MONTHYEARCP-202400030, License Renewal Application Revision 0 - Supplement 3, Revision 12024-01-31031 January 2024 License Renewal Application Revision 0 - Supplement 3, Revision 1 IR 05000445/20230042024-01-29029 January 2024 Integrated Inspection Report 05000445/2023004 and 05000446/2023004 CP-202400034, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1)2024-01-29029 January 2024 (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1) ML24024A2102024-01-29029 January 2024 Summary of Regulatory Audit Regarding a License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML24025A0052024-01-25025 January 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report ML24023A0242024-01-24024 January 2024 Correction to Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident Methodology ML24018A1072024-01-18018 January 2024 Notification of Commercial Grade Dedication Inspection (05000445/2024012 and 05000446/2024012) and Request for Information ML23159A2082023-12-20020 December 2023 Request for Withholding Information from Public Disclosure ML23319A3872023-12-20020 December 2023 Issuance of Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident (Fsloca) Methodology ML23348A2392023-12-19019 December 2023 Nonacceptance of License Amendment Request to Relocate Technical Specification 3.9.3, Nuclear Instrumentation, to the Technical Requirements Manual CP-202300575, (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 22023-12-13013 December 2023 (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 2 ML23333A0872023-12-13013 December 2023 Transmittal of Dam Safety Inspection Report - Public CP-202300566, (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation2023-12-12012 December 2023 (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation CP-202300494, License Renewal Application Revision 0, Supplement 32023-12-0606 December 2023 License Renewal Application Revision 0, Supplement 3 ML23313A0732023-12-0606 December 2023 Issuance of Amendment Nos. 184 and 184 Regarding Revision to Technical Specifications to Implement WCAP-17661-P-A, Rev. 1, Improved Roac and CAOC Fq Surveillance Technical Specifications ML23291A4382023-11-30030 November 2023 Notice of Availability of the Draft Plant-Specific Supplement 60, to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Comanche Peak Nuclear Power Plant, Unit Numbers 1 and 2, License Renewal Applica ML23325A0182023-11-30030 November 2023 Schedule Revision for the License Renewal Application Review IR 05000445/20234022023-11-30030 November 2023 NRC Security Inspection Report 05000445/2023402 and 05000446/2023402 CP-202300349, License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation2023-11-20020 November 2023 License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation ML23308A0032023-11-17017 November 2023 Letter to R. Nelson, Executive Director; Achp; Re., Comanche Peak Draft Environmental Impact Statement ML23308A0022023-11-17017 November 2023 Letter to M. Wolfe, Executive Director; Shpo; Re., Comanche Peak Draft Environmental Impact Statement ML23317A3002023-11-13013 November 2023 Letter to R. Sylestine, Chairman, Alabama-Coushatta Tribe of Texas Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2972023-11-13013 November 2023 Letter to R. Martin, President, Tonkawa Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2872023-11-13013 November 2023 Letter to J. Garza, Chairman, Kickapoo Traditional Tribe of Texas Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2832023-11-13013 November 2023 Letter to D. Dotson, President, Delaware Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2852023-11-13013 November 2023 Letter to E. Martinez, President, Mescalero Apache Tribe Regarding Comanche Peak Draft Environmental Impact Statement ML23306A0302023-11-13013 November 2023 Letter to J. Cernek, Chairman; Coushatta Tribe of Louisiana Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2902023-11-13013 November 2023 Letter to M. Pierite, Chairman, Tunica Biloxi Tribe of Louisiana Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2982023-11-13013 November 2023 Letter to R. Morrow, Town King, Thlopthlocco Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2842023-11-13013 November 2023 Letter to D. Kaskaske, Chairman, Kickapoo Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2822023-11-13013 November 2023 Letter to D. Cooper, Chairman, Apache Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2962023-11-13013 November 2023 Letter to M. Woommavovah, Chairman, Comanche Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2812023-11-13013 