|
---|
Category:Inspection Plan
MONTHYEARIR 05000352/20240052024-08-29029 August 2024 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2024005 and 05000353/2024005) ML24150A0242024-05-29029 May 2024 Notification of Commercial Grade Dedication Inspection (05000352/2024012 and 05000353/2024012) and Request for Information IR 05000352/20230062024-02-28028 February 2024 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2023006 and 05000353/2023006) IR 05000352/20240112024-01-31031 January 2024 Information Request to Support Post-Approval Site Inspection for License Renewal; Inspection Report 05000352/2024011 ML23269A0522023-09-26026 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000352/2023010 and 05000353/2023010 IR 05000352/20230052023-08-31031 August 2023 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2023005 and 05000353/2023005) IR 05000352/20220062023-03-0101 March 2023 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2022006 and 05000353/2022006) IR 05000352/20220052022-08-31031 August 2022 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2022005 and 05000353/2022005) IR 05000352/20210062022-03-0202 March 2022 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2021006 and 05000353/2021006) IR 05000352/20210052021-09-0101 September 2021 Updated Inspection Plan for the Limerick Generating Station, Units 1 and 2 (Report 05000352/2021005 and 05000353/2021005) IR 05000352/20200062021-03-0303 March 2021 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2020006 and 05000353/2020006) ML20293A1712020-10-19019 October 2020 Information Request to Support Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000352/2021010 and 05000353/2021010 IR 05000352/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Report 05000352/2020005 and 05000353/2020005) ML20183A3192020-07-0101 July 2020 Information Request to Support Triennial Baseline Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000352/2020014 and 05000353/2020014 IR 05000352/20190062020-03-0303 March 2020 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Report 05000352/2019006 and 05000353/2019006) ML19254A6312019-09-0909 September 2019 Information Request for the Cyber-Security Inspection, Notification to Perform Inspection 05000352/2020401 and 05000353/2020401 IR 05000352/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Reports 05000352/2019005 and 05000353/2019005) IR 05000352/20180062019-03-0404 March 2019 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2018006 and 05000353/2018006) IR 05000352/20180052018-08-28028 August 2018 Updated Inspection Plan (Inspection Report 05000352/2018005 and 05000353/2018005) IR 05000352/20170062018-02-28028 February 2018 Annual Assessment Letter for Limerick Generating Station-Units 1 and 2 (Report 05000352-2017006 and 05000353-2017006-Report 05000352-2017402 and 05000353-2017402-Report 05000352-2017501 and 05000353-2017501) IR 05000352/20170052017-08-28028 August 2017 Updated Inspection Plan for Limerick Generating Station Units 1 and 2 (Report 05000352/2017005 and 05000353/2017005) IR 05000352/20160062017-03-0101 March 2017 Annual Assessment Letter for Limerick Generating Station Units 1 and 2 - Report Nos. 05000352/2016006 and 05000353/2016006 IR 05000352/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Limerick Generating Station Units 1 and 2 (Report 05000352/2016005 and 05000353/2016005) IR 05000352/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Limerick Generating Station, Units 1 & 2 (Inspection Report 05000352/2015006 & 05000353/2015006) IR 05000352/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Limerick Generating Station, Units 1 and 2 (Report 05000352/2015005 and 05000353/2015005) IR 05000352/20140012015-03-0404 March 2015 ROP 15 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Report 05000352/2014001 and 05000353/2014001) IR 05000352/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000352/2014006 and 05000353/2014006 IR 05000352/20130012014-03-0404 March 2014 ROP-14 2013 Limerick Generating Station Annual Assessment Letter for Report 05000352/2013001 and 05000353/2013001, and Inspection Plan IR 05000352/20130062013-09-0303 September 2013 ROP-14 Mid-Cycle Performance Review and Inspection Plan Report 05000352/2013006 and 05000353/2013006 IR 05000352/20120012013-03-0404 March 2013 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Report 05000352/2012001 and 