IR 05000250-11-403, 05000251-11-403, on 01/27/2011, Turkey Point Nuclear Power Plant - NRC Physical Security Inspection.=
ML110560857
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/25/2011
From: Munday J T
Division of Reactor Safety II
To: Nazar M
Florida Power & Light Co
References
Download: ML110560857 (4)


Text

February 25, 2011

Enclosure (s) transmitted herewith contain(s) SUNSI. When separated from enclosure(s), this transmittal document is decontrolled. ` Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT: TURKEY POINT NUCLEAR POWER PLANT - NRC PHYSICAL SECURITY INSPECTION REPORT 05000250/2011403 AND 05000251/2011403

Dear Mr. Nazar:

On January 27, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Turkey Point Nuclear Power Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on January 27, 2011, with Mr. M. Kiley and members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings were identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. FP&L 3 In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC

=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.Otherwise, mark your entire response ASecurity-Related Information BWithhold Under 10 CFR 2.390

@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,/RA/ Joel T. Munday, Director Division of Reactor Safety Docket No.: 50-250 and 50-251 License No.: DPR-31 and DPR-41

Enclosure:

Inspection Report 05000250, 251/2011403

w/Attachment:

Supplemental Information cc w/encl.: (See page 3) FP&L 3 cc w/Encl:

cc w/Inspection Summary Michael Kiley Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW 344th Street Florida City, FL 33035 Brent Rittmer Security Manager Turkey Point Nuclear Plant Florida Power & Light Company 9760 SW 344th Street Florida City, FL 33035

ML 110560857 X SUNSI REVIEW COMPLETE OFFICE RII:DRS/PSB2 RII:DRS RII:DRP/BR3 RII: SIGNATURE R A R A R A NAME J. Wallo J. Munday D. Rich DATE 02/23/2011 02/25/2011 02/24/2011 E-MAIL COPY YES NO YES NO YES NO YES NO YES NO YES NO