IR 05000250-11-402 & 05000251-11-402, and Notice of Violation, on 05/30/11, Turkey Point
ML111800515
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/29/2011
From: Rich D
Division Reactor Projects II
To: Nazar M
Florida Power & Light Co
References
EA-11-156 IR-11-402
Download: ML111800515 (6)


Text

June 29, 2011

SUBJECT:

TURKEY POINT NUCLEAR PLANT - MATERIAL CONTROL AND ACCOUNTING (MC&A) INSPECTION REPORT 05000250/2011402, 05000251/2011402 AND NOTICE OF VIOLATION

Dear Mr. Nazar:

On May 30, 2011, the US Nuclear Regulatory Commission (NRC) completed an inspection at your Turkey Point Units 3 and 4. The enclosed inspection report documents the inspection results, which were discussed on June 10, 2011, with Mr. Kiley and other members of your staff.

The material enclosed contains Security-Related information as defined by 10 CFR 2.390(d)(1)

and should be withheld from public disclosure.

The inspection examined activities conducted under your license, as they relate to material control and accountability, to confirm compliance with the commissions rules and regulations and the conditions of your license. Within these areas, the inspection consisted of selected examination of procedures and records, observations of activities, and interviews with personnel. Based on the results of this inspection, the NRC has identified an issue that was evaluated under the risk significance determination process as having very low safety significance (Green). The NRC also identified one violation associated with this issue.

The violation was evaluated in accordance with the NRC Enforcement Policy. The current Enforcement Policy is included on the NRCs Web site at (http://www.nrc.gov/about-nrc/regulatory/enforcement/enforce-pol.html). The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances surrounding it is described in detail in the subject inspection report. The violation is cited because not all of the criteria specified in the NRC Enforcement Policy for a non-cited violation were satisfied. Specifically, Florida Power and Light failed to restore compliance within a reasonable time after the violation was first identified in NRC Inspection Report 50-250, 251/2007-201. 2 The NRC has concluded that information regarding the reason for the violation, the corrective actions taken and planned to correct the violation and prevent recurrence, and the date when full compliance was achieved is already adequately addressed in the enclosed inspection report. Therefore, you are not required to respond to this letter unless the description herein does not accurately reflect your corrective actions or your position. In that case, or if you choose to provide additional information, you should follow the instructions specified in the enclosed Notice.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390 (b)(1).

Sincerely,

/RA/

Daniel W. Rich, Chief

Reactor Projects Branch 3

Division of Reactor Projects

Docket Nos. 50-250, 50-251 License Nos. DPR-31, DPR-41

Enclosures: Inspection Report 05000250/2011402, 05000251/2011402

w/Attachment: Supplemental Information (Security-Related Information)

Notice of Violation (Security-Related Information)

cc w/encl: (See next page)

_ML111800515______

X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:EICS RII:DRP

SIGNATURE GJW DWR1 SES JSS1 by email

NAME GWilson DRich SSparks S. Stewart

DATE 06/23/2011 06/29/2011 06/24/2011 06/28/2011

E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO 3 cc w/encl:

Michael Kiley Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW 344th Street Florida City, FL 33035

Brent Rittmer Security Manager Turkey Point Nuclear Plant Florida Power & Light Company 9760 SW 344th Street Florida City, FL 33035

cc w/o encl:

Alison Brown Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution

Larry Nicholson Director Licensing Florida Power & Light Company Electronic Mail Distribution

Michael Kiley Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution

Niel Batista Emergency Management Coordinator Department of Emergency Management and Homeland Security Electronic Mail Distribution

Robert J. Tomonto Licensing Manager Turkey Point Nuclear Plant Florida Power & Light Company Electronic Mail Distribution

Eric McCartney Plant General Manager Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution

Mitch S. Ross Vice President and Associate General Counsel Florida Power & Light Company Electronic Mail Distribution

Marjan Mashhadi Senior Attorney Florida Power & Light Company Electronic Mail Distribution

William A. Passetti Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution

Ruben D. Almaguer Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution

Mano Nazar Executive Vice President and Chief Nuclear Officer Nuclear Division Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408

Senior Resident Inspector Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission 9762 SW 344th St.

Florida City, FL 33035

cc w/o encl. (continued next page) 4 cc w/o encl. (continued)

Attorney General Department of Legal Affairs The Capitol PL-01 Tallahassee, FL 32399-1050

Mike A. Shehadeh, P.E.

City Manager City of Homestead Electronic Mail Distribution

County Manager of Miami-Dade County 111 NW 1st Street, 29th Floor Miami, FL 33128

Gene St. Pierre Vice President, Fleet Support Florida Power & Light Company Electronic Mail Distribution 5 Letter to Mano Nazar from Daniel W. Rich dated June 29, 2011

SUBJECT:

TURKEY POINT NUCLEAR PLANT - MATERIAL CONTROL AND ACCOUNTING (MC&A) INSPECTION REPORT 05000250/2011402, 05000251/2011402 AND NOTICE OF VIOLATION

Distribution w/encl:

C. Evans, RII EICS L. Douglas, RII EICS OE Mail RIDSNRRDIRS RidsNrrPMTurkeyPoint Resource