Monthly Operating Rept for Aug 1990 for WNP-2.W/900907 Ltr
ML17286A311
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/31/1990
From: John Baker, Hutchison L
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9009190193
Download: ML17286A311 (6)


Text

ACCELERATED DIST BUTION DEMONSTRATION SYSTEM

~~

I'EGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 9009190193 DOC. DATE: 90/08/31 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION HUTCHISON,L.B. Washington Public Power Supply System BAKER,J.W. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Aug 1990 for WNP-2.W/900907 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Spec&)

2 ENCL SIZE:

NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 3 3 PD5 PD 1 1 ENG,P.L. 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 IRM TECH ADV 2 2

~~J1LRQ/ PEB10 1 1 NRR/DOEA/OEAB11 RGN5 1 1 1 1 1 1 EXTERNAL: EG&G BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL 26

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 September,- 7, 1990 U.S. Nuclear Regulatory Commission Document Control Desk Washington D.C. 20555

Dear. Sir.:

Subject:

NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT AUGUST 1990 Transmitted herewith is the Monthly Operating Report for the month of August 1990 as required by our, Technical Specification 6.9.1.6.

J.. Baker, WNP-2 Plant Manager, (MD 927M)

JWB:LBH:bap Enclosure cc: Mr,. J.B. Martin, NRC Region V Mr. C.J. Bosted, NRC Resident Inspector. (901A)

Ms. Dottie Sherman, ANI, Farmington, CT Mr. J.T. Wheelock, INPO Mr . W.H. Lovelace, NRC, Washington D.C.

9009190193 900S31 QEQ+

PDR ADOCK 05000397 ;I l R PDC

~ .

~ l

~ II

~

DOCKET NO.

UNIT NNiE WNP-2 9/4/90 lNIT SiQTDONNS / REDUCTIONS COMPLETED BY LB Hutchi'Son REPCAT PERIOD Aug 19 90 TELEPi (ONE (509) 377=~486 mcnth, year TI5. 'DDAD llPE TQSJBN BE~sM MMEMIKI 5I tWT PREVE R C RRENC 90-02 4/21/90 S . 147.6 C RC Fuel XX Refueling outage RF-5 concluded.

'90-03 8/7/90 S 4.55 B HA HECFUN Generator was removed from grid to perform overspeed testing of main turbine.

then returned to service after successful It was completion of overspeed tests.

l. WNP-2 returned to service from refueling outage. Subsequently, a scheduled outage for testing SUbt"iARY occured T'YPE SYSTEM h COMPONENT F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F h H S-Sched D-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Ref ueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report h License Examination 9-Other (LER) File (NUREG-0161)

RAGE DAILY UNIT POWER LEVEL DOCKET NO.

WNP "2 UNIT DATE COMPLETED BY LB Hutchison

( 509 ) 377-2486 TEL'EPHPqE

~MONTH August 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (t~wE-Net) (MwE-Net)

17. 932
2. l 8. 932
3. 19. 1050
20. 1056
5. 2l. 1048
6. 22. 1049
7. 23. 1067
8. 309 24. 1067 9 584 25. 1071
10. 851 26. 1070 983 27. 1066 1036 28. 1059 12.

904 29. 1053 13.

573 1060

14. 30.

902 1051

15. 31.
16. 1024 INSTRUCTIONS On this form, list the average daily unit power level in VWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100 line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

OPERATING DATA REPORT WNP-2 01-Sep-90

1. DOCKET: 50-397
2. REPORTING PERIOD: Aug-90 OUTAGE + ON-LINE HOURS 744
3. UTILITY CONTACT: LEONARD HUTCHISON (509) 377-2486
4. LXCENSED THERMAL POWER (MWt): 3323
5. NAMEPLATE RATING (GROSS MWe): 1200.9
6. DESIGN ELECTRICAL RATING (NET MWe): 1100
7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1140
8. MAXIMUM DEPENDABLE CAPACXTY (NET MWe): 1095 9 ~ IF CHANGES OCCUR ABOVE S XNCE LAST REPORT i G IVE REASONS one
10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe):

ll. REASONS FOR RESTRICTIONS, IF ANY:

MONTH YEAR CUMULATIVE

12. REPORT PERIOD HOURS 744 5831 50095.2
13. HOURS REACTOR CRITICAL 668.7 3322.6 36397.8
14. RX RESERVE SHTDWN HRS 0.0 0.0 340.4
15. HRS GENERATOR ON LINE 591.9 3231.3 35078.9
16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 381.7
17. GROSS THERMAL ENERGY (MWH) 1751164 9984501 98328941
18. GROSS ELECTRICAL ENERGY (MWH) 572460 3311840 32715790
19. NET ELECTRICAL ENERGY (MWH) 546814 3162389 31448532
20. UNIT SERVICE FACTOR 79. 5~o 55.44 70.0%
21. UNIT AVAILABILXTYFACTOR 79.5% 55.4~o 70.8~o
22. UNIT CAPACITY FACTOR (MDC NET) 67. 1~o 49.5~o 57 '~o
23. UNIT CAPACITY FACTOR (DER NET) 66 8+o

~ 47.6~o 57 '>o

24. UNXT FORCED OUTAGE RATE 0.0% 0.04 7. 9~o
25. FORCED OUTAGE HOURS 0.0 0.0 2996.2 26 ~ SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE i DATE i DURATION)
27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE: