sampler.

Replaced a rubber seal on a Spent Fuel Pool gate.

. Rebuilt a boric acid evaporator pump.

Repaired a containment fan coil unit leak.

Preventative maintenance on equipment is being performed.

l' B204070194 810611 i

- PDR ADOCK 05000305 R PDR

- . . . _ . .. .. _ . .-. _=. . . . . .. . _ .

A V ER AGE DAILY UN IT POW ER LEVEL .

l COCKET NO- 50-305

UNIT- KEWAUNEE COMPLETED BY- G..H. RUITER TELEPEONE- 414-388-2560 X225 i *

, BEFORT MONT E EAY, 1981 AVERAGE CAILY DA Y F0WEF' LEVEL q

. ( f.W E- N ET) i 1 0 -

2 0 .

3 0 4 0 5 0 6 0 .

7 0 8 0 9 0 10 0 4

11 0 12 0 13 0 14 0 15 0 16 0 17 0 18 0 19 0 20 0 21 0 l

22 0

' 23 0 I

24 0 25 0 26 0 27 0 23 0 29 0 30 0 31 0 i

ll j

L

L OPER & TIN G DATA B EF0R1 k"

DCCKET NO- 50-305 -

COEPLETED ST- G. R. RUITER O PER ATIN G STATUS TELEPHONE- 414-388-2560 I225 1 UNIT NAME KEWAUNEE **********************************************

b *

  • _

2 REPORTING PEPIOD MAY, 1981

  • NOTES The Cycle TI-VII Refueling *

.

  • Cutage continued thtogh the entire * '

3 LICENSEC THERM AL POWER (BET) 1650

  • reporting period. * -

4 NAEEfLATE RATING (GROSS MWE) 560 *

  • k- *
  • 5 DESIGN ELECTRICAL R ATING (N ET MW E) 535 *
  • 6 MAXINUM 9EPENDAELE CAPACITY (GROSS "WE) 545 * -

7 MAXIMUM DEPENTAELE CAPACITY (NET MWE) 522 **********************************************

8 IF CHANCES OCCUR IN CAP ACITY R ATIEGS (ITEMS NUMEIR 3 TERCUGB 7) SINCE LAST REPCRT, GITE REASONS g None g, 9 F0WER LEVEL TO WHICH RESTRICTED, IF ANT (NET MBE) None 10 REASCNS FOR R E S1R ICT IO NS , IF ANY

\,

THIS MCNTH TR-TO-C AT E CUBULATIVE II HOOSS IN REPORTING PIRIOD 744 3G23 61008

' 12 NU MBER CF HOUES REACTOR S AS CRITICA L 0. 0 2619.4 50944.7 -

13 RE ACTOR RESERVE SEUTDOWN ROURS 0.0 0.0 2330.5 14 HOURS GENER ATOR ON-LINE 0.0 2608.3. 49017.2 k" 15 UNIT RESERVE SUTDCWN HOURS 0.0 0.0 10.0 -

16 GROSS THERMAL ENERGY GENERATED (MUH) 0 4215448 76902672 17 GROSS ELECTRIC AL ENERGY GEN ERATED (MWR) 0 1384400 25378600 b

18 NET ELECTRICAL ENERGY GENERATEC (MW E) 0 1320221 24151191 -

19 UNIT SERVICE FACTOR 0.0 72.0 81.7 20 U NIT AV AIL ABILITY EACTOR 0.0 72.0 81.7

\"

21 UNIT CAPACITY PACTOR (U SI NG RDC NET) 0.0 69.8 75.6 -

22 UNIT CAP ACITY F ACTOR (USING DER EET) 0.0 68.1 74.0 23 UNIT FORCED OUTAGE BATE 0.0 1. 0

  • 5. 2

\"

24 SHUTDOENS SCHIDULID CTER NEIT 6 RONTHS (TIPE, CATE, AND DURATION CF EACH) >

None k' 25 IF SHOT DOWN AT END OF REPORT PERIOD, RSTIMATED D ATE OF STARTUP - June 5, 1981 -)

  • ~

p , y* ,, s. :s :< < g. --

J $

s v . v 4 '

..E 4- '. 'i 's , h . 4 t .

m e

m UN IT 5NUTDOW 3S AN D POSER R EDUCTION $

^

DOCEET WO: 50-305 CNIT N AME: Newaunee CATE: June 1, 1981 , 3 COMPLETED BY: C. R. Buiter

  • TELEPHONE: 414-388-2560 x225 m

n B EPO RT RO NT H - M A Y, 1981 m

} N O. l DATE iT7FE iDUR ATION}R EASORl 5ETHCDi LES 30MBER ISYSlCCHf0NENT} C055ERTS }

:  :  :  :  :  :  :  : 4 e 1 I l I i 1 1 I I I 'l m I o 1 5/ 1/81I S I 7as.0 1 C 1 4 I m/A I 22 1 222222 1 4. Continued Cycle TI-VII Befueling Outage. I I I I I I I I I I I I e i 1 I I i  ! I I I I I e i i I i i l I i I I I I I I I I I i 1 I I I p I * *
  • THE FOLLOUING IS A CORRECTICE TO THE FEEBUARY BIPORT * *
  • i i q l l I I I l l I I I I i 1 1 2/11/811 S I 0.0 I e 1 5 i W/A I HF I BT EIC H I 1. A loa d reduction to 4C1 power was taken to I c I J l i J l i I I I permit inspection of the Main Condenser water l .

I I i 1 1 I I i 1 1 bczes. One tube was plugged as a result of I i  !  ! I I I I I I I this f.nspecticn. I e  ! I I I I I I I I I I -

1 4 16/ 1/811 S I 120.7 1 C i 4 1 3/A I ZZ l ZZZZZZ l 4. Cycle TI-TII Refueling Outage was concluded I j i I I I I i i i I 6/6/81 at 0044 Hours. I e I I I I i l~ I I I I I -

t 5 1 6/ 6/811 F i 19.7 i A i 1 1 N/A I I I 5. The tu rbi ne was mannually tripted when a I I I a I I I i I i I high-pitched noise cainated from the area of a i e i I I I I I I I I I turbine bearing. Since power was above 105 the I .

I I I I I I I I I I reactor tripped autosatically when the turbine i l I I I I I I I I I was tripped. The noise mas caused by a Icese 1 lr I i ) i l l I I I I turbine shaft fla nge nut rubbing against the I -,

I I I i 1 I I I I I hcusing. I I I I I I I I I I I I

'e I i l i I I i i i i 1 -

1 I I I I I I I I I I I I I I I I I I I I I e i 1 1 I i 1 1 I I I I -

1 1 I I I I I I I I I I I I I I I I I I I I

! r- 1

.I .I .I .I .I .I

.I .I .I .I r TYPE SEASON MI1 HOC SYSTEM S COMP 05EET CODES . .

F: For ced A-Equipment Failure (Ex plain) 1-Manual From NOREG-0161 7, S:. Scheduled 1-Baintenance or Test 2-Manual Scra s , -

C-Fe f ue ling 3- Automatic S cram i D-Begulatory Restriction 4-Continuations

,e , ,, 1-Operator Training & License Examinatica 5-toad seducticas -

F- Ad minist rative 9-Other G-Cperational trrce (Explain) e H-Cther. [ Explain) . s

  • b n .

-