ML17279B037

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1988.W/undated Ltr
ML17279B037
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/30/1988
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8805200046
Download: ML17279B037 (10)


Text

I C CELE%@TED DIRIBUTION DEMONSTJOHON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8805200046 DOC.DATE: 88/04/30 NOTARIZED: NO DOCKET FACXL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION HUTCHISON,L.B. Washington Public Power Supply System POWERS,C.M. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATXON

SUBJECT:

Monthly operating rept for Apr 1988.W/undated ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL J SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES: D RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 0 PD5 PD 5 5 SAMWORTH,R 1 0 INTERNAL: ACRS 10 10 AEOD/DOA 1 ~ 1 AEOD/DSP/TPAB 1 1 ARM TECH ADV 2 2 NRR/DLPQ/PEB 11 1 1 NRR/DOEA/EAB 11 1 1 NRR/DREP/RPB 10 1 1 S ILRB12 1 1 NUDOCS-ABSTRACT 1 1 G FILE 01 1 1 9 RGN5 1 1 8

EXTERNAL: EG&G WILLIAMS,S 1 1 LPDR 1 1 NRC PDR 1 1 NSIC 1 1 R

I 8

'A D

( I D 'l 8

TOTAL NUMBER OF COPIES REQUXRED: LTTR 32 ENCL 30

)

II

DOCKET HO. 50-397 QIIT I'INIE MNP-2 DgTE 05/02/88 <

...~

LNIT SIIUTDONNS / BEDUCTIONS COMPLETED BY BEPCAT PEBIC}0 'APRIL l9 88 TELEPIIONE (509) 377-2486 mcnth, year fB. o~K ~vs TioTin~ nznsGH ~wc tco ~N! II S Y TER o. 1MlElll s 5 DIII C IOI T PBEVEI T B.C IN NC 88"07 4-30-88 S 17.6 C RC FUELXX Plant shutdown as scheduled for refueling outage.

X OCDI C76) l

Ã0 Vl M,

QO',

50 OOi, A4'O' OCO i Ulm OO noQ, AQO,'UI t IlNY HNP-2 SHUTDOWN FOR SCHEDULED REFUELING OUTAGE TYPE hIETHOD SYSTEhI k COMPOILNT F-Forced A-Equip Failure F-hdmin 1-manual Exhibit F h II S- clled 0-hIaint or Test ~ G-Oper Error 2-manual Scram Xnstructions for C-Be fue ling H-Other 3-Iluto Scram Preparation D-Begula tory Bes triction 4-Continued Entry Sheet of'ata L-Oper itor Training 5-Beduced Load Licensee Event Beport h License Examination 9-Otl>er (LEB) File (NUBEG-0161)

v1 AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

MNP 2 05/02/88 COMPLETED p Y L HUTCH I SON TELEPHONE (509) 377 "2486 APRIL 1988 MONTH DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) (MWe-Net) 911 1045 17 974 1049 18 995 1047 19 1044 1044 20 1042 1042 21 1032 1036 23 1050 1056 24 1056 1056 10 1051 25 1054 1048 1046 12 1043 1034 13 29 1042 30 15 1014 31 1016 INSTRUCTIONS Qn this form, list the average daily unit power level in MVe~Vet for each day in the reporting month. Compute to the nearest ~hole megawatt.

These Ggures will be used to plot a graph for each reporting month. iVote that when maximum dependable capacity is used for the net electrical nting of the unit, there may be occasions when the daily average power level exce ds the 100% line (or the respected power level line). In such cases, the average daily unit power outout sheet should be footnoted to ~lain the apparent anomaly.

\

OPERATING DATA REPORT WNP-2 01-May-88 DOCKET: 50-397 REPORTING PERIOD: Apr-88 OUTAGE + QN-LINE HOURS 719 UTILITY CONTACT: LEONARD HUTCH I SON (509) 377-2486 t ~:

'I LICENSED THERMAL POWER (MWt): MM23 NAMEPLATE RATING (GROSS MWe): 1200.9 DESIGN ELECTRICAL RATING (NET MWe): 1100 MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1140 MAXIMUM DEPENDABLE CAPACITY (NET MWe): 1095 IF CHANGES OCCUR ABOVE SINCE LAST REPORT, G!VE REASONS:

io. POWER TQ WHICH RESTRICTED, IF ANY (NET MWe>:

il. REASONS FQR RESTRICTIONS, IF ANY'2.

MONTH YEAR CUMULATIVE REPORT PERIOD HOURS 719 2903 29623.2 i3. HOURS REACTOR CRITICAL 703.0 2223.2 22130.0

14. RX RESERVE SHTDWN HRS 0.0 0.0 340 4 i5. HRS GENERATOR ON LINE 701. 4 2176.1 21318.0
16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 381.7
17. GROSS THERMAL" ENERGY (MWH) 2280000 '719698 57102465
18. GROSS ELECTRICAL ENERGY (MWH) 746710 2244320 19061460
19. NET ELECTRICAL ENERGY (MWH) 721055 2166352 18334304
20. UNIT SERVICE FACTOR 97.5/ 75.O/. 7Z.OX 21- UNIT AVAILABILITYFACTOR 97. 5/ 75 0/ 73.3%
22. UNIT CAPACITY FACTOR (MDC NET) 91. 6X 68. 2/ 56. 5%
23. UNIT CAPACITY FACTOR (DER NET> 91 2/ 67. 8/ 56. 3/
24. UNIT FORCED OUTAGE RATE O.OX 24. 6X 9. 9X
25. FORCED OUTAGE HOURS 0.0 '09.3 2354.3 26 ~ SHUTDOWNS SCHEDULED OVER THE NEXT '6 MONTHS (TYPE1DATE>DURATION)

NONE

27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE: 06/13/88

4 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George LVashington lVay + Richland, $ Vashington 99352 Docket No. 50-397 May U.S. Nuclear. Regulatory Commission Document Control Desk Washington; D.C. 20555

Dear Sir,

SUBJECT:

NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for April 1988 as required by our Technical Specifications 6.9.1.6.

Very Truly Yours, C. . Powers (M/D 927M)

WNP-2 Plant Manager.

CMP/sl Enclosure cc: Mr,. J. B. Martin NRC Region V Mr,. C. J. Bosted NRC Site Representative (901A)

Ms. Dottie Sherman ANI, Far,mington CT Mr.. J. T. Wheelock INPO Mr. W. H. Lovelace NRC; Washington D.C.

I