November 2023 Letter to C. Hoskin, Principal Chief, Cherokee Nation; Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2862023-11-13013 November 2023 Letter to J. Bunch, Chief, United Keetoowah Band of Cherokee Indians Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3032023-11-13013 November 2023 Letter to W. Yargee, Chief, Alabama-Quassarte Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2882023-11-13013 November 2023 Letter to L. Johnson, Chief, Seminole Nation of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3012023-11-13013 November 2023 Letter to S. Yahola, Mekko, Kialegee Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2792023-11-13013 November 2023 Letter to B. Gonzalez, Chairman, Caddo Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3022023-11-13013 November 2023 Letter to T. Parton, President, Wichita and Affiliated Tribes Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2892023-11-13013 November 2023 Letter to L. Spottedbird, Chairman, Kiowa Indian Tribe Regarding Comanche Peak Draft Environmental Impact Statement ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23360A6312023-10-26026 October 2023 FEMA, Submittal of Radiological Emergency Preparedness Final Report for the Comanche Peak Nuclear Power Plant Medical Services Drill Evaluated on August 23, 2023 CP-202300416, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-10-12012 October 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202300432, Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 42023-10-0404 October 2023 Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 4 ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23263A0242023-09-21021 September 2023 Revision of Schedule for the Environmental Review of the Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal Application 2024-01-31
[Table view] Category:License-Operator
MONTHYEARML23262A9942023-06-22022 June 2023 CP-2023-06 Public Forms ML23226A2342023-06-22022 June 2023 Post Exam Comments and Analysis with Letter CP-202200219, (Cpnpp), NRC Form 536, Operator Licensing Examination Data for Calendar Years 2023, 2024, 2025, and 20262022-05-18018 May 2022 (Cpnpp), NRC Form 536, Operator Licensing Examination Data for Calendar Years 2023, 2024, 2025, and 2026 ML21299A0192021-09-23023 September 2021 2021-08-DRAFT Outline Comments ML21285A0392021-09-23023 September 2021 CP-2021-08-Post Exam Comments ML21299A0452021-09-23023 September 2021 CP-2021-08-Public Forms ML21285A0372021-09-23023 September 2021 CP-2021-08-FINAL Operating Test ML21299A0252021-09-23023 September 2021 CP-2021-08-FINAL Outlines ML21299A0202021-09-23023 September 2021 CP-2021-08-DRAFT Outlines ML21299A0212021-09-23023 September 2021 CP-2021-08-DRAFT Written Exam Comments ML21299A0222021-09-23023 September 2021 CP-2021-08-DRAFT Written Exam ML21299A0232021-09-23023 September 2021 CP-2021-08-FINAL Make Up Op Test Outlines ML21299A0242021-09-23023 September 2021 CP-2021-08-FINAL Make Up Op Test ML21299A0182021-09-23023 September 2021 CP-2021-08-DRAFT Operating Test ML21299A0152021-09-23023 September 2021 CP-2021-08-DRAFT Make Up Op Test Outlines ML21299A0162021-09-23023 September 2021 CP-2021-08-DRAFT Make Up Op Test ML21299A0172021-09-23023 September 2021 CP-2021-08-DRAFT Operating Test Comments ML21299A0142021-09-23023 September 2021 CP-2021-08-DRAFT Make Up Op Test Outline Comments ML21285A0382021-09-23023 September 2021 CP-2021-08-FINAL Written Exam ML21299A0132021-09-23023 September 2021 CP-2021-08-DRAFT Make Up Op Test Comments CP-202100570, (CPNPP) - Initial Operator Licensing Examination2021-08-24024 August 2021 (CPNPP) - Initial Operator Licensing Examination CP-202100559, (CPNPP) - Initial Operator Licensing Examination2021-08-17017 August 2021 (CPNPP) - Initial Operator Licensing Examination ML20174A6052020-05-21021 May 2020 05 Draft Outline Comments ML20174A6072020-05-21021 May 2020 05 Draft Written Examination Comments.Pdf ML20174A6102020-05-21021 May 2020 05 Final Written Examination ML20174A6062020-05-21021 May 2020 05 Draft Outlines ML20174A6092020-05-21021 May 2020 05 Final Outlines ML20174A6082020-05-21021 May 2020 05 Draft Written Examination ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18309A3502018-11-0505 November 2018 Notification of NRC Initial Operator Licensing Examination 05000445/2018301 and 05000446/2019301 IR 05000445/20183012018-11-0505 November 2018 Notification of NRC Initial Operator Licensing Examination 05000445/2018301 and 05000446/2019301 ML18157A0602018-06-0606 June 2018 NRC Initial Operator Licensing Examination Approval 