ML16347A393

From kanterella
Revision as of 00:57, 30 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

12/08/16 Summary of Teleconference with Pseg Nuclear LLC Regarding Planned License Amendment Request Regarding Change to the Salem Nuclear Generating Station-Hope Creek Generating Station Emergency Action Levels (MF8875, MF8876, and MF8877)
ML16347A393
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 01/05/2017
From: Carleen Parker
Plant Licensing Branch 1
To:
Public Service Enterprise Group
Parker C J, NRR/DORL/LPL1
References
CAC MF8875, CAC MF8876, CAC MF8877
Download: ML16347A393 (4)


Text

LICENSEE:

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 5, 2017 PSEG Nuclear LLC FACILITIES:

Hope Creek Generating Station and Salem Nuclear Generating

Station, Unit Nos. 1 and 2

SUBJECT:

SUMMARY OF DECEMBER 8, 2016, TELECONFERENCE WITH PSEG NUCLEAR LLC REGARDING PLANNED LICENSE AMENDMENT REQUEST REGARDING CHANGE TO EMERGENCY ACTION LEVELS (CAC NOS. MF8875, MF8876, AND MF8877) On December 8, 2016, a Category 1 public teleconference was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of PSEG Nuclear LLC (PSEG, the licensee).

The purpose of the meeting was to discuss the licensee's plan to submit a license amendment request (LAR) for the Hope Creek Generating Station (Hope Creek) and Salem Nuclear Generating Station (Salem),

Unit Nos. 1 and 2. The planned submittal will propose a change to Nuclear Energy Institute (NEI) 99-01, Revision 6, "Development of Emergency Action Levels for Non-Passive

Reactors, "1 for the Salem and Hope Creek Emergency Action Levels (EALs). The meeting notice and agenda, dated November 28, 2016, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 16333A087.

A list of attendees is enclosed.

The licensee provided a status of the planned submittal.

The schedule currently calls for the LAR to be submitted by the end of January 2017. The licensee intends to ask for a review timeframe commensurate with the NRC's standard LAR review time (approximately 1 year) and an implementation period of 180 days to support operator training sessions.

The NRC staff made a number of comments regarding its review process and what is needed from the licensee to support a timely review. The information listed below was conveyed to PSEG: ( 1) The regulatory basis for EAL scheme changes is contained in Appendix E to Title 10 of the Code of Federal Regulations (10 CFR) Part 50,Section IV.B.2. (2) The NRC staff will look for the following information as part of its review:

(a) A redline strike out of the Hope Creek and Salem bases documents, as compared to NEI 99-01, Revision

6. (b) A clean version of the Hope Creek and Salem bases documents.

(c) Calculations specific to EALs. 1 By letter dated March 28, 2013, the NRC staff found NEI 99-01, Revision 6 (ADAMS Accession No. ML 12326A805),

acceptable for use by licensees (ADAMS Accession No. ML 12346A463). (d) Wall board or other operator aid and basis document.

( e) Deviation matrix with basis. (3) The licensee's submittal should not contain safeguards information, in accordance with NEI 99-01, Revision

6. The NRG staff intends to make the submittal and the review documents (requests for additional information (RAls), safety evaluation, etc.) publicly available.

(4) The more information submitted with the initial request, the less RAls the NRG staff anticipates needing.

The licensee indicated that it has already incorporated all of the information the NRG staff listed in its draft and that the LAR will not include any safeguards information.

Members of the public were not in attendance.

No public meeting feedback forms were received.

Please direct any inquiries to me at 301-415-1603 or by e-mail to Carleen.Parker@nrc.gov.

Docket Nos. 50-354, 50-272, and 50-311

Enclosure:

List of Attendees cc w/enclosure:

Distribution via Listserv Sincerely, er, Project Manager Plant Licen i g Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES DECEMBER 8, 2016, TELECONFERENCE WITH PSEG NULEAR LLC HOPE CREEK GENERATING STATION SALEM NUCLEAR GENERATING STATION.

UNIT NOS. 1AND2 PLANNED EMERGENCY ACTION LEVELS CHANGE REQUEST Name Organization Carleen Parker U.S. Nuclear Regulatory Commission (NRC) Stephen Koenick NRC Raymond Hoffman NRC Paul Duke* PSEG Nuclear LLC (PSEG) David Robillard*

PSEG David Burgin* PSEG Phillip Quick* PSEG Emily Bauer* PSEG Thomas Headman*

PSEG Larry Sinclair*

PSEG Kelly Walker* Operations Support Services, Inc.

  • by telephone Enclosure ( d) Wall board or other operator aid and basis document.

(e) Deviation matrix with basis. (3) The licensee's submittal should not contain safeguards information, in accordance with NEI 99-01, Revision

6. The NRC staff intends to make the submittal and the review documents (requests for additional information (RAls), safety evaluation, etc.) publicly available.

(4) The more information submitted with the initial request, the less RAls the NRC staff anticipates needing.

The licensee indicated that it has already incorporated all of the information the NRC staff listed in its draft and that the LAR will not include any safeguards information.

Members of the public were not in attendance.

No public meeting feedback forms were received.

Please direct any inquiries to me at 301-415-1603 or by e-mail to Carleen.Parker@nrc.gov.

Docket Nos. 50-354, 50-272, and 50-311

Enclosure:

List of Attendees cc w/enclosure:

Distribution via Listserv DISTRIBUTION:

PUBLIC LPL 1-2 R/F RidsACRS_MailCTR Resource RidsNrrDorlLpl1 Resource RidsNrrLALRonewicz Resource RidsRgn 1 MailCenter Resource ADAMS A ccess1on N ML 16347A393 o.: OFFICE DORL/LPL 1/PM DORL/LPL 1/LA NAME CParker LRonewicz DATE 12/15/16 12/15/16 Sincerely,

/RA/ Carleen J. Parker, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsNrrPMHopeCreek Resource RidsNrrPMSalem Resource RidsNsirDpr Resource

RHoffman, NSIR JBowen, OEDO TWertz, NRR NSI R/DPR/RLB/BC DORL/LPL 1/BC(A) JAnderson SKoenick wt comments*

12/16/16 12/23/16

  • b *1 1yema1 DORL/LPL 1/PM CParker 01/05/17 OFFICIAL RECORD COPY