ML17208A774

From kanterella
Revision as of 18:22, 7 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Responds to NRC 800512 Ltr Re Violations Noted in IE Insp Rept 50-335/80-10.Corrective Actions:Examiner Passed Eye Exam & Schedule for Recertification of Vision Tests Established
ML17208A774
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/11/1980
From: UHRIG R E
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17208A773 List:
References
L-80-177, NUDOCS 8007070100
Download: ML17208A774 (3)


See also: IR 05000335/1980010

Text

I P.O.BOX 529100, MIAMI, FL 33152 FLORIDA POWER 6 LIGHT COMPANY June 11, 1980 L-80-177 Mr.James P.O'Reilly, Director, Region II Office of Inspection

and Enforcement

U.S.Nuclear Regulatory

Commission

10l Marietta Street, Suite 3100 Atlanta, Georgia 30303 Dear Mr.O'Reilly: Re: RII: BRC 50-335/80-10

'Florida Power 8 Light Company has reviewed the subject inspection

report and a response is attached.There is no proprietary

information

in the report.Very truly yours, Q~~Robert E.Uhrig Vice President Advanced Systems 8 Technology

REU/MAS/pa

Attachment

cc: Harold F.Reis, Esquire'~~OFFICIAL COPE-i: 80OPO7 0/m PEOPLE...SERVING PEOPLE

RESPONSE TO USNRC I&E INSPECTION

REPORT 80-10~Findi n: As required by Criterion V of Appendix B to 10 CFR 50 and as implemented

by Section 5.0 of the FPL Topical guality Assurance Report,"Activities

affecting quality shall be prescribed

by documented

instructions, procedures, drawings...

and shall be accomplished

in accordance

with these instructions, procedures

and drawings".

Paragraph 5.4.3.1 of FP8L procedure gI 9 PR/PSL-2, the implementing

guality Instruction

for the control of NDE, and paragraph 8 of ASNT SNT-TC-lA require a yearly eye examination

for NDE personnel.

Contrary to the above, on April ll, 1980 NDE rt,cords revealed that for the site Level III examiner, an eye examination

had not been administered

within the required yearly time frame.~Res ense: 1.The Level III examiner has satisfactorily

passed his eye examination.

2.All affected personnel have been reminded of the need for yearly vision tests and given a recertification

schedule for the current year.3~Full compliance

is considered

achieved as of this date.