IR 05000335/1980010
| ML17208A778 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 04/30/1980 |
| From: | Crowley B, Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML17208A773 | List: |
| References | |
| 50-335-80-10, NUDOCS 8007070107 | |
| Download: ML17208A778 (13) | |
Text
~f1 RELY(
+4
~o ty
C
I cO
'e O~
Cy
+~
~0
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100 ATLANTA,GEORGIA 30303 gg 12 $80 Report No. 50-335/80-10 Licensee:
Florida Power 8 Light Company 9250 West Flagler Street Miami, FL 33101 Facility Name:
St. Lucie Docket No. 50-335 I
License No. DPR-67 Inspection a
t. Lucie site near Fort Pierce, Florida Inspect r:
B.
8g 8'o Date igned Appro ed by:
A. R. Herdt, Section Chief, RCES Branch Date Signed SUMMARY Inspection on April 8-11, 1980 Areas Inspected This routine, unannounced inspection involved 25 inspector-hours on site in the areas of inservice inspection (ISI); IE Bulletin 79-13.
Results Of the two areas inspected, no items of noncompliance or deviations were identi-fied in one area; one item of noncompliance was found in one area (Deficiency-Failure of NDE examiner to meet eye examination requirements, paragraph 7.a.).
80 P qo'P 0/o7 s
DETAIIS 1.
Persons Contacted Licensee Employees
- C. M. Wethy, Plant Manager-G.
M. Vaux, QC Supervisor A.
W. Bailey, QA Operations Supervisor
- G..V. Papalexiou, PRN Specialist R.'. Miller, Senior Plant Technician N.
G. Roos, QC Engineer E.
G. Becker, QC Engineer Other licensee employees contacted included technicians, security force members, and office personnel.
Other Organizations Southwest Research Institute (SwRI)
-D. F. Rosow, Project Engineer
+M. R. Gonzalez, QA Engineer
+Attended exit interview 2."
Exit Interview On April ll, 1980, the inspector met with the licensee representatives noted in paragraph 1 above and summarized the scope and findings of the, inspection of ISI activities and IE Bulletin 79-13.
The noncompliance of paragraph 7.a was acknowledged by the licensee without comment.
3.
Iicensee Action on Previous Inspection Findings Not inspected.
4.
Unresolved Items Unresolved items were not identified during this inspection.
5.
Inservice Inspection - Review of Program The inspector reviewed the licensee's ISI program in the areas indicated below.
In accordance with the provisions of Florida Power and Light Company (FPM) submittal I-77-203 dated July 1, 1977, to the Director of Nuclear
0
"2" Reactor Regulation, ISI is being performed in accordance with the 1974 Edition, including addenda through the summer of 1975, of Section XI of the ASME Boiler and Pressure Vessel Code.
a
~
b.
The inspector reviewed the ISI program for the current outage to determine if the program had been approved by the licensee.