05000353/2012001) ML13031A4462013-01-31031 January 2013 Notification of Conduct of Triennial Fire Protection Baseline Inspection ML12248A0252012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Limerick Generating Station IR 05000352/20110012012-03-0505 March 2012 Annual Assessment Letter for Limerick Generating Station (Report 05000352-11-001 and 05000353-11-001) ML1124113542011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Limerick Generating Station IR 05000352/20100012011-03-0404 March 2011 Annual Assessment Letter for Limerick Generating Station, EOC-11 (05000352/2010001 and 05000353/2010001) ML1024405552010-09-0101 September 2010 Mid-Cycle Assessment Letter 2010 - Limerick Generating Station Units 1 and 2 ML1006210902010-03-0303 March 2010 EOC Letter and Report 22 ML0924402372009-09-0101 September 2009 Mid-Cycle Assessment Letter - Limerick Generating Station (September 1, 2009) IR 05000352/20090012009-03-0404 March 2009 Annual Assessment Letter - Limerick Generating Station (05000352-09-001 and 05000353-09-001) ML0824704412008-09-0202 September 2008 2008 Mid-Cycle Assessment Letter and Inspection Plan - Limerick ML0806004312008-03-0303 March 2008 Annual Assessment Letter ML0724305792007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan, for 07/01/2007 - 12/31/2008 IR 05000352/20070012007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Limerick Station (05000352-07-001 and 05000353-07-001) IR 05000352/20060012006-03-0202 March 2006 Annual Assessment Letter - Limerick Generating Station (Report 05000352/2006001 and 05000353/2006001) ML0524207032005-08-30030 August 2005 2005 Mid-Cycle Review and Inspection Plan - Limerick ML0506106412005-03-0202 March 2005 Annual Assessment Letter 2005001 - Limerick ML0406301852004-03-0202 March 2004 2003-04 Annual Assessment Letter - Limerick IR 05000352/20030012003-03-0303 March 2003 2003 Annual Assessment Letter - Limerick Generating Station (Report 50-352/03-01, 50-353/03-01) IR 05000352/20020012002-03-0101 March 2002 2002 Annual Assessment Letter - Limerick Generating Station (Report 50-352/02-01, 50-353/02-01) 2024-08-29
[Table view] Category:Letter
MONTHYEARML24318A9432024-11-13013 November 2024 – Notification of Conduct of Phase II Inspection of Title 10 of the Code of Federal Regulations 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactor ML24310A0062024-11-0808 November 2024 – Acceptance of Requested Licensing Action Modification to Technical Specifications 3.6.1.2 and Main Stem Isolation Valve Leakage Requirements Amendment IR 05000352/20240032024-11-0808 November 2024 Integrated Inspection Report 05000352/2024003 and 05000353/2024003 ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums ML24151A3842024-10-31031 October 2024 – Issuance of Amendment Nos. 264 and 226 Support to Digital Modernization Project Installation (EPID L-2023-LLA-0025) and Exemption from the Requirements of 10 CFR 50.62 ML24303A0902024-10-29029 October 2024 Operator Licensing Examination Approval ML24303A2782024-10-29029 October 2024 10 CFR 50.46 Annual Report ML24299A2642024-10-25025 October 2024 Response to Request for Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications IR 05000352/20240122024-10-17017 October 2024 Commercial Grade Dedication Inspection Report 05000352/2024012 and 05000353/2024012 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24274A2372024-10-0707 October 2024 – Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications ML24278A3022024-10-0404 October 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10 CFR 50.62 ATWS Rule to Support the Digital Modernization Project Installation - Rev Unit 2 Technical Spec ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A0032024-09-27027 September 2024 Generation Station, Units 1 and 2 – Regulatory Audit Plan Supporting Review of the Component Interface Module System of the Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) (Redacted) ML24243A0482024-09-19019 September 2024 Generation Station, Unit Nos. 1 and 2 - Schedule Update for License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24215A4042024-09-18018 September 2024 Request for Withholding Information from Public Disclosure IR 05000352/20244202024-09-16016 September 2024 – Security Baseline Inspection Report 05000352/2024420 and 05000353/2024420 RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds IR 05000352/20250102024-09-10010 September 