|
---|
Category:Letter
MONTHYEARML24025A0992024-01-25025 January 2024 Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML24018A0792024-01-22022 January 2024 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed Nshcd and Opportunity for a Hearing (EPID L-2024-LLA-0007) (Letter) ML24018A1382024-01-18018 January 2024 Inservice Inspection Request for Information ML24018A2482024-01-18018 January 2024 License Amendment Request to Modify the Implementation Date of License Amendment No. 238 IR 05000482/20230042024-01-11011 January 2024 Integrated Inspection Report 05000482/2023004 ML23356A0722024-01-0404 January 2024 Supplemental Information Needed for Acceptance of Requested Licensing Actions Exemption from Specific 10 CFR Part 73N Requirements (EPID L-2023-LLE-0048) (Redacted Version) WO 23-0002, Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082023-12-26026 December 2023 Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 ML23348A3662023-12-18018 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000482 2024012) and Request for Information ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23299A2662023-11-29029 November 2023 Issuance of Amendment No. 238 Modified Implementation Date of License Amendment No. 237 ML23331A4972023-11-27027 November 2023 Supplement to License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23325A2112023-11-20020 November 2023 Submittal of Request for Exemption from Specific Provisions in 10 CFR 73.55 ML23320A2772023-11-16016 November 2023 License Amendment Request to Revise Ventilation Filter Testing Program Criteria in Technical Specification 5.5.11.b and Administrative Correction of Absorber in Technical Specification 5.5.11 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML23292A3592023-10-19019 October 2023 License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23292A3572023-10-19019 October 2023 Operating Corporation, Request for Correction in Response to Issuance of Amendment No. 237 and Corresponding Safety Evaluation ML23277A2772023-10-11011 October 2023 Regulatory Audit Summary Concerning Review of Request Number CI3R-01 for Proposed Alternative Inspection Frequency for Containment Unbonded Post Tensioning System Components ML23284A2392023-10-11011 October 2023 NRC Initial Operator Licensing Examination Approval 05000482/2023301 ML23276B4552023-10-0303 October 2023 Technical Specification 5.6.8 Post Accident Monitoring (PAM) Report ML23264A8682023-09-21021 September 2023 Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L ML23256A2062023-09-14014 September 2023 Withdrawal of Requested Licensing Action Exemption from Specific 10 CFR Part 73 Requirements ML23165A2502023-08-31031 August 2023 Issuance of Amendment No. 237 Request for Deviation from Fire Protection Requirements ML23243A0002023-08-31031 August 2023 Wolf Generating Station - Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements IR 05000482/20230052023-08-23023 August 2023 Updated Inspection Plan for Wolf Creek Nuclear Operating Corporation, Unit 1 (Report 05000482/2023005) - Mid-Cycle Letter 2023 ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 ML23221A3932023-08-0909 August 2023 Submittal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML23220A4222023-08-0808 August 2023 Supplement to License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ML23201A1212023-08-0707 August 2023 Issuance of Amendment No. 236 Revision to Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML23130A2902023-07-26026 July 2023 Issuance of Amendment No. 235 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections IR 05000482/20230022023-07-11011 July 2023 Integrated Inspection Report 05000482/2023002 ML23167A0042023-06-26026 June 2023 Audit Plan to Support Review of Request for Alternative Containment Inservice Inspection Frequency IR 05000482/20234012023-06-21021 June 2023 Security Baseline Inspection Report 05000482/2023401 ML23171B1312023-06-20020 June 2023 Additional Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML23151A4162023-05-31031 May 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components2023-05-17017 May 2023 CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components WO 23-0014, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23132A1532023-05-12012 May 2023 Transmittal of 2022 Annual Financial Reports WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) ML23135A1172023-05-0808 May 2023 Redacted Version of Revision 36 to Updated Safety Analysis Report ML23117A2112023-04-27027 April 2023 Annual Exposure Report (2022) ML23117A1342023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report Report 46 2024-01-04
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML23135A1682023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML23135A1252023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 2, Figures ML23135A1642023-05-0808 May 2023 6 to Updated Safety Analysis Report, Cover Sheet ML23135A1692023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 4, Reactor ML23135A1232023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 11, Figures ML23135A1662023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 2, Site Characteristics ML23135A1172023-05-0808 May 2023 Redacted Version of Revision 36 to Updated Safety Analysis Report ML23135A1212023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 7, Figures ML23135A1762023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML23135A1812023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 15, Accident Analysis ML23135A1842023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 18, Response to NUREG-0737 Clarification of TMI Action Plan Requirements - Part 1 of 2 ML23135A1742023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 8, Electric Power ML23135A1822023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 16, Relocated Technical Specifications ML23135A1272023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 12, Figures, Redacted ML23135A1282023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 18, Figures ML23135A1782023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 12, Radiation Protection ML23135A1732023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 7, Instrumentation and Controls ML23135A1802023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 14, Initial Test Program ML23135A1712023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 6, Engineered Safety Features ML23135A1672023-05-0808 May 2023 6 to Updated Safety Analysis Report, Figures ML23135A1752023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems ML23135A1242023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 5, Figures ML23135A1652023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant ML23135A1262023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 1, Figures - Redacted ML23135A1772023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 11, Radioactive Waste Management ML23135A1192023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 8, Figures ML23135A1832023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 17, Quality Assurance ML23135A1222023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 10, Figures ML23135A1182023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 6, Figures ML23135A1792023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 13, Conduct of Operations ML23135A1852023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 18, Response to NUREG-0737 Clarification of TMI Action Plan Requirements - Part 2 of 2 ML23135A1202023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 9, Figures, Redacted ML23135A1702023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML23135A1862023-05-0808 May 2023 6 to Updated Safety Analysis Report, List of Effective Pages (Loep) ML22152A1732022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 11, Figures ML22151A1432022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 13, Conduct of Operations ML22152A1702022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 9, Figures ML22151A1422022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 18, Response to NUREG-0737 Clarification of TMI Action Plan Requirements - Part 1 of 2 ML22151A1442022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 14, Initial Test Program ML22152A1782022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 18, Figures ML22152A1692022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 8, Figures ML22151A1462022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 16, Relocated Technical Specifications ML22151A1562022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 6, Engineered Safety Features ML22152A1752022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 2, Figures ML22152A1722022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 10, Figures ML22151A1452022-05-18018 May 2022 5 to Updated Safety Analysis Report, List of Table of Contents ML22151A1542022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22152A1682022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 6, Figures ML22151A1362022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22152A1772022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 12, Figures - Redacted 2023-05-08
[Table view] |
Text
I I ' Cleveland Reasoner Site Vice President W$LFCREEK
'NUCLEAR OPERATING CORPORATION March 8, 2018 WO 18-0011 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Subject:
Docket No. 50-482: Redacted Version of Revision 31 of the Wolf Creek Generating Station Updated Safety Analysis Report To Whom It May Concern:
Pursuant to the updating requirements of 10 CFR 50.71 (e), Wolf Creek Nuclear Operating Corporation (WCNOC) submitted its Updated Safety Analysis Report (USAR), Revision 31, on March 8, 2018. The submittal satisfied the Final Safety Analysis Report (FSAR) updating requirements of the aforementioned regulation.
A redacted USAR is being provided in accordance with the guidance of Regulatory Issue Summary (RIS) 2015-17, dated December 23, 2015. Enclosure I to this letter provides the ROM submittal of the redacted version of the Wolf Creek Generating Station (WCGS) USAR, Revision
- 31. Enclosure II to this letter provides a CD-ROM containing the redacted station-controlled drawings that are incorporated by reference into the USAR. Enclosure Ill to this letter provides a CD-ROM containing the Quality Program Manual, redacted USAR Fire Hazards Analysis, EQSD-1, EQ Summary Document Section I Program Description, and redacted EQSD-11, Equipment Qualification Summary Document Master List Section II, all of which are considered incorporated by reference into the WCGS USAR. EQSD-1 and EQSD-11 contain information from USAR Table 3.11 (B)-1, Plant Environmental Normal Conditions; USAR Table 3.11 (B)-2, Environmental Qualification Parameters for SNUPPS NUREG-0588 (LOCA, MSLB and HELB); USAR Table 3.11 (B)-3, Identification of Safety-Related Equipment and Components:
Equipment Qualification; USAR Table 3.11 (B)-4, Containment Worst Case Radiation Levels (MRADs);
USAR Table 3.11 (B)-5, Containment Spray Requirements; USAR Table 3.11 (B)-8, Exemptions from NUREG-0588 Qualification; USAR Table 3.11(B)-10, Equipment Added for NUREG-0737; and USAR Figures 3.11 (B)-1 through 3.11 (B)-49, all of which are incorporated by reference into the USAR. P.O. Box 411 / Burlington, KS 66839 / Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HCNET I . WO 18-0011 Page 2 of 2 As a duly authorized officer of WCNOC and in accordance with 10 CFR 50.71 (e)(2), I certify that the information in this submittal accurately presents changes made since the previous submittal dated March 9, 2017, and that this submittal has been prepared pursuant to a Nuclear Regulatory Commission requirement.
This letter contains no commitments.
If you have any questions concerning this matter, please contact me at (620) 364-4171, or Cynthia R. Hafenstine at (620) 364-4204.
COR/rlt Enclosure I -Enclosure 11 -Enclosure Ill -Cleveland Reasoner CD-ROM containing redacted Updated Safety Analysis Report, Revision 31 CD-ROM containing redacted Updated Safety Analysis Report Controlled Figure Drawings CD-ROM containing Quality Program Manual, redacted Updated Safety Analysis Report Fire Hazards Analysis, EQSD-1 and redacted EQSD-11 Enclosure I to WO 18-0011 Page 1 of 2 Enclosure I to WO 18-0011 CD-ROM containing redacted Updated Safety Analysis Report, Revision 31 Enclosure I to WO 18-0011 Page 2 of 2 Subject Enclosed is the CD-ROM submittal of the Wolf Creek Generating Station redacted Updated Safety Analysis Report (WCGS USAR), Revision
- 31. Lucille Stone Contact Name Mailing Address Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 lurocke@wcnoc.com E-Mail Address Phone Number 620-364-8831 ext. 4898 Document Components:
The CD-ROM labeled "WCGS Redacted USAR, Rev 31" contains the following files: 001_USAR.pdf 002_USARC01.pdf 003_USARC02.0.pdf 004_USARC02 Figures.pdf 005_USARC03_Redacted.pdf 006_USARC04.pdf 007 _USARC05.pdf 008_USARC06.pdf 009_USARC07.pdf 01 O_USARC08.pdf 011_USARC09.pdf 012_USARC1 O.pdf 013_USARC11.pdf 014_USARC12.pdf 015_USARC13.pdf 016_USARC14.pdf 017 _USARC15.pdf 018_USARC16.pdf 019.:._USARC17.pdf 020_USARC18_Redacted.pdf 021_USARNRCQ.pdf 022_USAR Rev. 31-loep.pdf 269 KB, publicly available 926 KB, publicly available 34.8 MB, publicly available 35.5 MB, publicly available 16.4 MB, publicly available 2.3 MB, publicly available 2.4 MB, publicly available 11.5 MB, publicly available 1.9 MB, publicly available 1.9 MB, publicly available 4.6 MB, publicly available 1.5 MB, publicly available 1.0 MB, publicly available 876 KB, publicly available 562 KB, publicly available 376 KB, publicly available 6.3 MB, publicly available 56 KB, publicly available 64 KB, publicly available 1.2 MB, publicly available 376 KB, publicly available 396 KB, publicly available Enclosure II to WO 18-0011 Page 1 of 2 Enclosure II to WO 18-0011 CD-ROM containing redacted Updated Safety Analysis Report Controlled Figure Drawings Enclosure II to WO 18-0011 Page 2 of 2 I Subject Enclosed is the CD-ROM submittal of the Wolf Creek Generating Station Updated Safety Analysis Report (WCGS USAR) redacted controlled figure drawings that are incorporated by reference into the WCGS USAR. Lucille Stone Contact Name Mailing Address Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 lurocke@wcnoc.com E-Mail Address Phone Number 620-364-8831 ext. 4898 Document Components:
The CD-ROM labeled "WCGS USAR, Rev.31 Redacted Controlled Drawings" contains the following files: 001_Chapter 1_Redacted.pdf 002_Chapter 2.pdf 003_Chapter 5.pdf 004_Chapter 6.pdf 005_Chapter 7.pdf 006_Chapter 8.pdf 007 _Chapter 9_Redacted.pdf 008_Chapter 10.pdf 009_Chapter 11.pdf 010_Chapter 12_Redacted.pdf 011_Chapter 18.pdf 16.5 MB, publicly available 2.05 MB, publicly available 2.29 MB, publicly available 4.48 MB, publicly available 1.22 MB, publicly available 5.76 MB, publicly available 31.5 MB, publicly available 12.3 MB, publicly available
- 5. 70 MB, publicly available 731 KB, publicly available 497 KB, publicly available Enclosure Ill to WO 18-0011 Page 1 of 2 Enclosure Ill to WO 18-0011 CD-ROM containing Quality Program Manual, Redacted Updated Safety Analysis Report Fire Hazards Analysis, EQSD-1, and Redacted EQSD-11 Enclosure Ill to WO 18-0011 Page 2 of 2 Subject Enclosed is the CD-ROM submittal of the Wolf Creek Quality Program Manual (WCQPM),
WCGS USAR redacted Fire Hazards Analysis, EQSD-1, EQ Summary Document Section I Program Description, and redacted EQSD-11, Equipment Qualification Summary Document Master List Section II, all of which are considered incorporated by reference into the WCGS USAR. Lucille Stone Contact Name Mailing Address Wolf Creek Nuclear Operating Corporation P.O. Box 411 E-Mail Address Phone Number Burlington, KS 66839 lurocke@wcnoc.com 620-364-8831 ext. 4898 Document Components:
The CD-ROM labeled "WCGS USAR, Rev 31, Redacted Items Incorporated by Reference
-FHA, EQSD, WCQPM" contains the following files: 001_WCQPM Rev 1 OA.pdf 002_E-1 F9900 Rev 9_Redacted.pdf 003_E-1 F9905 Rev 8.pdf 004_E-1F9910 Rev 14 Page 1 to Fire Area C-13.pdf 005_E-1F9910 Rev 14 Fire Area C-14 to end of doc.pdf 006_9910-14-01.pdf 007 _E-1 F9915 Rev 9.pdf 008_XX-E-013 Rev 4.pdf 009_XX-E-013 Rev 4 CN002.pdf 010_XX-E-013 Rev 4 CN003.pdf 011_XX-E-013 Rev 4 CN004.pdf 012_EQSD-I Rev 13.pdf 013_EQSD-II Rev 28_Redacted.pdf 014_M-663-00017A W05 1 to 81-98.pd 015_M-663-00017A W05 81-99 to 82-40.pdf 016_M-663-00017A W05 82-41 to 86-2.pdf 017_M-663-00017 A W05 86-3 to 87-79. pdf 018_M-663-00017A W05 87-80 to 88-147.pdf 019_M-663-00017A W05 88-148 to 813-25.pdf 020_M-663-00017A W05 813-26 to G1A-63.pdf 021_M-663-00017A W05 G1A-64 to G1A-123.pdf 022_M-663-00017A W05 G1A-124 to G2A-3.pdf 023_M-663-00017A W05 G2B-1 to G2879.pdf 024_M-663-00017 A W05 Att G3 to G3D-26.pdf 025_M-663-00017A W05 G3D-27 to G4D-19.pdf 026_M-663-00017A W05 Att G5 to Att H.pdf 263 KB, publicly available 34.2 MB, publicly available 9.97 MB, publicly available 38.8 MB, publicly available 37.3 MB, publicly available 128 KB, publicly available 943 KB, publicly available
- 3. 72 MB, publicly available 440 KB, publicly available 541 KB, publicly available 1.23 MB, publicly available 10.8 MB, publicly available 12.0 MB, publicly available 23.6 MB, publicly available 25.0 MB, publicly available 39.3 MB, publicly available 24.2 MB, publicly available 38.9 MB, publicly available 29.2 MB, publicly available
- 13. 7 MB, publicly available 13.0 MB, publicly available 18.6 MB, publicly available 18.2 MB, publicly available 36.0 MB, publicly available 18.4 MB, publicly available 14.9 MB, publicly available