Monthly Operating Rept for Aug 1990 for WNP-2.W/900907 Ltr
ML17286A311
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/31/1990
From: BAKER J W, HUTCHISON L B
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9009190193
Download: ML17286A311 (6)


Text

ACCELERATED DIST BUTION DEMONSTRATION SYSTEM~~I'EGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR: 9009190193 DOC.DATE: 90/08/31 NOTARIZED:

NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.B.

Washington Public Power Supply System BAKER,J.W.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000397

SUBJECT:

Monthly operating rept for Aug 1990 for WNP-2.W/900907 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR 2 ENCL SIZE: TITLE: Monthly Operating Report (per Tech Spec&)NOTES RECIPIENT ID CODE/NAME PD5 LA ENG,P.L.INTERNAL: ACRS AEOD/DSP/TPAB

~~J1LRQ/PEB10 EXTERNAL: EG&G BRYCE,J.H NSIC COPIES LTTR ENCL 3 3 1 1 10 10 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA IRM TECH ADV NRR/DOEA/OEAB11 RGN5 NRC PDR COPIES LTTR ENCL 1 1 1 1 2 2 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL 26 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 Docket No.50-397 September,-

7, 1990 U.S.Nuclear Regulatory Commission Document Control Desk Washington D.C.20555

Dear.Sir.:

Subject:

NUCLEAR PLANT NO.2 MONTHLY OPERATING REPORT AUGUST 1990 Transmitted herewith is the Monthly Operating Report for the month of August 1990 as required by our, Technical Specification 6.9.1.6.J..Baker, WNP-2 Plant Manager, (MD 927M)JWB:LBH:bap Enclosure cc: Mr,.J.B.Martin, NRC Region V Mr.C.J.Bosted, NRC Resident Inspector.

(901A)Ms.Dottie Sherman, ANI, Farmington, CT Mr.J.T.Wheelock, INPO Mr.W.H.Lovelace, NRC, Washington D.C.9009190193 900S31 PDR ADOCK 05000397;I l R PDC QEQ+

~.~l~II

~DOCKET NO.UNIT NNiE WNP-2 9/4/90 REPCAT PERIOD Aug 19 90 mcnth, year TI5.'DDAD llPE TQSJBN BE~sM MMEMIKI lNIT SiQTDONNS/REDUCTIONS 5I tWT COMPLETED BY TELEPi (ONE LB Hutchi'Son (509)377=~486 PREVE R C RRENC 90-02 4/21/90 S.147.6 C'90-03 8/7/90 S 4.55 B HA HECFUN Generator was removed from grid to perform overspeed testing of main turbine.It was then returned to service after successful completion of overspeed tests.RC Fuel XX Refueling outage RF-5 concluded.

l.SUbt"iARY WNP-2 returned to service from refueling outage.Subsequently, a scheduled outage for testing occured T'YPE F-Forced S-Sched A-Equip Failure D-Maint or Test C-Ref ueling D-Regulatory Restriction E-Operator Training h License Examination F-Admin G-Oper Error H-Other 1-Manual 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM h COMPONENT Exhibit F h H Instructions for Preparation of Data Entry Sheet Licensee Event Report (LER)File (NUREG-0161)

RAGE DAILY UNIT POWER LEVEL~MONTH August 1990 DAY AVERAGE DAILY POWER LEVEL (t~wE-Net) 2.3.5.6.7.17.l 8.19.20.2l.22.23.DOCKET NO.UNIT WNP"2 DATE COMPLETED BY LB Hutchison TEL'EPHPqE (509)377-2486 DAY AVERAGE DAILY POWER LEVEL (MwE-Net)932 932 1050 1056 1048 1049 1067 8.9 10.12.13.14.15.16.309 584 851 983 1036 904 573 902 1024 24.25.26.27.28.29.30.31.1067 1071 1070 1066 1059 1053 1060 1051 INSTRUCTIONS On this form, list the average daily unit power level in VWe-Net for each day in the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a graph for each reporting month.Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100 line (or the restricted power level line).In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

OPERATING DATA REPORT WNP-2 01-Sep-90 1.DOCKET: 50-397 2.REPORTING PERIOD: Aug-90 3.UTILITY CONTACT: OUTAGE+ON-LINE HOURS LEONARD HUTCHISON (509)377-2486 744 4.LXCENSED THERMAL POWER (MWt): 5.NAMEPLATE RATING (GROSS MWe): 6.DESIGN ELECTRICAL RATING (NET MWe): 7.MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 8.MAXIMUM DEPENDABLE CAPACXTY (NET MWe): 9~I F CHANGES OCCUR ABOVE S XNCE LAST REPORT i G I VE REASONS one 3323 1200.9 1100 1140 1095 10.POWER TO WHICH RESTRICTED, IF ANY (NET MWe): ll.REASONS FOR RESTRICTIONS, IF ANY: 12.REPORT PERIOD HOURS 13.HOURS REACTOR CRITICAL 14.RX RESERVE SHTDWN HRS 15.HRS GENERATOR ON LINE 16.UNIT RESERVE SHUTDOWN HOURS 17.GROSS THERMAL ENERGY (MWH)18.GROSS ELECTRICAL ENERGY (MWH)19.NET ELECTRICAL ENERGY (MWH)20.UNIT SERVICE FACTOR 21.UNIT AVAILABILXTY FACTOR 22.UNIT CAPACITY FACTOR (MDC NET)23.UNIT CAPACITY FACTOR (DER NET)24.UNXT FORCED OUTAGE RATE 25.FORCED OUTAGE HOURS MONTH 744 668.7 0.0 591.9 0.0 1751164 572460 546814 79.5~o 79.5%67.1~o 66~8+o 0.0%0.0 YEAR CUMULATIVE 5831 50095.2 3322.6 36397.8 0.0 340.4 3231.3 35078.9 0.0 381.7 9984501 98328941 3311840 32715790 3162389 31448532 55.44 70.0%55.4~o 70.8~o 49.5~o 57'~o 47.6~o 57'>o 0.04 7.9~o 0.0 2996.2 26~SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE i DATE i DURATION)27.IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE: