ML20012H953

From kanterella
Jump to navigation Jump to search
Forwards Issue 2,Rev 12 to Security Plan.Rev Submitted Due to Security Sys Upgrades (Ltp #29),reorganization & Completion of Perimeter Changes Necessitated by New Support Bldg & New Primary Access Point.Rev Withheld Per 10CFR73.21
ML20012H953
Person / Time
Site: Pilgrim
Issue date: 12/08/1995
From: Boulette E
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BECO-LTR-95-123, NUDOCS 9512180400
Download: ML20012H953 (2)


Text

_ _ . . _ _ - _ . . . _ . _ _ _ . _ _ _ . . _ _ _ _ . . _ . .. _

r SAFEGUARDS INFORMATION $

10CFR50.54(p)(2) '

@ l Boston Erknen j Pdgren Nuciear Power Staton Rocky Hdt Road Plymouth. Massachusetts 02360 ,

E. T. Boulette, PhD Senor Vce Prescent - Nuclear ,

December 8. 1995 BECo Ltr. #95-123 ,

U.S. Nuclear Regulatory Commission r Attention: Document Control Desk  !

Washington, DC 20555 Docket No. 50-293 l License No. DPR-35  !

Pilgrim Nuclear Power Station Secunty Plan. Issue 2. Revision 12 i

in accordance with 10CFR50.54(p)(2), Boston Edison Company is submitting Revision 12 to  !

the Pilgrim Station Secunty Plan. This revision is being submitted due to:

. Secunty System Upgrades (LTP #29), l

. Reorganization, l

. Completion of the perimeter changes necessitated by the new Support Building and the new primary access point, and

. An exemption regarding non-licensee employees and use of hand geometry system for access control (NRC approved 8/8/95).

These changes do not decrease the safeguards effectiveness of the Pilgnm Nuclear Power Station Security Plan and wera approved by the Operations Review Committee. The enclosed  ;

Revision 12 contains safeguards information and must be protected against unauthorized I disclosure in accordance with 10CFR73.21. j h D LL N.

E. T. Boulette, PhD ETB/MTUnas/SECPlan 1 Original and 3 copies E.' closure cc: See next page ENCLOSURE CONTAINS SAFEGUARDS

, INFORMATION. UPON SEPARATION l THIS PAGE IS DECONTROLLED. ,

-a s gGg SAFEGUARDS INFORMATION , (, 3 ,

9512180400 951208 [

l PDR ADOCK 05000M3 ppp

.._;.____.._.._____.__.~.._-_._-____.__..._-_._..___-.__...____._._._._

4  !

  • i SAFEGUARDS INFORMATION

(. t I  !

DCC Desk December 8, 1995 Page 2 cc: Mr. R. Eaton, Project Manager (w/o Enclosure)

Division of Reactor Projects - 1/II Mail Stop: 14D1  ;

U. S. Nuclear Regulatory Commission l 1 White Flint North  ;

11555 Rockville Pike l Rockville, MD 20852 U.S. Nuclear Regulatory Commission (Two Copies)

Region 1  ;

475 Allendale Road )

King of Prussia, PA 19406 Senior Resident inspector (w/o Enclosure)

Pilgrim Nuclear Power Station l 1

l I

I i

I l

ENCLOSURE CONTAINS SAFEGUARDS INFORMATION. UPON SEPARATION THIS PAGE IS DECONTROLLED.

1 l SAFEGUARDS INFORMATION l

-. -. . _