IR 05000250/2011403
| ML110560857 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 02/25/2011 |
| From: | Joel Munday Division of Reactor Safety II |
| To: | Nazar M Florida Power & Light Co |
| References | |
| Download: ML110560857 (4) | |
Text
February 25, 2011
SUBJECT:
TURKEY POINT NUCLEAR POWER PLANT - NRC PHYSICAL SECURITY INSPECTION REPORT 05000250/2011403 AND 05000251/2011403
Dear Mr. Nazar:
On January 27, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Turkey Point Nuclear Power Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on January 27, 2011, with Mr. M. Kiley and members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. FP&L 3 In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.Otherwise, mark your entire response ASecurity-Related InformationBWithhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/
Joel T. Munday, Director Division of Reactor Safety
Docket No.: 50-250 and 50-251 License No.: DPR-31 and DPR-41
Enclosure:
Inspection Report 05000250, 251/2011403 w/Attachment: Supplemental Information
cc w/encl.: (See page 3) FP&L 3 cc w/Encl:
cc w/Inspection Summary Michael Kiley Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW 344th Street Florida City, FL 33035
Brent Rittmer Security Manager Turkey Point Nuclear Plant Florida Power & Light Company 9760 SW 344th Street Florida City, FL 33035
ML110560857 X SUNSI REVIEW COMPLETE OFFICE RII:DRS/PSB2 RII:DRS RII:DRP/BR3
RII:
NAME J. Wallo J. Munday D. Rich
DATE 02/23/2011 02/25/2011 02/24/2011
E-MAIL COPY YES NO YES NO YES NO YES NO YES NO YES NO