ML17279B037

From kanterella
Revision as of 00:25, 7 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1988.W/undated Ltr
ML17279B037
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/30/1988
From: HUTCHISON L B, POWERS C M
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8805200046
Download: ML17279B037 (10)


Text

I C CELE%@TED DIRIBUTION DEMONSTJOHON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:8805200046 DOC.DATE: 88/04/30 NOTARIZED:

NO DOCKET FACXL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.B.

Washington Public Power Supply System POWERS,C.M.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATXON

SUBJECT:

Monthly operating rept for Apr 1988.W/undated ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL J SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: D RECIPIENT ID CODE/NAME PD5 LA SAMWORTH,R INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 11 NRR/DREP/RPB 10 NUDOCS-ABSTRACT RGN5 EXTERNAL: EG&G WILLIAMS, S NRC PDR COPIES LTTR ENCL 1 0 1 0 10 10 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 S ILRB12 G FILE 01 LPDR NSIC COPIES LTTR ENCL 5 5 1~1 2 2 1 1 1 1 1 1 1 1 1 1 9 8 R I 8"'A D (I D'l 8 TOTAL NUMBER OF COPIES REQUXRED: LTTR 32 ENCL 30

)II DOCKET HO.QIIT I'INIE 50-397 MNP-2 BEPCAT PEBIC}0'APRIL l9 88 mcnth, year fB.o~K~vs TioTin~nznsGH~wc tco LNIT SIIUTDONNS

/BEDUCTIONS

~N!II S Y TER o.1MlElll s 5 DIII DgTE 05/02/88<...~COMPLETED BY TELEPIIONE (509)377-2486 C IOI T PBEVEI T B.C IN NC 88"07 4-30-88 S 17.6 C RC FUELXX Plant shutdown as scheduled for refueling outage.X OCDI C76)lÃ0 Vl M, QO', 50 OOi, A4'O'OCO i Ulm OO noQ, AQO,'UI t IlNY TYPE HNP-2 SHUTDOWN FOR SCHEDULED REFUELING OUTAGE hIETHOD SYSTEhI k COMPOILNT F-Forced S-clled A-Equip Failure 0-hIaint or Test~C-Be f ue ling D-Begula tory Bes triction L-Oper itor Training h License Examination F-hdmin G-Oper Error H-Other 1-manual 2-manual Scram 3-Iluto Scram 4-Continued 5-Beduced Load 9-Otl>er Exhibit F h II Xnstructions for Preparation of'ata Entry Sheet Licensee Event Beport (LEB)File (NUBEG-0161)

v1 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.MNP 2 05/02/88 COMPLETED p Y L HUTCH I SON TELEPHONE (509)377"2486 APRIL 1988 MONTH DAY AVERAGE DAILY POWER LEVEL (MWe-Net)911 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)1045 17 974 995 1044 1042 1032 18 19 20 21 1049 1047 1044 1042 1036 10 12 13 15 1050 1056 1051 1048 1043 1042 1014 1016 23 24 25 29 30 31 1056 1056 1054 1046 1034 INSTRUCTIONS Qn this form, list the average daily unit power level in MVe~Vet for each day in the reporting month.Compute to the nearest~hole megawatt.These Ggures will be used to plot a graph for each reporting month.iVote that when maximum dependable capacity is used for the net electrical nting of the unit, there may be occasions when the daily average power level exce ds the 100%line (or the respected power level line).In such cases, the average daily unit power outout sheet should be footnoted to~lain the apparent anomaly.

\

OPERATING DATA REPORT WNP-2 01-May-88 DOCKET: 50-397 REPORTING PERIOD: UTILITY CONTACT: Apr-88 OUTAGE+QN-LINE HOURS LEONARD HUTCH I SON (509)377-2486 719'I t~: LICENSED THERMAL POWER (MWt): NAMEPLATE RATING (GROSS MWe): DESIGN ELECTRICAL RATING (NET MWe): MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): MAXIMUM DEPENDABLE CAPACITY (NET MWe): MM23 1200.9 1100 1140 1095 IF CHANGES OCCUR ABOVE SINCE LAST REPORT, G!VE REASONS: io.POWER TQ WHICH RESTRICTED, IF ANY (NET MWe>: il.REASONS FQR RESTRICTIONS, IF ANY'2.REPORT PERIOD HOURS i3.HOURS REACTOR CRITICAL 14.RX RESERVE SHTDWN HRS i5.HRS GENERATOR ON LINE 16.UNIT RESERVE SHUTDOWN HOURS 17.GROSS THERMAL" ENERGY (MWH)18.GROSS ELECTRICAL ENERGY (MWH)19.NET ELECTRICAL ENERGY (MWH)20.UNIT SERVICE FACTOR 21-UNIT AVAILABILITY FACTOR 22.UNIT CAPACITY FACTOR (MDC NET)23.UNIT CAPACITY FACTOR (DER NET>24.UNIT FORCED OUTAGE RATE 25.FORCED OUTAGE HOURS MONTH 719 703.0 0.0 701.4 0.0 2280000 746710 721055 97.5/97.5/91.6X 91 2/O.OX 0.0 YEAR CUMULATIVE 2903 29623.2 2223.2 22130.0 0.0 340 4 2176.1 21318.0 0.0 381.7'719698 57102465 2244320 19061460 2166352 18334304 75.O/.7Z.OX 75 0/73.3%68.2/56.5%67.8/56.3/24.6X 9.9X'09.3 2354.3 26~SHUTDOWNS SCHEDULED OVER THE NEXT'6 MONTHS (TYPE1DATE>DURATION)

NONE 27.IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE: 06/13/88 4

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George LVashington lVay+Richland,$Vashington 99352 Docket No.50-397 May U.S.Nuclear.Regulatory Commission Document Control Desk Washington; D.C.20555

Dear Sir,

SUBJECT:

NUCLEAR PLANT NO.2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for April 1988 as required by our Technical Specifications 6.9.1.6.Very Truly Yours, C..Powers (M/D 927M)WNP-2 Plant Manager.CMP/sl Enclosure cc: Mr,.Mr,.Ms.Mr..Mr.J.B.Martin C.J.Bosted Dottie Sherman J.T.Wheelock W.H.Lovelace NRC Region V NRC Site Representative (901A)ANI, Far,mington CT INPO NRC;Washington D.C.

I