The inspector reviewed the following FPSL and SwRI documents relative to the ISI program for the current outage:
SwRI "Project Plan for the 1980 Inservice Examination of St. Lucie Plant Unit 1"
"St. Lucie Unit 1-Long-Term Inservice Examination Plan - Class 1,
2 and 3 Components and Systems" SwRI Nuclear Operating Procedure (NPOP) IX-FE-101-1, "Deviations to Nuclear Field Services Section Operation Procedures" SwRI NPOP IX-FE-103-1, "Weld Joint Identification Marking on Nuclear Power Plant Piping" SwRI NPOP lX-FE-104-1, "Measuring and Recording Search Unit Locations and Maximum Signal Amplitude Data During Ultrasonic Weld Examinations" SwRI NPOP IX - FE - 105-0,
"Recording Data From Direct Visual, Liquid Penetrant, and Magnetic Particle Examination of Welds" SwRI NPOP IX-FE-109-1, "Measuring and Recording Search Unit Location and Signal Amplitude Data During Ultrasonic Examination of Pressure Vessel Welds" SwRI NPOP X-FE-101-1, "Onsite NDT Records Control" SwRI NPOP XIII-AG-101-0, "Control of Nuclear Inspection Equipment" SwRI "Nuclear Quality Assurance Program Manual" (NQAP) 2-1, Revision 1, "Organization" SwRI NQAP 3-1, Revision 1, "Procedures, Instructions and Drawings" SwRI NQAP 9-1, Revision 1, "Document Control" SwRI NQAP 10-1, Revision 1, Test and Inspection Equipment Control" SwRI NQAP ll-l, Revision 1, "Special Processes Control" SwRI NQAP 13-1, Revision 1, "Deviation and Noncompliance Control"
"3-SwRI NQAP 14-1, Revision 1, "Corrective Action Control" SwRI NQAP 15-1, Revision 1, "Audits" SwRI NQAP 15-2, Revision 1, "Qualification and Certification of Quality Assurance Auditors" SwRI NQAP 15-3, Revision 1", "Qualification and Certification of Quality Control Inspection and Testing Personnel" FPRL QI 10 PR/PSL-4, Revision 0, "Plant Inservice Inspection Team Charter" FPSL QI 18 PR/PSL-2, Revision 6, "Quality Control Surveillance" FPGL QI 1 PR/PSL-7, Revision 2, "Quality Control Organization" FPM QI 9 PR/PSL-2, Revision 5, "Control of Nondestructive Examination" FP&L QP 2.5, Revision 3, "Quality Assurance Indoctrination and Training" FPSL QP 18.2, Revision 7, "Scheduling of Quality Assurance Department Audit Activities" FPGL Quality Assurance Department Audit Program Plan - "11/1/80-12/31/82" FPM Quality Assurance Department Audit Schedule - "4/ll/80 -6/30/80" FPSL Audit QAO-PSL-80-04-188 These documents were reviewed to assure that procedures and plans had been established (written, reviewed, approved and issued)
to control and accomplish the following activities:
(1)
Organizational structure including qualifications, training, responsibilities and duties of personnel.responsible for ISI.
(2)
Audits including procedures, frequency, and qualification of
. personnel.
(3)
General QA requirements including examination reports, deviations from previously established program, material certifications and identification of components to be covered.
(4)
York and inspection procedures.
(5)
Control of processes including suitably controlled work conditions, special methods, and use of qualified personne (6)
Corrective action.
(7)
Document control.
(8)
Control of examination equipment (9)
Quality records including documentation of indications and NDE findings, review of documentation, provisions t',o assure legibility and retrievability, and corrective action.
(10)
Scope of the inspection including description or areas to be examined, examination category, method of inspection, extent of examination and justification for any exceptions.
(ll) Definition of inspection interval and extent of examinations.
(12)
Qualification of NDE personnel.
(13)
Controls for generation, approval, custody, storage and maintenance of NDE records.
Within the areas inspected, no items of noncompliance or deviations were identified.
'nservice Inspection - Review of Procedures The inspector reviewed the ISI procedures indicated below to determine whether the procedures were consistent wi,th regulatory requirements and licensee committments.
See paragraph 5 above for the applicable code.
a ~
The following procedures were reviewed in the areas of procedures approval and requirements for qualification of NDE personnel:
(1)
SwRI NDT-600-3-52,
"Manual Ultrasonic Examination of Pressure Piping Welds" (2)
SwRI NDT-600-6-20,
"Manual Ultrasonic Examination of Reactor Coolant Pump Flywheels" (3)
SwRI NDT-200-1-42, "Liquid Penetrant Examination Color Contrast Method" (4)
SwRI NDT-300-2-25, "Florescent Magnetic Particle Examination" (5)
SwRI NDT-600-15-39,
"Manual Ultrasonic Examination'of Pressure Vessel Welds" b.