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000352/2025010 and 05000353/2025010 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000352/20230022024-09-0404 September 2024 Reissued Integrated Inspection Report 05000352/2023002 and 05000353/2023002 IR 05000352/20240052024-08-29029 August 2024 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2024005 and 05000353/2024005) ML24241A1952024-08-28028 August 2024 License Amendment Request for Modification to Technical Specification 3.6.1.2 and Main Steam Isolation Valve Leakage Rate Requirements ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24163A3902024-08-14014 August 2024 Request for Withholding Information from Public Disclosure ML24220A2392024-08-12012 August 2024 Correction to Technical Specification Page 3/4 3-11 in Amendment No. 225 IR 05000352/20240022024-08-12012 August 2024 Integrated Inspection Report 05000352/2024002 and 05000353/2024002 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24204A0712024-07-29029 July 2024 Issuance of Amendment Nos. 263 and 225 Technical Specifications for Main Steam Line Tunnel Temperature ML24208A1592024-07-25025 July 2024 Regulatory Audit Plan Supporting Review of the System Development Portion of Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) - Non-Proprietary ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24201A1662024-07-19019 July 2024 Response to Request for Additional Information for License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam L ML24199A1842024-07-15015 July 2024 RAI-LAR for Limerick EPID: L-2024-LLA-0079- Use This Version RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML24180A1572024-06-28028 June 2024 Request to Return and Replace WEC Documents (EQ-EV-386-GLIM, EQ-QR- 433-GLIM, and APP-GW-GLR-611), to Meet 10CFR2.390 Request to Withdraw from Public Disclosure Requirements ML24170A7702024-06-20020 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, Opportunity for Hearing(Epid L-2024-LLA-0079) LTR 05000352/LER-2024-003, Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK1232024-06-18018 June 2024 Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK123 ML24166A1142024-06-14014 June 2024 Response to Requests for Additional Information (RAIs 15 Through 23) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24165A2642024-06-13013 June 2024 License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam Line Tunnel Temperature TS 3/4.7.9 05000352/LER-2024-002, Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker2024-06-10010 June 2024 Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker 05000352/LER-2024-001, Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit2024-06-10010 June 2024 Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit ML24151A2882024-06-10010 June 2024 Request for Withholding Information from Public Disclosure ML24151A2012024-06-10010 June 2024 Request for Withholding Information from Public Disclosure ML24150A0242024-05-29029 May 2024 Notification of Commercial Grade Dedication Inspection (05000352/2024012 and 05000353/2024012) and Request for Information ML24149A2112024-05-28028 May 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 IR 05000352/20243022024-05-20020 May 2024 Revised Initial Operator Licensing Examination Report 05000352/2024302 and 05000353/2024302 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report 2024-09-06
[Table view] |
Text
[Type here]
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.
KING OF PRUSSIA, PA 19406
-2713 March 1, 2017 Mr. Bryan Hanson Senior Vice President, Exelon Generation Co., LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd.
Warrenville, IL 60555
SUBJECT: ANNUAL ASSESSMENT LETTER FOR LIMERICK GENERATING STATION UNITS 1 AND 2
- REPORT NOS
. 05000352/201600 6 AND 05000353/2016006
Dear Mr. Hanson:
The U.S. Nuclear Regulatory Commission (
NRC) has completed its end
-of-cycle performance assessment of Limerick Generating Station (LGS) Units 1 and 2
, reviewing performance indicators (PIs)
, inspection results
, and enforcement actions from January 1, 2016 through December 31, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.
The NRC determined the performance at LGS Units 1 and 2 during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRC
's Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e.,
Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31
, 2018. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan.
Additionally, the NRC plans to conduct temporary instruction (TI) 192, Inspection of the Licensee's Interim Compensatory Measures Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems
. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
This inspection plan does not include the plan for security
-related inspections, which will be sent via separate, non
-publicly available correspondence. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC
's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC
's Website at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 610-337-5262 with any questions you have regarding this letter.
Sincerely,/RA/ Daniel L. Schroeder, Chief Reactor Projects Branch 4 Division of Reactor Projects
Docket Nos.
50-352 and 50
-353 License Nos.
NPF-39 and NPF-85
Enclosure:
Inspection/Activity Plan SUBJECT: ANNUAL ASSESSMENT LETTER FOR LIMERICK GENERATING STATION UNITS 1 AND 2
- (REPORT NOS
. 05000352/201600 6 AND 05000353/2016 006) DATED MARCH 1, 2017 DISTRIBUTION
- (via email)
DDorman, RA DLew, DRA MScott, DRP DPelton, DRP RLorson, DRS JYerokun, DRS DSchroeder, DRP SBarber, DRP Kevin Heller, DRP SRutenkroger, DRP, SRI MFannon, DRP, RI NEsch, DRP, AA JBowen, RI, OEDO RidsNrrPMLimerick Resource RidsNrrDorlLpl1
-2 Resource ROPreports Resource ROPassessment.Resource@nrc.gov RMcKinley, DRS WCook, DRS MGray, DRS DJackson, DRS DTifft, RI. SLO JGreives, SLO DScrenci, RI, PAO NSheehan, RI, PAO RidsNrrDirslpab Resource DOCUMENT NAME:
S:\ROP Assessment Meetings
\ROP-17 EOC Review
\Branch 4\LIM ROP-17 EOC Annual Assessment Letter.docx ADAMS ACCESSION NUMBER:
ML17055C205 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SBarber/SB DSchroeder/DS DATE 2/24/17 2/24/17 OFFICIAL RECORD CO PY LimerickInspection / Activity Plan 01/01/2017
-12/31/2018 UnitNumberReport 22 No. of Staff on SitePlanned Dates Start EndInspection ActivityTitlePage 1 of 2 02/03/2017 14:53:06 42/6EXAM-LIMERICK INITIAL OL EXAM 1 01/15/2017 01/19/2017 U01940FY17-LIMERICK INITIAL OPERATOR LICENSING EXAM 350.59-EVALS OF CHANGES, TESTS, & EXPERIMENTS 1,2 03/06/2017 03/10/2017 IP7111117T-
5059scrnscreenings and/or applicability determinations 1HP-RADIATION SAFETY - CLOSEOUT 02,03,04,05 1,2 03/13/2017 03/17/2017 IP71124.02Occupational ALARA Planning and Controls 1,2 03/13/2017 03/17/2017 IP71124.03In-Plant Airborne Radioactivity Control and Mitigation 1,2 03/13/2017 03/17/2017 IP71124.04Occupational Dose Assessment 1,2 03/13/2017 03/17/2017 IP71124.05Radiation Monitoring Instrumentation 17111108G-U2 INSERVICE INSPECTION 2 04/24/2017 04/28/2017 IP7111108GInservice Inspection Activities - BWR 1HP-RADIATION SAFETY - RAD HAZARDS 1,2 04/24/2017 04/28/2017 IP71124.01Radiological Hazard Assessment and Exposure Controls 412/17EXM-DECEMBER 2017 LIMERICK INITIAL EXAM 1 11/20/201711/24/2017 U01956FY18-LIMERICK INITIAL OPERATOR LICENSING EXAM 1 12/18/2017 12/22/2017 U01956FY18-LIMERICK INITIAL OPERATOR LICENSING EXAM 17111107T-TRIENNIAL HEAT SINK 1,2 07/17/2017 07/21/2017 IP7111107THeat Sink Performance 1HP-RADIATION SAFETY - REMP 1,2 08/28/2017 09/01/2017 IP71124.07Radiological Environmental Monitoring Program 27111111B-LIMERICK REQUAL INSP W/ P/F RESULTS 1,2 10/23/2017 10/27/2017 IP7111111ALicensed Operator Requalification Program - Annual Review 1,2 10/23/2017 10/27/2017 IP7111111BLicensed Operator Requalification Program 4EP-EP EXERCISE EVALUATION 1,2 11/13/201711/17/2017 IP7111401Exercise Evaluation 1,2 11/13/201711/17/2017 IP71151Performance Indicator Verification 37111121N-EQ PROGRAM 1,2 10/23/2017 10/27/2017 IP7111121NComponent Design Bases Inspection (Programs)
1,2 11/06/201711/10/2017 IP7111121NComponent Design Bases Inspection (Programs)
1HP-RADIATION SAFETY - RAD HAZ & PIV 1,2 12/04/2017 12/08/2017 IP71124.01Radiological Hazard Assessment and Exposure Controls 1,2 12/04/2017 12/08/2017 IP71151-OR01Occupational Exposure Control Effectiveness 1,2 12/04/2017 12/08/2017 IP71151-PR01RETS/ODCM Radiological Effluent Occurrences This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
LimerickInspection / Activity Plan 01/01/2017
-12/31/2018 UnitNumberReport 22 No. of Staff on SitePlanned Dates Start EndInspection ActivityTitlePage 2 of 2 02/03/2017 14:53:06 171124.08-RADWASTE1,2 01/08/2018 01/12/2018 IP71124.08Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1HP-RADIATION SAFETY - ALARA 1,2 02/05/2018 02/09/2018 IP71124.02Occupational ALARA Planning and Controls 1HP-RADIATION SAFETY - RAD HAZ 1,2 04/02/2018 04/06/2018 IP71124.01Radiological Hazard Assessment and Exposure Controls 1,2 04/02/2018 04/06/2018 IP71124.02Occupational ALARA Planning and Controls 1,2 04/02/2018 04/06/2018 IP71124.03In-Plant Airborne Radioactivity Control and Mitigation 2U1 ISI-UNIT 1 INSERVICE INSPECTION 1 04/02/2018 04/06/2018 IP7111108GInservice Inspection Activities - BWR 411/18EXM-NOVEMBER 18 LIMERICK INITIAL EXAM (FY19)
1 10/22/2018 10/26/2018 U01971FY19- LIMERICK INITIAL OPERATOR LICENSING EXAM 1 11/19/201811/23/2018 U01971FY19- LIMERICK INITIAL OPERATOR LICENSING EXAM 1HP-RADIATION SAFETY - AIRBORNE 1,2 05/14/2018 05/18/2018 IP71124.03In-Plant Airborne Radioactivity Control and Mitigation 67111121M-DESIGN BASES ASSURANCE INSPECTION (TEAM)
1,2 06/11/2018 06/15/2018 IP7111121MComponent Design Bases Inspection (Teams)
1,2 06/25/2018 06/29/2018 IP7111121MComponent Design Bases Inspection (Teams)
171152B-PI&R BIENNIAL 1,2 10/15/2018 10/19/2018 IP71152BProblem Identification and Resolution 1,2 10/29/201811/02/2018 IP71152BProblem Identification and Resolution 1EP-EP PROGRAM INSPECTION 1,2 12/03/2018 12/07/2018 IP7111402Alert and Notification System Testing 1,2 12/03/2018 12/07/2018 IP7111403Emergency Preparedness Organization Staffing and Augmentation System 1,2 12/03/2018 12/07/2018 IP7111405Correction of Emergency Preparedness Weaknesses and Deficiencies 1,2 12/03/2018 12/07/2018 IP71151Performance Indicator Verification 1HP-RADIATION SAFETY - DOSIMETRY & PIV 1,2 11/12/201811/16/2018 IP71124.04Occupational Dose Assessment 1,2 11/12/201811/16/2018 IP71151-OR01Occupational Exposure Control Effectiveness 1,2 11/12/201811/16/2018 IP71151-PR01RETS/ODCM Radiological Effluent Occurrences Comments:
This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.