ML17284A488

From kanterella
Revision as of 00:06, 7 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1988 for WNP-2.W/880808 Ltr
ML17284A488
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/31/1988
From: HUTCHISON L, POWERS C M
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8809010199
Download: ML17284A488 (7)


Text

AC CELE RATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTXON SYSTEM (RIDS)ACCESSXON NBR:8809010199 DOC.DATE: 88/07/31 NOTARIZED:

NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION HUTCHXSON,L.

Washington Public Power Supply System POWERS,C.M.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Jul 1988 for WNP-2.W/80808 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per.Tech Specs)DOCKET 05000397 I NOTES: RECIPIENT, i',",'ID;CODE/NAME

-PD5 LA SAMWORTH, R XNTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 11 N g-PB 10 G F LE 01 EXTERNAL: EG&G WILLIAMS, S NRC PDR COPIES LTTR;ENCL 1 0 1 0 10 10 1 1 1 1 1 1 1 1 1 1 1 1 AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN5 LPDR NSIC 1 1 2 2 1 1 1 1 1 1 1 1 1 1 ,RECIPIENT COPIES'ID.,CODE/NAME

";,'~LTTR""i ENCL PD5 PD 5~'D 8 A tQ 8'D.D'TOTAL NUMBER OF COPIES REQUXRED: LTTR 31 ENCL 29 0 f.1 4[

OPERATING DATA REPORT NNP-2 01-Aug-88 i.DQCKETI 50-397 2 REPORTING PERIODr.3 UTILITY CONTACT!Jul-88 OUTAGE+ON-LINE HOURS LEONARD HUTCHISON (509)377-2486 4 LICENSED THERMAL PONER (MNt)a 5 NAMEPLATE RATING (GROSS MMa)6 DESIGN ELECTRZCAL RATING (NET MNe): 7.MAXIMUM DEPENDABLE CAPACITY (GROSS MNa)".8.MAXIMUM DEPENDABLE CAPACITY (NET MNe)s 9 IF CHANGES OCCUR ABOVE SINCE LAST REPORT~'GIVE REASONS'323 1200 9 1100 1140 1095 10.PQNER TO NHICH RESTRICTED'F ANY (NET MNe)s 11~REASONS FOR RESTRICTIONS~

IF ANYo 12.REPORT PERIOD HOURS 13.HOURS REACTOR CRITICAL 14 RX RESERVE SHTDNN HRS 15.HRS GENERATOR ON LINE 16.UNIT RESERVE SHUTDQNN HOURS 17.GROSS THERMAL ENERGY (MNH)18 GRQSS ELECTRZCAL ENERGY (MNH)19 NET ELECTRICAL ENERGY (MNH)20.UNIT SERVICE FACTOR 21.UNIT AVAILABILITY FACTOR'22.UNIT CAPACITY FACTOR (MDC NET)23 UNIT CAPACITY FACTOR (DER NET)24.UNIT FORCED OUTAGE RATE 25.FORCED OUTAGE HOURS MONTH 744 744.0 0.0 744 0 0 0 2419200 792440 764764 100.OX 100 OX 93.9/93.4/0 OX 0 0 YEAR CUMULATIVE 5111 31831'3167 7 23074 5 0 0 340 4 3010 8 22152 7 0.0 381.7 9294934 59677701 3084600 19901740 2976623 19144575 58.9X 69.6X 58 9X 70 SX 53 2X 54 9X 52 9X 54.7X 19 1X 9 6/709.3 2354.3 26.SHUTDONNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE~DATE~DURATION)s NONE 27.IF CURRENTLY SHUTDQNN ESTIMATED STARTUP DATE<8809010199 880731 PDR ADOCK 05000397 R PDC~29 Yi UNIT NWE DRTE WNP-2 LNIT SIOTDONNS/AEDUCTIONS COMPLETED Oy L8 HUTCHISON BEPCAT.PEAIOO JULY 19 88 men th, year HO.Enny lief Foehn~ncnsGH~sz co NONE TELEPI lONE C IO S&&'&&I&&&&&&&IRT&&&&50 RlE E i A&C BBEr StN t NAY WNP"2 OPERATED WITH NO SHUTDOWNS DURING JULY TYPE F-Forced S-Schcd R-Equip Failure 0-Maint or Test~C-Ae f ue ling 0-Begula tory Bes triction E-Operator Tra/ning h License Examination F-Rdmin 0-Oper Error H-Other l-Manual 2-Manual Scram 3-Ruto Scram 4-Continued 5-Aeduced Load 9-Other SYSTEM Bc COMPOM:NT Exhibit F h H Instructions for Preparation of Data Entry Sheet Licensee Event Aepnrt (LEA)File (NUBEG-0161)

AVERAGE DAILY UNIT POVfER LEVEL DOCKET No.UNIT 50-597 DATE 8 1 8 COMMMD BY L'B HUTCHISON TELEPHONE (509)377"2486 JULY 1988 MONTH DAY'VERAGE DAILY POPPER LEVEL (59Ye-Net}

852 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)1062'3 12 13 14 15 976 980 978 991 1034 1050 1047 1046 1051 1049 1043 1049 18 28 1058 1057 1046 1040 963 1054 1054 1054 1050 1051 1060 1053 1050 INSTRUCTIONS On this form, list the average daily unit power level in MWe~Net for each day in the reporting month.Compute to the nearest whole megawatt.These Ilgures wQl be used to plot a graph for each reporting month.Note that when max!mum dependable capacity is used for the net electrical rating of the.unit, there may be occasions when the daily avetage power!evel exce ds the 100%line (or the restricted power-level line).In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 Docket No.50-397 August 8, 1988 U.S.Nuclear.Regulatory Commission Document Control Desk Washington, D.G.20555

Dear Sir,

SUBJECT:

NUCLEAR PLANT NO.2 MONTHLY OPERATING REPORT Transmitted henewith is the Monthly Operating Report for.July 1988 as required by our Technical Specifications 6.9.1.6.Very Truly Yours, C.M.Powers (M/D 927M)WNP-2 Plant Manager CMP/lc Enclosure cc: Mr.J.B.Martin Mr,.G.J.Bosted Ms.Dottie Sherman Mr,.J.T.Wheelock Mr.W.H.Lovelace NRC Region V NRC Site Representative (901A)ANI, Farmington GT INPO NRC, Washington D.G.

I*H