In addition to the above review, procedure NDT-600-15-39 was reviewed in the areas of compilation of required records and procedure technical content relative to:
type of apparatus, extent of coverage including beam angles and scanning techniques, calibration requirements, search
-5-units, DAC curves,.reference level for monitoring discontinuities, method of demonstrating penetration, levels for evaluation and recording indications, and acceptance standards.
c ~
In addition to the review of paragraph a., procedure NDT-200-1-42 was reviewed in the areas of compilation of required records and technical content relative to:
method consistent with ASME code., specification of brand names of penetrant materials, specification of limits for sulfur and total halogens for materials, pre-examination surface preparation, minimum drying time following surface cleaning, penetrant application and penetration time, temperature requirements, solvent removal, method of surface drying, type of developer and method of application, examination technique, technique for evaluation, accep-tance standards, and requalification requirements.
d.
In addition to the review of paragraph a, procedure NDT-300-2-25 was reviewed in the areas of compilation of required records and technical content relative to:
examination method, suspension medium and com-ponent surface temperature, viewing conditions, examination overlap and directions, pole spacing, and acceptance criteria.
Within the areas inspected, no items'f noncompliance or deviation were identifi'ed.
'nservice Inspection - Observation of Work and Work Activities The inspector observed the ISI activities described below to determine whether these activities were being performed in accordance with regulatory requirements and licensee procedures.
See paragraph 5 above for the appli-cable code.
a
~
Personnel qualification records for one level I, one level II and one level III (FPM,) examiner were reviewed.
During review of the FPGL level III examiner's records, the inspector found that the time from his last eye examination (3/22/80) had exceeded one year.
Paragraph 5.4.3.1 of FPM QI 9 PR/PSL-2 and paragraph 8.2 of ASNT SNT-TC-lA requires that the eye examination be administed yearly.
This matter is considered to be noncompliance with Criteria V of Appendix B to
CFR 50, as implemented by paragraph 17.5.2 of the FSAR and is identified as item 335/80-10-01, Failure of NDE examiner to meet eye examination requirements.
An immediate eye examination revealed that the examiner's vision had not changed since his last examination.
Based on this fact and the minimal safety significance, this item is categorized as a deficienc b.
In-process ultrasonic (UT) inspection, including calibration on the applicable calibration blocks and review of associated in-process data sheets, was observed for the following welds or components:
Closure Head Meridional Weld - RPV-C.H.-209-03D:
0 degree inspection Closure Head to Flange Weld - RPV-C.H.-209-02:
0 degree 'Inspection-also observed calibration for 45 degree inspection RPV closure Head Nuts - Serial Nos.
30, 33 and 34 The inspections were compared with applicable procedures.in the following areas:
(1)
Availability of and compliance with approved NDE procedures.
(2)
Use of knowledgeable NDE personnel.
(3)
Use of NDE personnel qualified to the proper level.
(4)
Recording of inspection results.
(5)
Type of Apparatus used.
(6)
Extent of coverage of weldment.
(7)
Calibration requirements.
(8)
Search units.
(9)
Beam angles.
(10)
DAC curves.
(ll)
Reference level for monitoring discontinuities.
(12)
Method for demonstrating penetration.
(13)
Limits for evaluating and recording indications.
(14)
Recording significant indications.
(15)
Acceptance Limits.
VQ Within the areas inspected, no items of noncompliance, except as noted in paragraph 7.a., or deviation were identifie ~
~
a
0
IE Bulletins (IEB)
(Open)
IEB 79-13, Cracking in Feedwater System Piping During the current outage, the licensee re-radiographed the feedwater lines for a distance of 1 pipe diameter downstream from the auxiliary feedwater tie-in.
The original radiographs, from radiography performed during a previous outage, did not meet density requirements.
The inspector reviewed the new radiographs.
All inspections required by the bu1letin have been completed.
The bulletin remains open pending receipt of the final report from the licensee.
Within the areas inspected, no items of noncompliance or deviation were identified.