Monthly Operating Rept for Jan 1981
ML19345F273
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 02/06/1981
From: Ruiter G
WISCONSIN PUBLIC SERVICE CORP.
To:
Shared Package
ML111661467 List:
References
NUDOCS 8102170086
Download: ML19345F273 (4)


Text

.

4 DOCKET 50-305 KEWAUNEE NUCLEAR ECWEE PLANT SUMBARY OF OPERATING EIPERIENCE JANUAHI, 1981 OPERATIONS: On January 21, speed control was lost to Beater Drain Pump 18. Unit load was reduced to 90% for repairs. The unit was returned to full Icad en January 21.

. 5AINTENANCE: A sticking relay in a service water strainer control circuit was replaced.

Replaced a tenperature controller for a control room air conditioning unit.

Beplaced a defective summer for overpower setpoint calcu latio n.

~

Replaced a seal on a vaste gas compressor.

Beplaced a check valve in an air line for diesel generator air start acters.

Replaced a cracked motor housing on a component cocling valve.

8102170036 g .,,.g- -

AV ER AGE DAILY UNIT PO W ER LEYEL DCCKET NO- 50-305 UNIT- KEHAUNEE COMPLETED BY- G. H. HUITER TELEPHONE- 414-388-2560 X225 REPORT MONTH JANUABY, 1981 AVERAGE DAILY DAY POWER LEVEL (M W E-N ET) 1 522 2 5 18 3 518 4 514 5 517 6 514 7 518 8 514 9 514 10 518 -

11 514 12 518 13 518

~

14 518 15 5 18

- 16 522

. 17 518 18 5 18 19 521 20 518 21 509

. 22 5 18 ,

23 522 24 518 25 518 26 517 27 522 28 518 29 514 30 518 31 5 17 l

v g = -

--9 ,=

9 -. -w-- , - -,~, .r ,-- -- , , - - -,

/

0 PE k AT I N G D A T& B EPO B T DOC IIET MO- 50-305

  • COM PL ET ED BI- G. B. BUITER 4 0 P EB A TI NG ST&TU S TELEPHOME- 414-188-2560 I225 2 g 1 UNIT Mast EEWAUMEE **********************************************
  • I 2 BEPONTING PERIOD JANUART, 1981
  • WOTES Unrestricted unit operations for
  • O
  • the entire reporting period.
  • 3 LICEtSED THE6M AL POWEB (NWT) 1650 *
  • I *
  • e 4 N AMEfL ATE B ATING (GBOSS EW E) 560 *
  • 5 DESIGN ELECTRIC AL B ATING (M ET MWE) 535 *
  • O 6 BAII505 DEPEND &EL E CAP ACITT (GBOSS 5WE) 545 * *
  • e 7 MAIIBU8 DEPENDABLE CAPACITT (WET nW E) 522 **********************************************

8 I F Cll& N G tS OCCU B IN CAPACITT BATINGS (ITE8S BusBER 3 THBOUGH 7) StuCt LAST BEPORT, GIVE BEASous O Mone I e 9 POWEB LEVEL TO WHICH RESTBICTED, IF ABT (HET EME) None

' 10 BE ASCNS 10B BES1BICTIOES, IF ABY O

I $

THIS 50MTU TB-TO-DATE CD5DLATIVE I

II HOURS IN BEFORTING PEBIOD 744 744 58829 0 g

12 NUMBER OF HOUBS BEACTOR WAS CBITICAL 744.0 744.0 49066.6 13 BEACTOR BESERVE SHUTDOWN HOURS 0.0 0. 0 2330.5 14 HOURS GENEBATOS ON-LINE 744.0 744.0 47952.9  % 0 (CC9 15 UNIT SESEMVE SUTDOWN HOUBS 0.0 0. 0 10.0

, g 16 GBOSS THEBa&L ENERGY GEN tB ATED (HWH) 1223429 1223429 73910653 17 GROSS ELECTBICAL ENERGY GENES &TED ( H U H) 402700 402700 24396900 0 y IS NET ELECTBICAL IMIBGI GIMtBATED (5W 8) 385002 305002 23215972 g 19 UNIT SERVICE FACTCB 100.0 100.0 82.5 EU 1

20 UNIT AVAILABILITI FACTOR 100.0 100.0 82.5 S u o e g 21 UNIT CA PACITY F ACTOR (USING 5DC NET) 99.1 99. 1 76.2 T 22 UNIT CAPACITY FACTOR (USING DER utT) 96 7 96.7 74.7 i

23 UJIT FOBCED OUT AGt B ATE 0.0 0. 0 5.4 P" .

3 24 SHUTDOWNS SCHEDULED OVEB NEIT 6 80dTHS (TT P E, DATE, AND DUBATION OF E AC H) g Belueling shutdova of 6-week duration scheduled to start April 18, 1981.

g 25 IF SHUT DOWN AT END OF BtPORT PEBIOD, ESTIM ATED DATE OF STARTUP - 3/A g

~

D -

O g U N IT S It UTD0W NS & 5 D PON EB B EDDCTIO NS g DOCKET 50: 50-305

  • I 031T NAME: Kewaunee DATE: January 2, 1988 COMPLETED BT: G. H. Reiter g TELEPHONE: 484-388-2560 m225 g REPORT A0578 - JREUART, 1985

) G l NO. I DATE lTTPE } DUB ATIONlRE ASONl BETI10Dl LE S NUM BER l S TS l COBPONENT l 0)MSENTS I

) I i I l- I I l I I I {

i i i e i i I i i I g

a 1 i i 1 1 1 1 1 1 I uo shutdowns during the sonth of J450&BT. I y i I I I I I I I I I I i I i i i 1 1 I I I g I

I I i i i I i 1 1 1 1 y i i 1 1 I I I I I i i i l i l I i i i I 1 g I

i I I I I I I I I i 1 g i i i i l i a i 1 i i i i i i I I i 1 1 g

1 I I i 1 1 1 I I i a I i g i 1 i 1 1 I I I I I I i i i i i i i a i i g i

i i i i 1 i i i i I I y i I I I I I i 1 1 I I i 1 1 I I i e i i 1 g

I i 1 1 1 1 1 I I I I y 1 i i i i i l 1 i i I i i i i i 1 I I I i g

i a I i l i I I I I I y i I I I I I I I I I I i i i l i I I I I I I g

I I i 1 i I I a 1 i i i I i i 1 1 1 1 I i 1 l i i i i i i i i i io*

1 l

1 l 1 l  !

I I

I I

I I

I lO I

g I

i I I i

I i

i i

i i l i i ig g a I l- 1 I I I l g

!  !  !  !  !  !  !  !.  ! !G 9 TTPE REASON RETHOD SISTEM & COMPOBERT CODES g F: Forced A-Equipment Failure (E xpla in) I-nanual Prom NOBEG-0161 S: Scheduled B-eaintenance or Test 2-Manual Scram g 3

C-Refueling C-Regulatory Restriction 3-Automatic Scram 4-Continuations 7M E-operat or Training & License Examination F-Administrative 5-Load seductions 9-0.ther hO 3 G-Operational Error (Ex pla in)

H-Other IIxplain) '

i t