ML17284A488

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1988 for WNP-2.W/880808 Ltr
ML17284A488
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/31/1988
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8809010199
Download: ML17284A488 (7)


Text

AC CELE RATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTXON SYSTEM (RIDS)

ACCESSXON NBR:8809010199 DOC.DATE: 88/07/31 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION HUTCHXSON,L. Washington Public Power Supply System POWERS,C.M. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION I

SUBJECT:

Monthly operating rept for Jul 1988 for WNP-2.W/ 80808 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per. Tech Specs)

NOTES: D RECIPIENT, COPIES ,RECIPIENT COPIES 8 i',", 'ID;CODE/NAME LTTR; ENCL 'ID.,CODE/NAME ";, '~ LTTR""iENCL PD5 LA 1 0 PD5 PD 5 ~

SAMWORTH, R 1 0 A

XNTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 ARM TECH ADV 2 2 NRR/DLPQ/PEB 11 1 1 NRR/DOEA/EAB 11 1 1 N g - PB 10 1 1 NUDOCS-ABSTRACT 1 1 tQ G F LE 01 1 1 RGN5 1 1 EXTERNAL: EG&G WILLIAMS,S 1 1 LPDR 1 1 8'

NRC PDR 1 1 NSIC 1 1 D.

D' TOTAL NUMBER OF COPIES REQUXRED: LTTR 31 ENCL 29

0 f.

1 4[

OPERATING DATA REPORT NNP-2 01-Aug-88

i. DQCKETI 50-397 2 REPORTING PERIODr. Jul-88 OUTAGE + ON-LINE HOURS 3 UTILITY CONTACT! LEONARD HUTCHISON (509) 377-2486 4 LICENSED THERMAL PONER (MNt) a 5 NAMEPLATE RATING (GROSS MMa) 1200 9 6 DESIGN ELECTRZCAL RATING (NET MNe): 1100
7. MAXIMUM DEPENDABLE CAPACITY (GROSS MNa)". 1140
8. MAXIMUM DEPENDABLE CAPACITY (NET MNe) s REASONS'323 1095 9 IF CHANGES OCCUR ABOVE SINCE LAST REPORT~'GIVE
10. PQNER TO NHICH RESTRICTED'F ANY (NET MNe) s 11 ~ REASONS FOR RESTRICTIONS~ IF ANYo MONTH YEAR CUMULATIVE
12. REPORT PERIOD HOURS 744 5111 31831 '
13. HOURS REACTOR CRITICAL 744.0 3167 7 23074 5 14 RX RESERVE SHTDNN HRS 0.0 0 0 340 4
15. HRS GENERATOR ON LINE 744 0 3010 8 22152 7
16. UNIT RESERVE SHUTDQNN HOURS 0 0 0.0 381.7
17. GROSS THERMAL ENERGY (MNH) 2419200 9294934 59677701 18 GRQSS ELECTRZCAL ENERGY (MNH) 792440 3084600 19901740 19 NET ELECTRICAL ENERGY (MNH) 764764 2976623 19144575
20. UNIT SERVICE FACTOR 100. OX 58.9X 69.6X
21. UNIT AVAILABILITYFACTOR 100 OX 58 9X 70 SX

'22. UNIT CAPACITY FACTOR (MDC NET) 93. 9/ 53 2X 54 9X 23 UNIT CAPACITY FACTOR (DER NET) 93. 4/ 52 9X 54.7X

24. UNIT FORCED OUTAGE RATE 0 OX 19 1X 9 6/
25. FORCED OUTAGE HOURS 0 0 709. 3 2354. 3
26. SHUTDONNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE~DATE~DURATION)s NONE
27. IF CURRENTLY SHUTDQNN ESTIMATED STARTUP DATE<

8809010199 880731 PDR ADOCK 05000397 PDC

~29 R

Yi

UNIT NWE WNP-2 DRTE LNIT SIOTDONNS / AEDUCTIONS COMPLETED Oy L8 HUTCHISON BEPCAT. PEAIOO JULY 19 88 TELEPI lONE 50 men th, year HO. Enny lief Foehn~ ncnsGH ~sz co S&&'&&I& &&&&&&IRT & & & & C IO RlE E i A&C BBEr NONE StN t NAY WNP"2 OPERATED WITH NO SHUTDOWNS DURING JULY SYSTEM Bc COMPOM:NT TYPE F-Forced R-Equip Failure F-Rdmin l-Manual Exhibit F h H S-Schcd 0-Maint or Test ~ 0-Oper Error 2-Manual Scram Instructions for f

C-Ae ue ling H-Other 3-Ruto Scram Preparation of 0-Begula tory Bes triction 4-Continued Data Entry Sheet E-Operator Tra/ning 5-Aeduced Load Licensee Event Aepnrt h License Examination 9-Other (LEA) File (NUBEG-0161)

AVERAGE DAILYUNIT POVfER LEVEL DOCKET No.

UNIT 50-597 DATE 8 1 8 L'B HUTCHISON COMMMDBY TELEPHONE (509) 377"2486 JULY 1988 MONTH DAY'VERAGEDAILYPOPPER LEVEL DAY AVERAGE DAILYPOWER LEVEL (59Ye-Net} (MWe-Net) 852 1062 18 1058

'3 976 1057 980 1046 978 1040 991 963 1054 1034 1054 1050 1054 1047 1050 28 1046 1051 12 1051 1060 13 1049 1053 14 15 1043 1050 1049 INSTRUCTIONS On this form, list the average daily unit power level in MWe~Net for each day in the reporting month. Compute to the nearest whole megawatt.

These Ilgures wQl be used to plot a graph for each reporting month. Note that when max!mum dependable capacity is used for the net electrical rating of the. unit, there may be occasions when the daily avetage power !evel exce ds the 100% line (or the restricted power- level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 August 8, 1988 U.S. Nuclear. Regulatory Commission Document Control Desk Washington, D.G. 20555

Dear Sir,

SUBJECT:

NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT Transmitted henewith is the Monthly Operating Report for. July 1988 as required by our Technical Specifications 6.9.1.6.

Very Truly Yours, C. M. Powers (M/D 927M)

WNP-2 Plant Manager CMP/lc Enclosure cc: Mr. J. B. Martin NRC Region V Mr,. G. J. Bosted NRC Site Representative (901A)

Ms. Dottie Sherman ANI, Farmington GT Mr,. J. T. Wheelock INPO Mr. W. H. Lovelace NRC, Washington D.G.

I*

H