IR 05000250/2011006

From kanterella
Jump to navigation Jump to search
Mid-Cycle Performance Review and Inspection Plan for Turkey Point Inspection Report 05000250-11-006 05000251-11-006 (DRS)
ML112440362
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/01/2011
From: Rich D
NRC/RGN-II/DRP/RPB3
To: Nazar M
Florida Power & Light Co
Shared Package
ML112440358 List:
References
IR-11-006
Download: ML112440362 (5)


Text

September 1, 2011

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - TURKEY POINT NUCLEAR PLANT UNIT 3 AND UNIT 4 (NRC INSPECTION REPORT 05000250/2011006 AND 05000251/2011006)

Dear Mr. Nazar:

On August 10, 2011, the NRC staff completed its performance review of the Turkey Point Nuclear Plant. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2010, through June 30, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.

The NRC determined the performance at Turkey Point Unit 3 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP)

Action Matrix because all inspection findings had very low (i.e., green) safety significance and all PIs indicated performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The NRC determined the performance at Turkey Point Unit 4 during the last three quarters of the assessment period was within the Regulatory Response Column of the NRCs ROP Action Matrix because of one White Performance Indicator in the Initiating Events Cornerstone, Unplanned Scrams per 7000 Critical Hours, which was identified in the fourth quarter of 2010.

On July 15, 2011, the NRC completed a supplemental inspection in accordance with inspection procedure 95001, and confirmed that the licensee had adequately addressed the White PI. As a result, the NRC determined the performance at Turkey Point Unit 4 returned to the Licensee Response Column of the ROP Action Matrix as of August 4, 2011. Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2012.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last nine months of the inspection plan are tentative and may

FPL

be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In the days following the Fukushima Daiichi nuclear accident in Japan, the Commission directed the staff to establish a senior-level agency task force to conduct a methodical and systematic review of the NRCs processes and regulations to determine whether the agency should make additional improvements to its regulatory system. The NRC has since completed Temporary Instruction (TI) 183, Follow-up to Fukushima Daiichi Nuclear Station Fuel Damage Event, and TI-184, Availability and Readiness Inspection of Severe Accident Management Guidelines (SAMGs) at your facility. Results of these inspections can be found here:

http://www.nrc.gov/japan/japan-activities.html. Additionally, on May 11, 2011, the agency issued NRC Bulletin 2011-01, Mitigating Strategies, to confirm compliance with Order EA-02-026, subsequently imposed license conditions, and 10 CFR 50.54(hh)(2), and to determine the status of licensee mitigating strategies programs. On July 12, 2011, the NRCs Task Force made its recommendations to the Commission in its report, Recommendations for Enhancing Reactor Safety in the 21st Century: The Near-Term Task Force Review of Insights from the Fukushima Daiichi Accident. The NRC is currently reviewing the Task Forces recommendations to determine what additional actions may be warranted.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (404) 997-4721 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Daniel W. Rich, Chief Reactor Projects Branch 3 Division of Reactor Projects

Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41

Enclosure: Turkey Point Nuclear Plant Inspection/Activity Plan (09/01/11 - 12/31/12)

PKG.: ML112440358___

X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRP RII:DRP

SIGNATURE GJW DWR1

NAME GWilson DRich

DATE 08/31/2011 09/01/2011

E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO

FPL

cc w/encl:

Alison Brown Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution

Larry Nicholson Director Licensing Florida Power & Light Company Electronic Mail Distribution

Michael Kiley Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution

Niel Batista Emergency Management Coordinator Department of Emergency Management and Homeland Security Electronic Mail Distribution

Robert J. Tomonto Licensing Manager Turkey Point Nuclear Plant Florida Power & Light Company Electronic Mail Distribution

Eric McCartney Plant General Manager Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution

Mitch S. Ross Vice President and General Counsel Nuclear Florida Power & Light Company Electronic Mail Distribution

Marjan Mashhadi Senior Attorney Florida Power & Light Company Electronic Mail Distribution

William A. Passetti Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution

Ruben D. Almaguer Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution

Senior Resident Inspector Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission 9762 SW 344th St.

Florida City, FL 33035

Attorney General Department of Legal Affairs The Capitol PL-01 Tallahassee, FL 32399-1050

Mike A. Shehadeh, P.E.

City Manager City of Homestead Electronic Mail Distribution

County Manager of Miami-Dade County 111 NW 1st Street, 29th Floor Miami, FL 33128

Gene St. Pierre Vice President, Fleet Support Florida Power & Light Company Electronic Mail Distribution

FPL

Letter to Mano Nazar from Daniel W. Rich dated September 1, 2011

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - TURKEY POINT NUCLEAR PLANT UNIT 3 AND UNIT 4 (NRC INSPECTION REPORT 05000250/2011006 AND 05000251/2011006)

Distribution w/encl:

C. Evans, RII EICS L. Douglas, RII EICS OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMTurkeyPoint Resource Institute of Nuclear Power Operations (INPO)

ROPReports