05000445/2018301; 050000446/2018301 CP-201800217, Transmittal of NRC Form 536, Licensed Operator Examination Data2018-04-18018 April 2018 Transmittal of NRC Form 536, Licensed Operator Examination Data ML18086B0842018-02-16016 February 2018 Facility Cover Letter - Riv - March 2018 - GFE ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17179A0032017-06-19019 June 2017 2017-06-DRAFT Operating Test Comments ML17179A0072017-06-19019 June 2017 2017-06-DRAFT Written Exam Comments ML17179A0062017-06-19019 June 2017 2017-06-DRAFT Outlines ML17179A0052017-06-19019 June 2017 2017-06-DRAFT Outline Comments ML17198B2822017-06-19019 June 2017 2017-06-Public Forms ML17179A3462017-06-19019 June 2017 2017-06-Post Examination Comments ML17179A0102017-06-19019 June 2017 2017-06-FINAL Outlines ML17179A0082017-06-19019 June 2017 2017-06-DRAFT Written Exam ML17179A0112017-06-19019 June 2017 2017-06-FINAL Written Exam CP-201700402, Response to RIS 2017-032017-04-28028 April 2017 Response to RIS 2017-03 ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML16262A0372016-07-18018 July 2016 2016-07 Final Operating Test 2023-06-22
[Table view] Category:Other HQ and Regional Correspondence
[Table view] |
Text
July 7, 2010 Rafael Flores, Senior Vice President and Chief Nuclear Officer Attention: Regulatory Affairs Luminant Generation Company LLC Comanche Peak Nuclear Power Plant P.O. Box 1002 Glen Rose, TX 76043
SUBJECT:
COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NRC INITIAL OPERATOR LICENSING EXAMINATION APPROVAL 05000445/2010302; 05000446/2010302
Dear Mr. Flores:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Comanche Peak Nuclear Power Plant.
The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Garry Struble, Operations Training Supervisor. Note that any examination waivers and applications denials have been addressed in separate correspondence.
The NRC has approved the subject examinations. The NRC staff will administer the operating tests during the week of July 6, 2010. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (817) 860-8159.
Please contact your Chief Examiner, Kelly Clayton, at (817) 860-8216, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant. Sincerely,
/RA/ Mark S. Haire, Chief Operations Branch Division of Reactor SafetyUNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125 Luminant Generation Company LLC Dockets: 50-445; 50-446 Licenses: NPF-87; NPF-89
Enclosure:
ES-201-4 cc w/enclosure:
Garry Struble, Supervisor Operations Training Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX 76043-1147
cc w/o enclosure Mr. Fred W. Madden, Director Oversight and Regulatory Affairs Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX 76043 Timothy P. Matthews, Esq. Morgan Lewis 1111 Pennsylvania Avenue, NW Washington, DC 20004 County Judge P.O. Box 851 Glen Rose, TX 76043 Mr. Richard A. Ratliff, Chief Bureau of Radiation Control Texas Department of Health P.O. Box 149347, Mail Code 2835 Austin, TX 78714-9347 Environmental and Natural Resources Policy Director Office of the Governor P.O. Box 12428 Austin, TX 78711-3189 Honorable Walter Maynard County Judge P.O. Box 851 Glen Rose, TX 76043 Mr. Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 Austin, TX 78711-3326 Luminant Generation Company LLC Ms. Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087 Anthony Jones Chief Boiler Inspector Texas Department of Licensing And Regulation Boiler Division E.O. Thompson State Office Building P.O. Box 12157 Austin, TX 78711 Chief, Technological Hazards Branch FEMA Region VI 800 North Loop 288 Federal Regional Center Denton, TX 76209
Luminant Generation Company LLC Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Chuck.Casto@nrc.gov) DRP Director (Dwight.Chamberlain@nrc.gov) DRP Deputy Director (Anton.Vegel@nrc.gov) DRS Director (Roy.Caniano@nrc.gov)
DRS Deputy Director (Troy.Pruett@nrc.gov) Senior Resident Inspector (John.Kramer@nrc.gov) Resident Inspector (Brian.Tindell@nrc.gov) Branch Chief, DRP/A (Wayne.Walker.nrc.gov) Senior Project Engineer, DRP/A (David.Proulx@nrc.gov)
Project Engineer, DRP/A (Nick.Hernandez@nrc.gov) Project Engineer, DRP/A (Laura.Micewski@nrc.gov) CP Administrative Assistant (Sue.Sanner@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Balwant.Singal@nrc.gov) Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource
ADAMS: Yes X SUNSI Review Complete Reviewer Initials: lah X Publicly Available X Non-Sensitive LA:OB SOE:OB C:OB LAHurley KEClayton MSHaire /RA/ /RA/ /RA/ 06/24/10 06/25/10 06/28/10 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax